Author's supervision
Author's supervision is the right of the architect who authored a building to check on site that construction follows the architect's design.
What is author's supervision?
Author's supervision is the right of the author of an architectural work to watch construction. The author checks that the building work follows the author's design. Act 25/2025 Z. z. (the Building Act) calls it autorský dohľad and defines it in § 35 ods. 10. People still search for the older name autorský dozor, and many design contracts still use it. In this text "author's supervision" means the same thing as both Slovak names.
The act treats it as a right of the author. It does not describe it as a duty of the builder or as a service the builder must buy.
Is author's supervision mandatory?
No. Act 25/2025 Z. z. gives the author the right to supervise (§ 35 ods. 10), but § 30 does not list author's supervision among the duties of the builder. The builder must instead secure the designer's supervision, which is a different role (see the next section).
Two provisions support the right in practice. The author of the architectural work may enter the construction site for author's supervision. The site manager must know about the visit (§ 38 ods. 2 písm. d). The site manager must also allow the author to write in the construction diary (§ 39 ods. 2 písm. h).
The act does not say who pays the author or how often the author visits. Those points belong in the contract between the builder and the architect.
What is the difference between author's supervision and construction supervision?
Author's supervision checks the building against the author's design. A person whom the builder appoints does construction supervision (stavebný dozor). That person checks the works against the verified project and the technical rules. The act keeps these roles apart and adds two more, the designer's supervision and the state building inspection.
| Role | Who does it | What it checks | Required by the act? | Source |
|---|---|---|---|---|
| Author's supervision (autorský dohľad, old name autorský dozor) | The author of the architectural work | Conformity of the works with the author's design | No, it is a right of the author | § 35 ods. 10 |
| Designer's supervision (dohľad projektanta, also projektový dohľad) | The designer of the project | Conformity of the works with the project of the building | The builder must secure it during construction | § 35 ods. 10, § 30 ods. 4 písm. d) |
| Construction supervision (stavebný dozor) | A person appointed by the builder | Progress of the works against the verified project and the technical rules, products, diary | Yes for reserved buildings and for self-build | § 36, § 30 ods. 5 písm. a), § 30 ods. 6 písm. a) |
| State building inspection (štátny stavebný dohľad) | A building inspector of the state | Compliance of the building with the act, as a public control | It is not hired by the builder | § 71 |
The designer may also be the author. In that case one person holds both rights, but they are still two separate provisions in § 35 ods. 10. The act states that the designer's supervision does not affect the author's right.
What does the builder have to arrange by law?
The builder must secure the designer's supervision of the works during construction (§ 30 ods. 4 písm. d). For a reserved building (vyhradená stavba), the designer's supervision must run continuously. The builder must also keep a person authorised for construction supervision on the project for the whole period of the works (§ 30 ods. 5).
A builder who builds without a contractor must keep a person authorised for construction supervision for the whole period of the works (§ 30 ods. 6 písm. a). The page on owner-executed construction explains this case.
The designer is not responsible for changes and deviations from the verified project that the designer did not approve (§ 35 ods. 10). A builder who changes the design on site without the designer therefore carries that risk.
Who can perform author's supervision?
The act names the author of the architectural work (§ 35 ods. 10). It does not name another person for this role. The act on authorised architects and engineers also lists it. An architect may perform author's supervision when the architect is the author of the work (§ 4 písm. e of Act 138/1992 Zb.).
The act does not say how to prove authorship. The design contract usually names the author and says whether the author's supervision is included.
What does the architect do on site?
The Building Act does not list the tasks of the author. It gives the right to supervise and the rights to enter the site and to write in the diary. The scope is therefore a matter of the contract.
A contract for author's supervision usually fixes these points. This is contract practice, not a rule of the act:
- the number of site visits and the stages of the build in which they take place,
- whether the author checks selected details, such as facades, finishes and materials, or the whole building,
- how the author records findings, for example by an entry in the construction diary,
- who may approve a change to the design and how the change reaches the site manager,
- how the fee is calculated and when it is paid.
If the builder wants the author to see a change before the contractor makes it, the contract should say so in writing.
How much does author's supervision cost?
The Building Act sets no fee for author's supervision. The act on authorised architects states that an architect provides services for a fee (§ 11 ods. 1 of Act 138/1992 Zb.). It gives no price list.
The Slovak Chamber of Architects publishes standards of architects' services and a method to calculate the value of a commission. The standards page that was checked for this text does not mention author's supervision and gives no amount for it. A price therefore has to come from the quote of the architect. For the design fee itself, see architect fee.
How does author's supervision fit into the design stages?
Author's supervision happens while the building is built, after the project is verified. The documents that the builder gives to the contractor are the verified project and the decision on the building intent (§ 30 ods. 3 písm. b). The execution project is a further drawing set for reserved buildings (§ 30 ods. 5 písm. b).
At the end, the site manager writes a final opinion on the conformity of the building with the verified project. The builder attaches it to the proposal for occupancy approval (§ 66 ods. 2 písm. b). From 1 January 2027, Act 243/2026 Z. z. deletes this opinion from § 37 ods. 2 and from the list of attachments. The occupancy approval page explains that step.
What changes from 1 January 2027?
Act 243/2026 Z. z. amends the Building Act from 1 January 2027 for Articles I to XIII. It changes § 36 so that the person appointed for construction supervision has the duty (povinná) to carry out the listed tasks. In the version valid until 31 December 2026 the same person has the right (oprávnená) to do so. The amending act does not change the text of § 35 ods. 10 on author's supervision.
Frequently asked questions
- What is autorský dozor?
- Autorský dozor is the older name for the right of the author of an architectural work to supervise construction. Act 25/2025 Z. z. uses the term autorský dohľad in § 35 ods. 10. It checks that the works follow the author's design.
- Is author's supervision mandatory?
- No. The Building Act gives it to the author as a right (§ 35 ods. 10) and does not make the builder buy it. The builder must instead secure the designer's supervision during construction (§ 30 ods. 4 písm. d).
- What is the difference between author's supervision and construction supervision?
- Author's supervision checks the works against the author's design and is done by the author. Construction supervision is done by a person the builder appoints and checks the works against the verified project and technical rules (§ 36). Construction supervision is required for reserved buildings and for self-build.
- What is the difference between author's supervision and the designer's supervision?
- The designer's supervision (dohľad projektanta) checks the works against the project of the building. The author's supervision checks them against the author's design (§ 35 ods. 10). The builder must secure the designer's supervision (§ 30 ods. 4 písm. d). One person can be both.
- How much does author's supervision cost?
- The Building Act sets no fee for author's supervision. The architect and the builder agree the fee in the contract. Act 138/1992 Zb. only states that an architect provides services for a fee (§ 11 ods. 1).
- Who can perform author's supervision?
- Only the author of the architectural work, as § 35 ods. 10 of the Building Act names the author for this role. Act 138/1992 Zb. lists author's supervision among the activities of an architect who is the author of the work (§ 4 písm. e).
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 30 ods. 3 až 6, § 35 ods. 10, § 36, § 38 ods. 2, § 39 ods. 2, § 66 ods. 2, § 71
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Slov-Lex · čl. I, body 98 a 99
- Zákon č. 138/1992 Zb. o autorizovaných architektoch a autorizovaných stavebných inžinieroch · Slov-Lex · § 4 písm. e), § 11 ods. 1
- Štandardy služieb architektov · Slovenská komora architektov
- Change of a Building Before Completion 2026
- Choosing a Builder and Comparing Quotes
- Shell, Holodom or Turnkey: What You Buy
- Design Phases and the Payment Schedule
- From Study to Implementation Project: Documentation Stages
- Construction Supervisor, Site Manager, Author Supervision
- How Building a House in Slovakia Works, Plot to Occupancy
- How Much Does an Architect Cost, and What Do You Get?
- How Much Does a Family House Design Cost in 2026?