Owner-executed (self-build) construction

Owner-executed construction is a way to build for yourself without an authorised contractor, under the lead of an authorised supervisor.

What does owner-executed construction mean under Act 25/2025?

Owner-executed construction (svojpomocná výstavba) is the case where the builder has the building made for themselves without an authorised contractor. The act describes the case with the word svojpomocou. How much work the owner does with their own hands is not the test. The test is that no contractor answers for the whole building.

The Building Act (Act 25/2025 Z. z.) sets the default rule in § 26 ods. 2. The builder must have the building made by an authorised contractor, unless the builder holds the authorisation or the act says otherwise. Self-build is one of the cases where the act says otherwise.

Can you self-build a family house in Slovakia?

Yes, if the house is a simple structure (jednoduchá stavba) and an authorised person leads the works. Under § 26 ods. 3, a builder who is not an authorised contractor may have a simple structure made for themselves. A person authorised for construction supervision must lead the works.

Under § 2 ods. 6 písm. a), a simple structure includes a residential building that meets all of these conditions:

  • it has at most three dwellings,
  • its built-up area is not more than 300 m2,
  • it has at most two above-ground storeys, with one underground storey and an attic or set-back storey allowed in addition.

A typical detached family house fits this definition. From 1 January 2027, Act 243/2026 Z. z. moves the definition to § 2 ods. 9 and adds that a simple structure must not place higher demands on its design and construction. The size limits for a residential building stay the same in that amending act.

Can you self-build a reserved structure?

No. A reserved structure (vyhradená stavba) is a building or civil engineering work that is technologically demanding or unusual in construction (§ 2 ods. 8). The act says a certified contractor must build it (§ 31 ods. 5). The self-build rule in § 26 ods. 3 names simple structures, notified minor structures, alterations and maintenance, and it does not name reserved structures.

If your project is outside the simple-structure definition, the default rule applies again. You need an authorised contractor.

Who has to lead the works?

For a simple structure, a person authorised for construction supervision (stavebný dozor) leads the works (§ 26 ods. 3). For lighter work, the act accepts a professional lead with a lower qualification.

Type of workWho must lead itSource
Simple structure, including a family house within the definition aboveA person authorised for construction supervision§ 26 ods. 3
Notified minor structure (see minor structure notification)A person with a university degree in architecture, construction, mechanical or electrical engineering. Complete secondary technical education in one of these fields plus three years of practice also qualifies. The builder may lead the work if the builder meets this requirement.§ 26 ods. 3, second sentence
Alteration or maintenance of a buildingThe same professional lead as for a notified minor structure§ 26 ods. 3, second sentence
Reserved structureOutside self-build. A certified contractor builds it.§ 31 ods. 5

The same rules apply to a change of a completed building and to demolition (§ 26 ods. 5).

Who can act as the supervisor?

Construction supervision is a reserved activity (§ 34 ods. 2 písm. b). Only persons who hold the required authorisation may do reserved activities, and only within the scope of that authorisation (§ 34 ods. 1).

Construction supervision of alterations, minor structures and notified structures is not a reserved activity (§ 34 ods. 4 písm. b). A person with a relevant university degree, or with complete secondary technical education and three years of practice, may do it (§ 34 ods. 5). For a reserved structure, the supervisor must meet the authorisation requirements (§ 36 ods. 3).

The supervisor checks the progress of the works against the verified project and the technical rules. In a self-build, the supervisor discusses defects with the builder and demands their removal. The supervisor also writes the deviations that remain into the construction diary (§ 36 ods. 1).

What must a self-builder do during the build?

Under § 26 ods. 4, the self-builder coordinates the works and contracts each supplier of work, machinery and products individually. The self-builder is fully responsible for the duties under the act. Under § 30 ods. 6, the self-builder must:

  • keep a person authorised for construction supervision for the whole period of the works and follow that person's instructions,
  • use only workers who meet the qualification requirements of the act,
  • secure the setting-out so that the building stands where the verified project places it,
  • build in only construction products that suit the intended use, installed as the manufacturer prescribes,
  • keep the site equipment and operation in line with the act and related rules,
  • keep the verified project, the decision on the building intent and the construction diary on the site,
  • write the significant events and the progress of the works in the construction diary,
  • stop work at once and protect the site when the supervisor or the state building inspection orders it.

If the works uncover a find of possible heritage value, the duties of § 44 ods. 1 apply. On a self-build they apply to the builder (§ 44 ods. 4).

Is building without a supervisor an offence?

Yes. A person who builds for themselves without a person authorised for construction supervision commits an offence under § 79 ods. 2 písm. b). Failing to keep the project, the building intent decision and the diary available during self-build is an offence under § 79 ods. 1 písm. a).

From 1 January 2027, Act 243/2026 Z. z. adds more offences to § 79 ods. 4. One is self-build work in a protected area or a protection zone. Another is self-build work on land that the planning documentation excludes from building, such as agricultural or forest land. A third is not carrying out urgent work or structural securing that the state building inspection ordered, if the building endangers life or health.

What is the difference between self-build and a turnkey house?

A turnkey house (stavba na kľúč) is built by one contractor under one contract. The contract is a contract for work. In the Civil Code, the contractor agrees to carry out the work for the agreed price at the contractor's own risk (§ 631). The Commercial Code also treats building a structure as a work (§ 536 ods. 2). A private person who hires a firm usually contracts under the Civil Code. The page on contract for work explains the contract, and the page on the general contractor explains the role.

AspectSelf-buildContractor under a contract for work
Who coordinates the worksThe builder (§ 26 ods. 4)The contractor, through its own site manager
ContractsOne contract with each supplier (§ 26 ods. 4)One contract for the agreed scope
Responsibility under the Building ActThe builder, in full (§ 26 ods. 4)Shared according to the roles of the act
Construction supervisionRequired (§ 30 ods. 6 písm. a)Required only for reserved structures (§ 30 ods. 5 písm. a)
Warranty for defectsEach supplier gives its own warranty. The builder's own work has no contractor behind it.The contractor answers for defects. For a building, the Civil Code sets a warranty period of three years from handover (§ 646 ods. 3).

The act does not say that self-build is cheaper or faster. A saving depends on the work you do yourself, on the cost of mistakes and on the time you have.

What happens at the end of a self-build?

A new simple structure that needed a decision on the building intent needs occupancy approval (kolaudácia) before permanent use (§ 66 ods. 1). Until 31 December 2026, the proposal needs the construction diary, the final opinion of the site manager and the as-built documentation (§ 66 ods. 2). Other documents are also on the list. From 1 January 2027, the final opinion is no longer on the list. The record of handover (zápis o odovzdaní a prebratí stavby) must then include a declaration that the building conforms to the verified project. On a self-build, ask the building authority which person signs it. Agree early with the supervisor who prepares each of these documents.

Agree the supervisor before you order the first work. The supervisor leads the works, follows the verified project and may order a stop.

Frequently asked questions

Do I need a supervisor if I build my own house?
Yes. A builder who works without a contractor must keep a person authorised for construction supervision. This applies for the whole period of the works. The builder must follow that person's instructions (§ 30 ods. 6 písm. a). Building for yourself without one is an offence (§ 79 ods. 2 písm. b).
Can I build a family house svojpomocou?
Yes, if it is a simple structure. A residential building is one if it has at most three dwellings and at most two above-ground storeys. Its built-up area must not exceed 300 m2 (§ 2 ods. 6 písm. a). A person authorised for construction supervision must lead the works (§ 26 ods. 3).
Can I lead the works myself?
Only for lighter work. For notified minor structures, alterations and maintenance, the act accepts a lead with the required technical education and practice. The builder may be that person (§ 26 ods. 3). For a simple structure such as a house, the lead is the person authorised for construction supervision.
Who is responsible if something goes wrong on my site?
The builder is. The self-builder coordinates the works, contracts each supplier individually and is fully responsible for the duties under the act (§ 26 ods. 4). No contractor takes over that responsibility.
Can I self-build any building?
No. A reserved structure needs a certified contractor (§ 31 ods. 5). Self-build covers simple structures, notified minor structures, alterations and maintenance (§ 26 ods. 3). Ask the building authority if your project is near the limits of the simple-structure definition.
What is the difference between building svojpomocou and na kľúč?
In self-build, the builder coordinates the works and contracts each supplier. In a turnkey build, one contractor carries out the whole work under a contract for work (Civil Code § 631). A contractor gives a warranty of three years on a building (Civil Code § 646 ods. 3).

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 2 ods. 6 a 8, § 26, § 30 ods. 5 a 6, § 31 ods. 5, § 34, § 36, § 44 ods. 4, § 66, § 79
  2. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Slov-Lex · čl. I, body 13 a 197
  3. Zákon č. 40/1964 Zb. Občiansky zákonník · Slov-Lex · § 631, § 646 ods. 3
  4. Zákon č. 513/1991 Zb. Obchodný zákonník · Slov-Lex · § 536 ods. 2