Contractor

A contractor is a person who builds or demolishes a structure under contract and answers to the builder-developer for the finished work.

What is a contractor (zhotoviteľ stavby)?

A contractor is a person who builds or demolishes a structure under contract and answers to the builder-developer for the finished work. Zákon č. 25/2025 Z. z. (Stavebný zákon) calls this person the zhotoviteľ stavby (§ 31 ods. 1). The English word covers the same person as the Czech zhotovitel, the Polish wykonawca, the Hungarian kivitelező and the Ukrainian підрядник.

The contractor arranges the building work and other specialist activities through people who hold the authorisation for each kind of work (§ 31 ods. 1). A company may carry out an activity that needs a personal qualification only through a natural person who meets that requirement (§ 33 ods. 3). The act allows building work only under a verified project or a notification (§ 25).

Who can be a contractor in Slovakia?

A contractor needs the authorisation for two reserved activities: site supervision (stavebný dozor) and management of building work. The contractor must also pass an education and experience test (§ 31 ods. 2, § 34 ods. 2 písm. b a c). For a building the test has three levels.

EducationPractice in construction
Master's degree in architecture and urbanism or in constructionNone stated
Bachelor's degree in the same fieldsAt least 3 years
Full secondary vocational education in constructionAt least 5 years

The contractor of an engineering structure (inžinierska stavba) faces a separate test with other fields of study and other lengths of practice (§ 31 ods. 2). Only natural persons with the legally required qualification may carry out reserved activities, and only within the scope of that qualification (§ 34 ods. 1).

For structures that are not reserved structures, a person with a trade licence may also carry out site supervision and management of building work. That person must be professionally competent under the rules for regulated professions (§ 34 ods. 3). An authorisation obtained under the earlier rules counts as an authorisation under the act until 31 March 2029 (§ 84 ods. 20).

What is a general contractor and how does it relate to subcontractors?

A general contractor (generálny zhotoviteľ stavby) is a contractor that has a contract with the builder-developer for the whole structure (§ 31 ods. 3). Read more under general contractor.

Sometimes the whole structure needs kinds of work that the general contractor does not carry out. Then the general contractor uses contract suppliers (zmluvní dodávatelia). Each supplier must be a person described in § 31 ods. 1 and answers to the general contractor for its results (§ 31 ods. 3). The building office invites the general contractor to the occupancy inspection (§ 66 ods. 3).

What must a contractor do under the building act?

Section 32 ods. 2 lists 15 duties of the contractor. These are the ones that matter most to a builder-developer:

  • build in line with the verified project and with accepted working and technology procedures (písm. b)
  • make sure an authorised site manager (stavbyvedúci) leads the structure, and follow the site manager's instructions on organisation, schedule, order and waste removal (písm. c)
  • allow inspection by the building inspector (písm. e)
  • apply the occupational safety plan and follow the instructions of the safety coordinator (písm. f)
  • use only building products that suit the intended use, in the way the maker specifies (písm. g)
  • use only workers with the needed expertise, health fitness and authorisation (písm. h)
  • prepare the finished structure for the inspection and invite the designer and the builder-developer (písm. k)
  • hand over the structure and its documentation, and record the handover electronically in the information system (písm. l)
  • survey newly laid underground infrastructure before it is covered (písm. o)

During the works the contractor records agreed changes to the verified project in the construction diary. For the occupancy approval (kolaudácia) the contractor arranges the as-built documentation (dokumentácia skutočného zhotovenia stavby) (§ 32 ods. 3).

Who answers for defects and deviations from the project?

The contractor answers to the builder-developer that the finished structure complies with the technical requirements and the verified project. It must also comply with the fire protection, hygiene and technical regulations (§ 32 ods. 1). From 1 January 2027 this paragraph names the general technical requirements in place of the basic requirements for structures (Zákon č. 243/2026 Z. z., Art. I points 91 and 92).

The building act does not set how a defect is repaired or who pays for it. The contract and civil law decide that, and this page does not cover them. Other people also check for deviations. The designer and the person supervising for the builder-developer must require removal of deviations (§ 35 ods. 7 písm. b, § 36 ods. 1 písm. f).

How does a contractor differ from other roles on a building site?

RoleWho ensures the roleWhat the act gives the role
Builder-developer (stavebník)Owns the land or holds another right to buildIntends to carry out the works, from preparing the documents until the occupancy certificate (§ 29 ods. 1)
Contractor (zhotoviteľ stavby)Builder-developer, unless the builder-developer is authorised and builds alone (§ 26 ods. 2)Builds or demolishes the structure and answers for the result (§ 31, § 32)
Site manager (stavbyvedúci)Contractor (§ 32 ods. 2 písm. c)Organises, directs, coordinates and checks the building work and keeps the construction diary (§ 37 ods. 1, § 39 ods. 1)
Construction supervision (stavebný dozor)Builder-developer (§ 36 title, § 30 ods. 5 písm. a)Follows the works against the verified project and the technical rules (§ 36 ods. 1)
Designer (projektant)Builder-developerPrepares the project documents and may supervise the works for conformity with the project (§ 35)

Does a reserved structure need a certified contractor?

Yes. A reserved structure (vyhradená stavba) needs a certified contractor. The contractor must meet the certification scheme "Národný dokument" (§ 31 ods. 5). An accredited certification body issues the certificate (§ 31 ods. 7).

A contract supplier of the contractor may hold the certificate if it really takes part in the works (§ 31 ods. 10). A contractor without the certificate may carry out alterations and maintenance on a reserved structure (§ 31 ods. 12). A reserved structure is a building or engineering structure that is technologically demanding or structurally unusual (§ 2 ods. 8). The list includes a single-storey building with a roof span over 30 m. It also includes a multi-storey building whose last ceiling is over 32 m above ground.

Can an owner build without hiring a contractor?

Yes, in the cases the act allows. A builder-developer who meets the contractor's test may self-build. The contractor's duties then apply to that builder-developer accordingly (§ 31 ods. 4). See owner-executed construction.

A builder-developer who does not meet the test may build a simple structure (jednoduchá stavba) by self-help. A person authorised for site supervision must lead the work. For notified minor structures, alterations and maintenance, a guide is enough. The guide needs a degree in architecture, construction, mechanical or electrical engineering. Secondary vocational education in those fields and three years of practice also qualify (§ 26 ods. 3).

The self-building owner coordinates the work, signs the contracts with suppliers and answers for all duties under the act (§ 26 ods. 4). The owner also keeps a supervising person for the whole time of the works and follows that person's instructions (§ 30 ods. 6 písm. a). Where a special law requires a qualification, only a person who meets it may do that work (§ 27 ods. 3, from 1 January 2027 § 33 ods. 2).

What changes for the contractor from 1 January 2027?

Zákon č. 243/2026 Z. z. amends the act. Its Art. I applies from 1 January 2027, and the rest applies from 15 November 2026. Two changes touch the contractor.

  • The application for occupancy approval must include a record of handover. The record carries the contractor's declaration that the structure conforms to the verified project (§ 66 ods. 2 písm. d, Art. I point 151). Today the act lists a handover protocol, which the building office may waive in justified cases.
  • The wording of the contractor's liability and product duties changes as described above (§ 32 ods. 1 and 2 písm. g).

If the builder-developer selects the contractor only after the project is verified, the decision on the building intent may set a duty. The duty is to report the contractor's name and the site manager's name within 15 days of the contract (§ 60 ods. 1 písm. h).

Frequently asked questions

Who is a contractor (zhotoviteľ) in Slovakia?
A contractor (zhotoviteľ stavby) is a person authorised to build or demolish structures under contract (§ 31 ods. 1 of zákon č. 25/2025 Z. z.). The contractor arranges the building work through people who hold the authorisation for each kind of work and answers to the builder-developer for the result.
What is the difference between a stavebník and a zhotoviteľ?
The stavebník (builder-developer) intends to carry out the works and owns the land or holds another right to build on it (§ 29 ods. 1). The zhotoviteľ (contractor) is the person who builds the structure (§ 31 ods. 1). One person may hold both roles if that person meets the contractor test (§ 31 ods. 4).
What is a general contractor (generálny zhotoviteľ)?
A general contractor is a contractor that has a contract with the builder-developer for the whole structure (§ 31 ods. 3). Its contract suppliers answer to it for their results. The building office invites it to the occupancy inspection (§ 66 ods. 3).
What qualifications must a contractor have?
A contractor needs the authorisation for site supervision and for management of building work (§ 31 ods. 2). The contractor also needs a master's degree, or a bachelor's degree with three years of practice. Secondary vocational education with five years of practice also qualifies. Engineering structures have a separate test.
Can a homeowner act as their own contractor?
Yes, in the cases the act allows. An owner who meets the contractor test may build alone (§ 31 ods. 4). An owner who does not may build a simple structure by self-help if a person authorised for site supervision leads the work (§ 26 ods. 3).
Who answers for defects in the finished building?
The contractor answers to the builder-developer that the finished structure complies with the technical requirements and the verified project. Fire protection, hygiene and technical regulations also apply (§ 32 ods. 1). The building act does not regulate repair or payment. The contract and civil law do.

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 26, § 31, § 32, § 34
  2. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 29, § 35 až § 37, § 60, § 66
  3. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 91, 92, 151