Builder-developer

A builder-developer is the person who intends to carry out building work and owns the land or holds another right to build on it.

What is a builder-developer (stavebník)?

A builder-developer is the person who intends to carry out building work and owns the land or holds another right to build on it. Zákon č. 25/2025 Z. z. (Stavebný zákon) calls this person the stavebník (§ 29 ods. 1). The role begins on the day the person begins to prepare the documents for the proceedings. It ends on the day the building office issues the occupancy certificate (kolaudačné osvedčenie).

The builder-developer is the owner of the structure or the land, or holds another right to build there. The act lists four such rights. The first is a right to use the land or structure under a contract that gives the right to build or alter. The second is a right from an easement (vecné bremeno) tied to the land or structure. The other two are a right from another legal regulation and a right under a concession contract (§ 29 ods. 1 písm. a to d).

A person who carries out unauthorised building work by self-help also counts as a builder-developer. So does the person for whom a contractor carries out such work (§ 29 ods. 4).

Does the builder-developer have to prove the right to the land?

Yes, with exceptions. The builder-developer does not have to prove a right that is recorded in the real estate cadastre (§ 29 ods. 2 písm. a). Some other cases have the same relief, for example a right under a special law proven by a declaration on honour (§ 29 ods. 2 písm. b).

Some structures allow expropriation of land rights. For these it is enough to prove the rights when the application for project verification is filed (§ 29 ods. 3).

What must the builder-developer do?

The act lists the duties of the builder-developer in § 30. Before and during design, the builder-developer must:

  • give the designer a technical assignment (technické zadanie) that describes the purpose, operation and scope of the structure (ods. 1)
  • ensure the survey work and the opinions of the affected legal entities, unless the parties agree otherwise (ods. 2)
  • ensure a general designer when several designers are needed and the result depends on their cooperation (ods. 2 písm. d)

Before the building work starts, the builder-developer must notify the building office that the permitted works begin, and give the identity of the contractor. The builder-developer must also hand the contractor the verified project, the final decision on the building intent and the land for the site (ods. 3).

During the works the builder-developer must attend the inspections of the structure. On the contractor's call the builder-developer inspects the finished structure and takes it over. The builder-developer must also ensure the designer's supervision of the works and surveying on the structure for the whole time of the works (ods. 4).

For a reserved structure the builder-developer must also ensure, for the whole time of the works, a person authorised for construction supervision. The builder-developer ensures an implementation project, a check of the structural calculations and the designer's continuous supervision (ods. 5).

How does the builder-developer differ from the contractor, designer and site manager?

RoleWhat the act saysWho ensures the role
Builder-developer (stavebník)Intends to carry out the works and holds a right to the land or structure (§ 29)The person themselves
Contractor (zhotoviteľ stavby)Builds or demolishes the structure under contract and answers to the builder-developer for the result (§ 31, § 32)Builder-developer (§ 26 ods. 2)
Designer (projektant)Prepares the project documents and answers for them (§ 35)Builder-developer provides the technical assignment (§ 30 ods. 1)
Construction supervision (stavebný dozor)Follows the works against the verified project and the technical rules (§ 36 ods. 1)Builder-developer (§ 36 title)
Site manager (stavbyvedúci)Organises, directs, coordinates and checks the building work (§ 37 ods. 1)Contractor (§ 32 ods. 2 písm. c)

Can the builder-developer build without a contractor?

Yes, in the cases the act allows. A builder-developer who meets the contractor's test may self-build (§ 31 ods. 4). Otherwise the builder-developer must ensure that an authorised contractor builds (§ 26 ods. 2).

A builder-developer without the contractor's authorisation may build a simple structure (jednoduchá stavba) by self-help. A person authorised for construction supervision must lead the work (§ 26 ods. 3). The self-building builder-developer coordinates the work, signs the contracts with suppliers and answers for all duties under the act (§ 26 ods. 4). See owner-executed construction.

Can one person be builder-developer, contractor and designer?

The act sets a separate test for each role. A builder-developer who meets the contractor's test may act as the contractor (§ 31 ods. 4). A designer must be an authorised person (§ 35 ods. 4). Documents for notified alterations, notified minor structures and simple structures may also come from a person with the education in § 34 ods. 5.

When does the role of the builder-developer end?

The role ends when the building office issues the occupancy certificate (§ 29 ods. 1). The occupancy approval (kolaudácia) begins on the builder-developer's proposal (§ 66 ods. 2). The builder-developer is a party to it. So are the owner of the structure and the owner of the land, if they are other persons (§ 66 ods. 9).

The building office announces the date of the occupancy inspection within seven working days of the complete proposal. The inspection must take place within 30 days of the announcement. The office issues the certificate within 15 days of the inspection when the structure is fit for operation (§ 66 ods. 3 and 7).

After the role ends, the owner of the structure must keep it in good building and technical condition (§ 45 ods. 2 písm. a). That duty belongs to the owner, who may be a different person.

What is new in the 2025 building act?

The building act 25/2025 applies from 1 April 2025 (Art. I). The old building act 50/1976 stayed valid to 31 March 2025. Proceedings filed before 1 April 2025 continue under the old rules (§ 84 ods. 4). Old rules also apply to an application for a building permit (stavebné povolenie) filed later. This holds if the structure already has a territorial decision (§ 84 ods. 5).

The act repealed zákon č. 201/2022 Z. z. o výstavbe, the construction act of 2022 (§ 86). It also renames the procedures. Territorial proceedings (územné konanie) became the building intent proceedings (konanie o stavebnom zámere). Building proceedings (stavebné konanie) became the verification of the project (overenie projektu stavby). Occupancy proceedings (kolaudačné konanie) became kolaudácia (§ 84 ods. 11).

The act sets time limits for the decision of the building office (§ 58 ods. 1 and 2).

CaseTime limit
Decision possible from the application alone, without a hearing or site visit30 days from the complete application
Other cases60 days from the complete application
Reserved structure, linear structure, many parties, or an expert opinion needed90 days

A person may file a procedural step on paper until 31 March 2029. A natural person may do so after that date as well (§ 84 ods. 15).

What changes for the builder-developer from 1 January 2027?

Zákon č. 243/2026 Z. z. amends the act. Its Art. I applies from 1 January 2027. Two changes concern the builder-developer.

  • The notice to the building office that the works begin must go through a designated form (§ 30 ods. 3 písm. a, Art. I point 89).
  • The application for occupancy approval must include a record of handover with the contractor's declaration of conformity (§ 66 ods. 2 písm. d, Art. I point 151).

The decision on the building intent may set a duty to report two names within 15 days of the contract. They are the names of the contractor and the site manager. The duty applies when the builder-developer chooses the contractor after the project is verified (§ 60 ods. 1 písm. h).

Frequently asked questions

Who is a stavebník?
A stavebník is a person who intends to carry out building work (§ 29 ods. 1 of zákon č. 25/2025 Z. z.). The stavebník owns the land or structure, or holds another right to build on it. The role runs from preparing the documents for the proceedings until the occupancy certificate is issued.
Is a stavebník the same as a contractor?
No. The stavebník intends to carry out the works and holds a right to the land. The contractor (zhotoviteľ stavby) builds the structure under contract (§ 29, § 31). One person may hold both roles if that person meets the contractor test (§ 31 ods. 4).
Does a stavebník need a qualification?
The act sets no qualification for the stavebník in § 29. A stavebník who builds without a contractor must meet the contractor test or follow the rules for self-help building (§ 31 ods. 4, § 26 ods. 3).
What are the main duties of a stavebník?
The stavebník gives the designer a technical assignment (§ 30 ods. 1). Before the works start, the stavebník notifies the building office and hands the contractor the verified project (§ 30 ods. 3). The stavebník also attends inspections and ensures the designer's supervision (§ 30 ods. 4).
Does a stavebník have to prove the right to the land?
Yes, unless the right is recorded in the cadastre or another exception applies (§ 29 ods. 1 and 2). For a structure where land rights can be expropriated, proof is due when the application for project verification is filed (§ 29 ods. 3).
When does the role of the stavebník end?
The role ends when the building office issues the occupancy certificate (§ 29 ods. 1). The office issues it within 15 days of the occupancy inspection if the structure is fit for operation (§ 66 ods. 7).

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 26, § 29, § 30, § 31
  2. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, Slov-Lex · § 45, § 58, § 60, § 66, § 84
  3. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 89, 151