Architect's fee

An architect's fee is the payment for design services. Slovak law sets no tariff, so the architect and the client agree it in the contract.

What is an architect's fee in Slovakia?

An architect's fee (honorár) is the payment an architect receives for design services. Slovak law says the service is paid and sets no tariff.

Section 11 (1) of Act 138/1992 says an architect provides services for a fee (odmena, honorár). The architect may work free with the consent of the Slovak Chamber of Architects. The architect may also work free on small works for health care, social care or charity facilities. Section 11 (2) says the architect may ask a reasonable advance on the fee and on material expenses. The act names no rate, no percentage and no minimum.

The Slovak Chamber of Architects (SKA) no longer has a fee schedule. Its page on contract value says that after Slovakia joined the EU, the chamber had to abolish the old Honorárový poriadok. In 2025 SKA published the Štandardy služieb architektov as a method, not as a price list. SKA says the use of the standards is voluntary.

How does an architect calculate a fee?

An architect sets a fee from the scope of work, and SKA names four ways to estimate it.

Way to estimate.Basis.
Time.Estimated hours needed for the work.
Floor area and cost.Calculation from the floor area and the total construction cost.
Comparison.Actual costs of similar projects.
Calculation tools.Tools the profession accepts, such as the archdata.sk calculators and honorar.sk linked by SKA.

The SKA page gives no percentage, no price per m² and no hourly rate. This page gives none either. A figure from a blog, a portal or another firm does not apply to your house. The scope, the site and the number of documents change the work.

The estimate depends on what the architect delivers. A building with a high energy target, such as a passive house, can need more design work. A feasibility study, an architectural study and a full set of permit documents are different amounts of work.

What does the fee cover?

The fee covers the services the contract names, so the contract must list the services and the documents it includes.

SKA divides architect services into basic, further and additional services and arranges them in phases (see design phases). The SKA page does not list what each category contains. The detailed document is a separate download on the chamber website.

The Building Act gives the designer (projektant) these duties in section 35:

  • prepare the stavebný zámer (building intent) as the client requires (§ 35 ods. 6 písm. a).
  • when the client commissions it, prepare the basis for the building intent procedure in the agreed scope (§ 35 ods. 9).
  • when the client commissions it, write the report on the consultation of the building intent (§ 35 ods. 9).
  • when the client commissions it, arrange verification of the projekt stavby (§ 35 ods. 9).
  • take part in an inspection when the client calls the designer because of a design change (§ 35 ods. 7).
  • supervise the works on site for conformity with the projekt stavby, called designer supervision (dohľad projektanta, § 35 ods. 10).

The same paragraph keeps a right of the author of the architectural work. The author may supervise that the works follow the design. The act calls this author supervision (autorský dohľad). The act does not say whether the architect bills these separately or includes them. The contract decides.

Some tasks belong to the client. Under section 30 ods. 2 of the Building Act, the client arranges four things unless client and designer agree otherwise. These are the survey by a surveyor, the geological and other investigations, and the opinions of affected legal persons. When several designers work on the project, the client also arranges the general designer. Check whether your quote includes any of these.

How does the Civil Code treat the price of a design contract?

If the contract is a contract for work (zmluva o dielo), the parties agree the price. The Civil Code also sets rules for advances and budgets.

Situation.Rule.Section.
Parties agree a price.The contractor does the work for the agreed price.§ 631.
No price agreed and none set by a special rule.A reasonable price is due.§ 634 ods. 1.
Payment time, unless agreed otherwise.Payment after the work is finished. The contractor may ask a reasonable advance when the work comes in parts or needs large costs.§ 634 ods. 2.
Price agreed by budget.The price does not rise without the client's consent. Extra work needs written approval or written later order.§ 635 ods. 1.
Price set by estimate.If the contractor finds the estimate will be exceeded by a lot, the contractor must warn the client in writing without delay. Otherwise the contractor has no right to the difference.§ 636 ods. 1.

These sections are in the Civil Code. A household client who orders a design from an architect is usually a consumer, so the Civil Code is the first code to read. If the client is a business, the Commercial Code may apply, and the contract needs a separate check.

What should a fee quote state?

A fee quote should name the documents, phases and services that the price covers. It should also name what the architect bills separately.

Ask the architect to write down these points:

  • the documents delivered, using the names of the Building Act (stavebný zámer, projekt stavby, vykonávací projekt).
  • the phases covered and the payment due at each.
  • whether the price includes designer supervision and author supervision.
  • which surveys and opinions the architect arranges and which you arrange.
  • how the architect prices a change after approval.
  • whether the price is one sum, follows a budget or follows an estimate.

A clear design brief makes a fixed quote possible. Without it, the architect can only estimate. Section 632 of the Civil Code also requires the contractor to give a written confirmation of the order. It states the scope, the price and the time. This does not apply when the contractor does the work on the spot.

For the cost of the building, see construction budget. The architect's fee and the cost of construction are separate amounts.

Frequently asked questions

Is there a legal tariff for architect fees in Slovakia?
No. Act 138/1992 § 11 says architects provide services for a fee and names no tariff. The Slovak Chamber of Architects has no fee schedule either.
What percentage of construction cost does an architect charge?
No official percentage exists. SKA lists calculation from floor area and total construction cost as one way to estimate a fee, and it publishes no rate. Ask for a written quote for your scope.
How is an architect's fee calculated?
The architect estimates it from time, from floor area and construction cost, from similar projects, or with an accepted calculation tool. SKA names these four ways on its contract value page.
Can an architect ask for an advance?
Yes. Section 11 (2) of Act 138/1992 allows a reasonable advance on the fee and on material expenses. Under the Civil Code § 634 ods. 2 the contractor may also ask advances when the work comes in parts.
Can the price rise after I sign?
If the parties agree the price by budget, it does not rise without your consent (Civil Code § 635 ods. 1). If it is an estimate, the architect must warn you in writing when it will be exceeded by a lot (§ 636 ods. 1).
Does the fee include supervision on site?
Only if the contract says so. The Building Act gives the designer the right to supervise the works (§ 35 ods. 10) and keeps the right of author supervision, but it does not say who pays. Name both in the quote.

Sources

  1. Zákon č. 138/1992 Zb. o autorizovaných architektoch a autorizovaných stavebných inžinieroch · Slov-Lex · § 11
  2. Výpočet hodnoty zákazky · Slovenská komora architektov
  3. Štandardy služieb architektov · Slovenská komora architektov
  4. Zákon č. 40/1964 Zb. Občiansky zákonník · Slov-Lex · § 631 až § 636
  5. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex · § 30, § 35