Architectural study
An architectural study is a design stage in which an architect shows a building idea in drawings before the designer prepares the building intent.
What is an architectural study?
An architectural study (Slovak: architektonická štúdia) is a design stage in which an architect draws a building idea before the legal documentation starts. It tests the layout, the volume and the placement on the plot against the design brief. Slovak law lets an authorised architect prepare studies (Act 138/1992, § 4 písm. a).
No Slovak act sets the content of a study. The parties agree the content in the design contract.
Is an architectural study a document named in the Building Act?
No. Act 25/2025 Z. z. lists four levels of project documentation in § 9 ods. 1. They are the building intent (stavebný zámer), the building project (projekt stavby). The others are the building project for notification (projekt stavby na ohlásenie) and the execution project (vykonávací projekt). A study is not one of them. It is a design stage of the practice, not a statutory document.
Decree 60/2025 Z. z. sets the content of documentation in its § 6. It names the building project for notification, the building intent and the report on the discussion of the building intent. It does not name a study. The Slovak Chamber of Architects (SKA) service standards list stages FS 0 to FS 8. They include FS 2 Koncept and FS 3 Návrh. That page does not name an architectural study. Ask the architect which stage your contract covers.
What does an architectural study contain?
The content depends on the contract. A study usually shows the idea in a few drawings and a short text. The usual parts are:
- a site plan with the position of the building on the plot.
- floor plans of each storey.
- one or more sections.
- elevations of the facades.
- one or more visualizations
- a short description of the concept.
A study usually does not hold the technical detail of a building project. Agree in writing what the study delivers and in which file formats.
How does an architectural study differ from the building intent?
The building intent is a document that the Building Act defines. The study is not. The table compares them.
| Point | Architectural study | Building intent (stavebný zámer) |
|---|---|---|
| Named in Act 25/2025 | No | Yes, § 9 ods. 1 and 2 |
| Content set by | The design contract | Annex 15 of Decree 60/2025, per § 6 ods. 2 |
| Use in a proceeding | None by law | Basis for the proceeding on the building intent, § 9 ods. 2 |
| Prepared by | An architect or designer | The designer, on the builder's requirements, § 35 ods. 6 písm. a) |
The act describes the building intent as a text and graphic expression of the urban, architectural and basic building solution. It adds that the building intent is the basis for the proceeding on the building intent. Read more at building intent.
Can I submit an architectural study to the building office?
A study is not the document that the act names as the basis for the proceeding. The basis is the building intent (§ 9 ods. 2). A designer turns the accepted study into a building intent and later into a building project. Older texts and some designers still use terms from the repealed Act 50/1976. See building permit documentation for how these terms map today.
What happens after the architectural study?
After the client accepts the study, the designer prepares the building intent under § 35 ods. 6 písm. a). The designer is also responsible for the building project under the decision on the building intent (§ 35 ods. 6 písm. b). Later documents include the execution project. See design phases for the whole sequence. If you still compare layouts, see the variant study.
Who may prepare an architectural study, and is it an official document?
An authorised architect may prepare studies as part of the services in Act 138/1992 § 4 písm. a). A study is a public document for official purposes only with the author's signature and official stamp. A qualified electronic signature with an electronic authorisation stamp also works (§ 13 ods. 1). A designer must be an authorised person to prepare project documentation (§ 35 ods. 4 of Act 25/2025).
How much does an architectural study cost?
Act 138/1992 § 11 ods. 1 says an architect provides services for a fee. It also allows a reasonable advance for the fee and for material costs (§ 11 ods. 2). The act sets no amount. Agree the fee for the study in the contract. See architect fee.
Does the 2026 amendment change the architectural study?
No. Act 243/2026 changes the wording of § 9 ods. 1 and § 35 of Act 25/2025 but adds no study. The amended § 35 ods. 1 says the designer is a person authorised to prepare project documentation or a part of it. The amendment is in force from 15.11.2026, with Articles I to XIII from 01.01.2027.
Frequently asked questions
- What is an architectural study?
- An architectural study is a design stage in which an architect shows a building idea in drawings before the legal documentation starts. Act 25/2025 does not name it. The design contract sets its content.
- What does an architectural study of a family house contain?
- The content depends on the contract. A study usually holds a site plan, floor plans, sections, elevations, visualizations and a short description. It usually does not hold the technical detail of a building project.
- Is an architectural study a document under the Building Act?
- No. Act 25/2025 lists four levels of project documentation in § 9 ods. 1: building intent, building project, building project for notification and execution project. A study is not one of them.
- What is the difference between an architectural study and a building intent?
- The building intent is a defined document and the basis for the proceeding on the building intent (§ 9 ods. 2 of Act 25/2025). The study is a design stage with no legal use of its own.
- Can I use an architectural study for a building permit?
- The act names the building intent as the basis for the proceeding, not a study. The designer prepares the building intent from the accepted study. Older texts used the terms of the repealed Act 50/1976.
- How much does an architectural study cost?
- Act 138/1992 § 11 says an architect provides services for a fee and sets no amount. Agree the fee in the contract.
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex
- Vyhláška č. 60/2025 Z. z. o informačnom systéme a o obsahu dokumentácie · Slov-Lex · § 6 ods. 1 až 3
- Zákon č. 138/1992 Zb. o autorizovaných architektoch a autorizovaných stavebných inžinieroch · Slov-Lex
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. (Stavebný zákon) · Slov-Lex
- Štandardy služieb architektov · Slovenská komora architektov