Architectural visualization
An architectural visualization is a computer-generated image or film of a planned building that shows how the design will look.
What is an architectural visualization?
An architectural visualization (Slovak: architektonická vizualizácia) is a computer-generated image or film of a planned building that shows how the design will look. The architect builds it from a 3D model and the drawings. It shows light, materials and surroundings, which plans and sections do not show in the same way.
Is a visualization a document named in the Building Act?
No. The main text of Act 25/2025 Z. z. and of Decree 60/2025 Z. z. does not use the word "vizualizácia". Act 25/2025 § 9 ods. 1 lists four levels of project documentation: building intent, building project, building project for notification and execution project. The act describes the building intent and the building project as text and graphic expressions (§ 9 ods. 2 and 3). A visualization does not replace their drawings. The annexes of the decree are PDF files and were not read. The Slovak Chamber of Architects (SKA) service standards do not name visualizations either.
What types of visualization exist?
The types differ in what they show:
- an exterior view shows the facades and the surroundings.
- an interior view shows rooms, finishes and furniture.
- an aerial view shows the building on its plot and in the street.
- an animation or walkthrough moves the viewer through the building or around it
A still image is a render. Choose the type by the question you need answered.
Which visual styles exist?
A visualization can be photorealistic or stylised. A photorealistic image tries to match a photograph. A sketch style or a simple model view shows form and proportion and stays open to change. Use simple styles early in the design, for example in a variant study. Use photorealistic images when the design is final.
How accurate is a visualization?
A visualization shows design intent. It is not a promise of the built result. The author chooses the viewpoint, the time of day, the weather and the planting. Materials age and surroundings change. Ask the architect which data the image uses, for example the model state and the date.
What is the difference between a still render and a walkthrough?
A still render is one chosen view. A walkthrough shows many views in a sequence, so it shows how rooms connect and how big they are. Both come from the same 3D model.
How do AI tools change visualization?
AI tools can create images from a text prompt or from a model view. See text-to-image archviz. An AI image can show details that the model does not hold, for example a window that the drawings do not contain. Check any AI image against the drawings before you use it to decide.
Where does a visualization fit in the design stages?
The architectural study usually includes some views. A client may order more views later. The act does not say when a client needs a visualization. Agree the number, type and format of images in the design contract.
How much does a visualization cost?
The price depends on the scope that you order, for example the number of views, interior or exterior, and the number of change rounds. Act 138/1992 § 11 ods. 1 says an architect provides services for a fee and sets no amount. Ask for a written offer. See architect fee.
Frequently asked questions
- What is an architectural visualization?
- An architectural visualization is a computer-generated image or film of a planned building. The architect builds it from a 3D model and the drawings.
- Is a visualization part of the project documentation?
- No. Act 25/2025 § 9 ods. 1 lists four levels of project documentation and a visualization is not one of them. The building intent and the building project are text and graphic documents.
- What is the difference between a render and a walkthrough?
- A render is one still image. A walkthrough is an animation or interactive tour that moves through the building. Both use the same 3D model.
- How realistic should a visualization be?
- Match the style to the stage. Use sketch styles early and photorealistic images when the design is final. A visualization shows design intent, not a guaranteed result.
- Can AI create architectural visualizations?
- Yes. AI tools can create images from text or from model views. They can show details that the model does not hold, so check the image against the drawings.
- How much does an architectural visualization cost?
- The price depends on the number and type of views and the change rounds. No act sets an amount. Ask the architect for a written offer.
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex
- Vyhláška č. 60/2025 Z. z. o informačnom systéme a o obsahu dokumentácie · Slov-Lex · § 6 ods. 1 až 3
- Zákon č. 138/1992 Zb. o autorizovaných architektoch a autorizovaných stavebných inžinieroch · Slov-Lex
- Štandardy služieb architektov · Slovenská komora architektov