Variant/concept study
A variant study is a design stage in which an architect shows two or more alternative layouts of a building. The client then chooses one.
What is a variant study?
A variant study (Slovak: variantná štúdia) is a design stage in which an architect shows alternative layouts of one building. The client chooses one. It usually comes before or inside the architectural study. Each variant answers the same design brief in a different way.
No Slovak act names a variant study or sets its content. The design contract sets how many variants the architect shows and how detailed they are.
Is a variant study a document named in the Building Act?
No. Act 25/2025 Z. z. lists four levels of project documentation in § 9 ods. 1: the building intent (stavebný zámer), the building project (projekt stavby), the building project for notification and the execution project. A variant study is a design stage of the practice, not a statutory document. The Slovak Chamber of Architects (SKA) service standards list stages FS 0 to FS 8, including FS 2 Koncept and FS 3 Návrh. They do not name a variant study.
Is a variant study the same as variant solutions in public procurement?
No. Act 343/2015 § 47 ods. 1 uses the term "variantné riešenia" for alternative bids that a public contracting authority may allow or require from bidders. A private client who orders a house is not a contracting authority. The variant study in this glossary is a design stage between architect and client.
What can variants differ in?
Variants can differ in any choice that the brief leaves open. Common points are these.
- the position of the building on the plot.
- the volume, for example a compact block or a longer plan.
- the room layout and the links between rooms.
- the roof shape.
- the relation of the house to the garden and to the street.
Rules on the plot limit all variants. See building line and building setback distances.
How do architects present variants?
The presentation depends on the contract. Variants usually come as simple floor plans, a site plan and a sketch of each option. A short text explains each idea. A full visualization is not needed to compare layouts. It can wait until the client picks a direction.
How do I choose between variants?
Compare the variants against the brief and against the plot. Useful questions are:
- Does the variant hold all rooms the brief lists?.
- Does the variant fit the plot and the limits that apply to it?.
- Does the orientation suit the daylight and the garden?.
- Can the client afford the form? Ask the architect for a rough cost comparison of the options and treat it as an estimate.
Ask the architect to explain what each variant gives up. Do not choose by the picture alone.
What happens after I choose a variant?
The architect develops the chosen variant in the architectural study. The designer then prepares the building intent. Act 25/2025 § 35 ods. 6 písm. a) makes the designer responsible for the building intent according to the builder's requirements. Read more at building intent and design phases.
Can I change my mind after I choose a variant?
You can ask, but a change after the choice changes work the architect has already done. Agree in the contract how many rounds of changes the fee includes and how the architect charges more rounds. Small changes inside the chosen variant are usually easier than a switch to another variant.
Does a variant study cost extra?
The act sets no price. Act 138/1992 § 11 ods. 1 says an architect provides services for a fee, and § 11 ods. 2 allows a reasonable advance. State in the contract whether the variant study is a separate item or part of the study fee. See architect fee.
Frequently asked questions
- What is a variant study?
- A variant study is a design stage in which an architect shows two or more alternative layouts of one building. The client chooses one. No Slovak act names it.
- Is a variant study a legal document?
- No. Act 25/2025 lists four levels of project documentation in § 9 ods. 1. A variant study is not one of them.
- What is the difference between a variant study and an architectural study?
- A variant study compares alternatives. The architectural study develops the chosen layout in more detail. Both are design stages of the practice and Act 25/2025 names neither.
- Do I need photorealistic images to compare variants?
- No. Simple plans and sketches are enough to compare layouts. A full visualization can wait until you choose a direction.
- Can I change my mind after choosing a variant?
- You can ask, but the architect has already worked on the chosen variant. Agree in the contract how many rounds of changes the fee includes.
- Is a variant study the same as variantné riešenia in public procurement?
- No. Act 343/2015 § 47 means alternative bids from bidders. A private client is not bound by it.
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Slov-Lex
- Zákon č. 138/1992 Zb. o autorizovaných architektoch a autorizovaných stavebných inžinieroch · Slov-Lex
- Štandardy služieb architektov · Slovenská komora architektov
- Zákon č. 343/2015 Z. z. o verejnom obstarávaní a o zmene a doplnení niektorých zákonov · Slov-Lex · § 47 ods. 1
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. (Stavebný zákon) · Slov-Lex