How much does an architect cost? No law sets the price, so the quote and the contract set it. This text prints no price range and no percentages, because no current official source gives any. It explains only what can be checked: how an architect's fee is agreed. It also covers the phases of the work, the scope, and what you pay separately.
Is there an official price list for architects?
No. Act 138/1992 Zb., § 11 ods. 1, says an architect provides services for a fee (honorár). It sets no rate. The Slovak Chamber of Architects (SKA) has no fee regulation. Its website says it had to abolish its Honorárový poriadok after Slovakia joined the European Union. It points to its own Standards of Services and to independent calculators. It states no rates.
The price is therefore agreed by contract. If an architect commits to deliver a design for an agreed price, the Civil Code treats it as a contract for work (§ 631). If the price is not agreed, a reasonable price is due (§ 634 ods. 1). Agree the price in writing before work starts.
How does an architect calculate a fee?
SKA lists the usual approaches: an estimate of the time needed, a calculation from area and total construction cost, and a comparison with similar commissions. It also links calculators that professionals accept, but it prints no figures from them. These are methods, not a price list. Two quotes for the same house can differ, and the amount alone does not show which one is right.
How the price is calculated is a different question from how it is fixed in the contract. The Civil Code knows a fixed price, a price by budget and a price set by estimate.
| Method | What it rests on or means | Source |
|---|---|---|
| Expected time | An estimate of the time needed | SKA, Výpočet hodnoty zákazky |
| Area and building cost | The area addressed and the total cost of the building | SKA, Výpočet hodnoty zákazky |
| Comparison | Actual costs of similar commissions | SKA, Výpočet hodnoty zákazky |
| Fixed price | A price agreed in the contract | Civil Code § 631 |
| Price by budget | It cannot rise without your consent | Civil Code § 635 ods. 1 |
| Price by estimate | If the estimate is greatly exceeded, the architect must warn you and state a new price | Civil Code § 636 ods. 1 |
With a price by budget, work and costs outside the budget count only if you approved them in writing. The same applies if you ordered the work later in writing (§ 635 ods. 1). With an estimate, you can withdraw from the contract after a new price is announced (§ 636 ods. 2). Before you sign, ask which of the three price types the quote uses.
Which phases does an architect's work have?
SKA divides an architect's services into phases FS 0 to FS 8. Use of these standards is voluntary. They are not a regulation. SKA also separates basic, further and additional services. Its page does not say which phase belongs to which group, so name this in the quote.

| SKA phase | Name |
|---|---|
| FS 0 | Initiation (Iniciovanie) |
| FS 1 | Brief (Zadanie) |
| FS 2 | Concept (Koncept) |
| FS 3 | Design (Návrh) |
| FS 4 | Permitting (Povoľovanie) |
| FS 5 | Construction preparation (Príprava výstavby) |
| FS 6 | Construction (Výstavba) |
| FS 7 | Handover and kolaudácia (Odovzdanie a kolaudácia) |
| FS 8 | Use (Užívanie) |
The Building Act 25/2025 Z. z. uses other terms: the levels of design documentation. They are the building intent, the project of the building, the project for a notification, and the execution project (§ 9 ods. 1). The act describes the building intent as the urban, architectural and basic building solution. It is the basis for the proceedings on the building intent (§ 9 ods. 2). Under § 9 ods. 5 the execution project is the detailed elaboration of the verified project for building works. It is compulsory only for a reserved structure (vyhradená stavba). People often call it an implementation project (realizačný projekt), a name the act does not use. The first step is often an architectural study. The SKA standards do not use that name, so check in the quote what it contains. SKA does not publish a mapping of its phases to the documents in the act, and this text does not make one.
What belongs to the designer's work and what is agreed separately?
Section 35 of the Building Act sets the duties of the designer. It shows what you can expect a quote to cover:
- Design. The designer answers for the building intent, drawn up to the builder's requirements. The designer also answers for the project of the building, drawn up according to the decision on the building intent (§ 35 ods. 6 písm. a and b).
- Coordination. The general designer coordinates the designers of parts and other specialists. The general designer answers to the builder for the completeness of the documentation (§ 35 ods. 3 and 5). Only an authorised person may be general designer (§ 35 ods. 4).
- Hearing and verification. If the builder instructs the designer to arrange the hearing of the building intent, the designer provides the documents for the proceedings. The designer also writes the hearing report and arranges the verification of the project (§ 35 ods. 9). The builder must give this instruction.
- Supervision on site. The designer may supervise the construction, and the architect who authored the work has the right to author's supervision (§ 35 ods. 10). The act gives a right but does not say how supervision is billed.
The contract decides whether a quote includes each of these items and how it is billed. Architects must take out liability insurance within ten days of entry in the list (Act 138/1992 § 12 ods. 2). It also shows you who answers for a mistake.
Is author supervision mandatory, and how does it differ from construction supervision?
The act does not make author supervision a duty for the architect. It gives the architect a right. The author of the architectural work may supervise the construction for conformity of the building work with the author's design (§ 35 ods. 10). The author may enter the site with the knowledge of the site manager (§ 38 ods. 2 písm. d). Whether supervision takes place, and how often, is therefore a term of the contract with the architect.
Author supervision is not the same as two other roles on a building site:
- Designer supervision. It checks that the building work conforms to the project. The client must arrange it during the construction (§ 30 ods. 4 písm. d). The designer is not responsible for changes and deviations from the verified project that the designer did not approve (§ 35 ods. 10).
- Construction supervision (stavebný dozor). A person appointed by the client carries it out. That person follows the progress of the work. The check is for conformity with the verified project and the technical rules. The person also checks the site diary (§ 36 ods. 1 písm. a and h). The client must provide this person for the whole time of the building work for a reserved structure (§ 30 ods. 5 písm. a), and equally when the client builds the work by self-help (svojpomoc). The client must then follow that person's instructions (§ 30 ods. 6 písm. a). The person must meet the authorisation requirements (§ 36 ods. 3).
So author supervision does not replace construction supervision. Each has its own yardstick: the author's design, or the verified project. The act does not say who pays for which service, so name it in the contract.
What do you pay besides the architect's fee?
Unless you agree otherwise with the designer, § 30 ods. 2 of the Building Act makes the builder arrange the inputs for the design. The act names these items:
- Survey inputs. A geodet performs the geodetic and cartographic work and provides the inputs in the needed scope. See geodetic survey.
- Surveys. Engineering-geological, hydrogeological and other survey work and any further inputs the design needs. Depending on the plot, a radon survey may be one of them.
- Statements of affected legal persons. These are the statements of network operators and similar bodies, for example for utility connections (§ 30 ods. 2 písm. e).
- General designer. If the design needs several designers and the result depends on their cooperation, the builder arranges a general designer (§ 30 ods. 2 písm. d).
Administrative fees to the office come on top. The schedule of Act 145/1995 Z. z., item 59 (version from 1 November 2026), sets the fee. The decision on the building intent for a building with one or two dwellings costs 300 euro. Project verification costs 30 % of that rate if it is assessed together with the building intent, and 50 % if it is assessed separately. See the overview of administrative fees. Ask for the split of these costs between you and the architect in the quote.
How is an architect paid?
Act 138/1992 Zb., § 11 ods. 2, allows a reasonable advance on the fee and on material expenses. The Civil Code, § 634 ods. 2, says that unless agreed otherwise the price is due after the work ends. If the work is done in parts or needs considerable costs, the contractor may ask for reasonable advances during the work. Payment by stages therefore has a legal basis. The number of stages and the amounts are agreed in the contract.
If the work is not done on the spot, the contractor must give a written confirmation of the order (§ 632). It must state the subject of the work, its extent, its quality, its price and the time of completion. Ask for this document or for a contract that holds these items.
What should the contract with an architect contain?
The law sets no template for a contract with an architect. The provisions already named in this text give this list of points to agree:
- Scope. Describe the scope by phase and by document.
- A change to the brief. Businesses may agree after the contract to change the work and not set the effect on the price. Then the price rises or falls by the difference in work and in reasonable costs (Commercial Code § 549 ods. 1 and 2). The law does not say how many rounds of changes to a study the price includes, so agree the number.
- Withdrawal and the advance. The client may withdraw from the contract until the work is done. The client then pays for the work already done, if the contractor cannot use its result otherwise. The client also pays the reasonable costs (Civil Code § 642 ods. 1). Agree whether the advance is deducted from the first invoice and what happens to it on withdrawal.
- Supervision and the hearing. State whether the contract covers designer supervision, which the client must arrange by law (§ 30 ods. 4 písm. d), author supervision, which is optional, and the hearing and verification of the project. State how each service is billed.
Which code applies depends on the parties. The Commercial Code governs relations between businesses where they concern their business activity (§ 261 ods. 1). The glossary entry on the contract for work, linked above, explains the differences.
How do you compare quotes from two architects?
Compare the scope, not only the total. A lower price can mean a narrower scope. For each quote, ask about these six items:
- Which phases and documents the quote includes (the levels in § 9, or the SKA phases).
- Who arranges the survey inputs, the surveys and the statements (§ 30 ods. 2).
- Whether coordination of the other designers and specialists is in the price (§ 35 ods. 3).
- Whether the architect arranges the hearing and the verification of the project (§ 35 ods. 9).
- Whether the quote includes supervision on site and how it is billed (§ 35 ods. 10).
- Which price type is used: fixed, by budget or by estimate (§ 631, § 635, § 636).
What else affects the cost of a build, and where do I read about it?
The architect's fee is only one item. Separate texts cover the other topics. This is what each one holds:
- Design Phases and the Payment Schedule. The law sets no fixed payment calendar, so instalments arise only by agreement in the contract.
- House Build Cost per m²: What Sets the Price. The laws cited in the text set no rate in euros per square metre. Ask which area the price was divided by.
- Shell, Holodom or Turnkey: What You Buy. The Building Act does not use these words. A completed building may enter permanent use only after kolaudácia (§ 66 ods. 1).
- Choosing a Builder and Comparing Quotes. A private client need not follow the public procurement act, which sets duties for contracting authorities (§ 7 ods. 1 of act 343/2015).
- Why Builds Overrun and How Much Contingency to Hold. If a deviation from the verified project cannot be allowed at an extraordinary inspection (mimoriadna kontrolná prehliadka, § 43 ods. 2), the building office orders verification of the change to the building project or a new proceeding on the building intent (§ 43 ods. 3).