Radon survey
A radon survey is a soil-gas measurement that sets the radon index of a building plot and so the radon protection of the house.
What is a radon survey?
A radon survey is a soil-gas measurement that sets the radon index of a building plot and so the radon protection of the house.
Radon is the radionuclide Rn-222 and the radionuclides that form when it decays. The radiation protection act defines the radon index of a plot (radónový index pozemku). It is the measure of the risk that radon migrates from the bedrock into the air. The index is low, medium or high.
The firm that determines the radon index needs a registration under the act, because this is a service that matters for radiation protection. Ask for it before you order the survey.
When must a house have a radon measurement?
The act does not say that every plot needs a survey. It puts duties on three people at three moments.
| Who | Duty | Section of 87/2018 |
|---|---|---|
| Designer of a dwelling building or of an alteration | Apply preventive measures so that indoor radon stays at or below 300 Bq/m³ as an annual average | § 130 ods. 1 |
| Owner of that dwelling building | Have indoor radon measured within one year from the start of use. Send a result above 300 Bq/m³ without delay to the radiation protection authority | § 130 ods. 3 and 4 |
| Owner of a school, nursery, social service, health care or commercial building with long stay | Have the radon measured. If the annual average is above 300 Bq/m³ and people stay over 100 hours a year, carry out corrective measures within three years | § 127 ods. 1 and 2 |
The designer duty covers a residential building with a basement or a first above-ground floor meant for long stay. Two buildings are excluded. In the first, a layer of freely flowing air separates the first above-ground floor from the ground. The second is a non-residential building built after 26 June 1992. It has a basement under its whole plan and is sealed against air from that basement.
The owner must measure on the first above-ground floor or in the basement. A building with a freely ventilated air layer under the first floor is excluded. Whoever applies to change a non-residential building into a residential one follows the designer rule.
The building act 25/2025 does not mention radon. The duty comes from the radiation protection act. The authority that receives a high result then recommends what to do next.
Must the designer measure the plot?
The decree on natural sources of radiation names the radon index as the first preventive measure. The designer determines it and uses it in the other measures. The decree adds one condition. The designer may instead design the other measures conservatively for a high radon index. The gas permeability of the soils under the building counts in that design.
The wording leaves a designer two routes. One is a measured radon index. The other is a design that assumes a high index.
What is the radon reference level?
The reference level is 300 Bq/m³ of radon in indoor air, as an average over a calendar year. The act uses it for homes and for workplaces. For workplaces it also gives a second form, 600 000 Bq·h/m³ of worker exposure in a calendar year.
If a building with a basement or a first floor for long stay is above the level, the owner must carry out corrective measures. The annual average must then not exceed 300 Bq/m³.
A soil-gas value in kBq/m³ is not an indoor value in Bq/m³. The first describes the ground. The second describes the air people breathe.
How does a soil-gas radon survey work?
Annex 6 of decree 57/2024 sets the method. These are the main rules.
- The sampler takes soil air from 0.8 m under the original, untreated terrain. After excavation works, the sampler takes it from 0.8 m again.
- The lowest detectable activity of Rn-222 must be below 1 kBq/m³. The decree advises against measuring in extreme weather, because it changes the moisture and permeability of the soils.
- If the building position is known, take at least 15 samples from the planned footprint and its nearest surroundings. Use a grid of 10 m × 10 m or denser. The grid can be 20 m × 20 m for a non-residential footprint above 6 000 m².
- If the position is not known, spread at least 15 samples evenly over the plot. A sufficient density is at least 100 sampling points per 10 000 m².
- The soil-air value is the third quartile of the measured set, without values below 1 kBq/m³. If the plot is not uniform, evaluate each uniform part on its own with at least 15 samples.
- Take the gas permeability of the foundation soils by direct measurement or by expert assessment. Use the highest permeability in the vertical profile down to the foundation trench, without the topsoil.
- If the plot has only hard rock, set the index by an individual procedure. It uses, for example, the activity of Ra-226 and Th-232 in the rock or the radon emission rate.
The expert also considers the engineering-geological survey and the presence of groundwater. For that reason the radon work often runs together with the geotechnical survey.
How is the radon index of a plot set?
The index follows from the soil-air activity and the gas permeability of the soils. Annex 6 of decree 57/2024 gives these limits.
| Gas permeability of the soils | Low index | Medium index | High index |
|---|---|---|---|
| High | below 10 kBq/m³ | 10 to below 30 kBq/m³ | 30 kBq/m³ or more |
| Medium | below 20 kBq/m³ | 20 to below 70 kBq/m³ | 70 kBq/m³ or more |
| Low | below 30 kBq/m³ | 30 to below 100 kBq/m³ | 100 kBq/m³ or more |
The same soil-air value gives a higher index on soil that passes gas easily. A good report states both numbers, not only the index.
What measures follow from the radon index?
Decree 57/2024 lists the preventive measures for a residential building. They are:
- the radon index and its use in the other measures
- a design and execution that stop radon from entering from the bedrock
- venting of soil radon away from the building
- tighter structures in contact with the ground, together with an underpressure under the building
- other building-technical measures
The designer chooses among them. A radon barrier is one way to stop radon entering. It belongs to the foundation slab design.
If the indoor level later exceeds 300 Bq/m³, the corrective measures reduce the radon supply or raise the air exchange. To reduce the supply, tighten the structures in contact with the ground and create an underpressure under the building. Also stop radon from non-living rooms, or remove the source. A new indoor measurement checks the effect. Its method and length must describe the annual average.
Is a radon survey the same as a geotechnical survey?
No. The engineering-geological survey under the geological act 569/2007 studies the engineering-geological and hydrogeological conditions of a site. It serves, among other things, the foundation of buildings. A radon survey measures radon in the soil air. The radiation protection act and decree 57/2024 regulate it.
A site analysis brings both together. For the groundwater side, see the hydrogeological survey.
Where do I learn if my area has elevated radon?
The act gives the national radon action plan two tasks. One is to identify territories with an increased occurrence of radon. The other is to carry out radon surveys in family houses and apartment buildings.
The radon index of one plot comes from the soil-air activity and the gas permeability found on that plot. A workplace in a building on a territory identified as having increased radon can be a radon workplace under the act.
Frequently asked questions
- What is a radon survey and when is it required in Slovakia?
- A radon survey is a soil-gas measurement that sets the radon index of a building plot. The act on radiation protection does not require a survey for every plot. It requires the designer of a dwelling with a basement or a first floor for long stay to apply preventive measures. The owner must measure indoor radon within one year from the start of use.
- Is a radon survey required for a new family house?
- The act requires radon preventive measures from the designer, and a measurement after the house goes into use. A soil-gas survey sets the radon index. The decree wording leaves another route: design the measures conservatively for a high radon index. The building act 25/2025 itself does not mention radon.
- What is the radon reference level in Slovakia?
- The reference level is 300 Bq/m³ of radon in indoor air, as an average over a calendar year (87/2018, § 130 ods. 1). For workplaces the act also gives 600 000 Bq·h/m³ of worker exposure in a calendar year (§ 124 ods. 4).
- What does a radon survey measure and at what depth?
- It measures Rn-222 in soil air taken from 0.8 m under the original terrain, and the gas permeability of the soils. At least 15 samples are taken, on a grid of 10 m × 10 m when the building position is known.
- What is the radon index scale?
- The index is low, medium or high. The limits depend on the gas permeability. On soils with medium permeability the index is low below 20 kBq/m³. It is medium from 20 to below 70 kBq/m³ and high from 70 kBq/m³ (decree 57/2024, annex 6).
- Who may carry out the work, and what if the indoor level is too high?
- A firm that determines the radon index of a plot needs a registration under the act. If an indoor measurement is above 300 Bq/m³, the result goes to the radiation protection authority. The owner must then carry out corrective measures so that the annual average stays at or below 300 Bq/m³.
Sources
- Zákon č. 87/2018 Z. z. o radiačnej ochrane a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 1 písm. bi) a bj), § 124 ods. 1 a 4, § 127, § 130 ods. 1 až 5, § 132, § 135 ods. 1, § 25 ods. 2 písm. d)
- Vyhláška Ministerstva zdravotníctva Slovenskej republiky č. 57/2024 Z. z., ktorou sa ustanovujú podrobnosti o obmedzovaní ožiarenia pracovníkov a obyvateľov z prírodných zdrojov ionizujúceho žiarenia · Ministerstvo zdravotníctva SR, via Slov-Lex · § 5, § 6, príloha č. 6
- Zákon č. 569/2007 Z. z. o geologických prácach (geologický zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 3 písm. g)