Hydrogeological survey

A hydrogeological survey is a geological survey that finds how much groundwater a site holds and how good it is.

What is a hydrogeological survey?

A hydrogeological survey is a geological survey that finds how much groundwater a site holds and how good it is. The geological act 569/2007 (geologický zákon) defines it as a survey of groundwater. It finds and verifies the quantity and quality of the water. It also prepares geological data for its use and protection.

The same definition covers the geological conditions for installations that use geothermal energy. The act splits the survey into three stages.

SurveyStage 1Stage 2Stage 3
HydrogeologicalSearch (vyhľadávací)Detailed (podrobný)Supplementary (doplnkový)
Engineering-geologicalOrientation (orientačný)Detailed (podrobný)Supplementary (doplnkový)

How does a hydrogeological survey differ from an engineering-geological survey?

The two are separate surveys in the act. The engineering-geological survey studies the engineering-geological and hydrogeological conditions of an area. It serves among other things the design and foundation of buildings. It also covers the stability of land prone to sliding.

So groundwater conditions for a foundation slab fall under the engineering-geological survey. See the geotechnical survey. A separate hydrogeological survey answers a different question: how much water the ground holds and of what quality.

The act lists geophysical and geochemical work, laboratory work, field surveying and technical work as geological works when they relate to a survey. Technical work includes drilling and earthworks.

Does a house need a hydrogeological survey?

The building act 25/2025 sets no fixed trigger for a house. It sets two duties on who orders and who designs.

  • The builder arranges the engineering-geological, hydrogeological and other survey work needed for the design (§ 30 ods. 2 písm. b). This holds unless the builder and the designer agree otherwise.
  • The designer is responsible for setting the scope of a hydrogeological survey and other surveys. This applies if the nature of the structure requires them (§ 35 ods. 6 písm. c).

Amendment 243/2026 changes the first duty from 1 January 2027. Its Art. I deletes the word "hydrogeological" from § 30 ods. 2 písm. b. The builder's list then names engineering-geological and other survey work. The designer's duty in § 35 stays as it is.

The designer decides the scope. Tell the designer early if you plan a well, plan to use groundwater heat, or know of a groundwater problem on the plot.

Who may carry out a hydrogeological survey?

Geological works may be carried out by a firm or a sole trader with a geological authorisation (geologické oprávnenie). The State Geological Institute of Dionýz Štúr (ŠGÚDŠ) may also carry them out. Universities and the Slovak Academy of Sciences may do so within their scientific, research or teaching tasks.

The person who finances the work defines the geological task and approves its project. The contractor writes the project of the task. A contract for work replaces the project if the total price does not exceed 995.82 EUR or no working goes deeper than 10 m.

The contractor must notify the ŠGÚDŠ of the works at the latest on the day the task starts. The notification is not needed inside a determined mining area.

What does the final report contain and who approves it?

The contractor evaluates the task in a final report (záverečná správa). The report compares the work done with the project and states the results against the aim. It states the new geological knowledge and the state of boreholes and other workings. If the survey found and verified quantities of groundwater, the report must contain their calculation.

StepWhoDeadline
Approve a standard final reportThe clientWithin three months from taking it over
Approve a report with a calculation of groundwater quantitiesThe Ministry of EnvironmentWithin six months from submission. The client submits it within one month from taking it over
Hand the approved report to the ŠGÚDŠ free of chargeThe clientWithin one month from approval
Keep the written and graphic documentationThe contractorThree years from handing over the report, unless the project sets longer

When the client hands over the report, the client also states the terms for access to it. These terms bind for ten years.

Do a well or a pumping test need a water permit?

Under the water act 364/2004, abstraction of groundwater needs a permit of the water authority. Pumping groundwater and discharging it also needs a permit in two cases. One is a hydrogeological survey with a pumping test that lasts more than five days. The other is the founding of structures.

A hand-pumped house well is a simple facility. A household may draw water from it for personal needs without a permit. The place must be suitable, and the use must not limit other people. Using the thermal potential of groundwater without taking the water also needs a permit.

The water authority issues a permit for abstraction for at most ten years. It is bound by the final report with the calculation of groundwater quantities that the ministry approved. The act drops that approval if abstraction from one point does not exceed 15 000 m³ a year or 1 250 m³ a month. This covers a house well for personal needs and ordinary groundwater abstraction.

A permit that depends on a water structure comes before the decision on the building intent, or together with it in a joint proceeding. This does not apply to an existing or already permitted water structure.

How do the results reach spatial planning?

The act obliges spatial planning authorities and water authorities to act in line with the results of geological works. It names the quantities of water in hydrogeological units, old mine workings, landslide areas and radon risk. The client hands the final report to the ŠGÚDŠ for permanent keeping and further use. See also undermined territory and the radon survey.

Which other terms connect to a hydrogeological survey?

A ground-source heat pump that uses the thermal potential of groundwater needs the permit described above. Discharging surface-runoff water into groundwater needs a permit too (§ 21 ods. 1 písm. d), which matters for rainwater harvesting with infiltration. The site analysis collects these surveys before design starts.

Frequently asked questions

What is a hydrogeological survey?
A hydrogeological survey is a geological survey that studies groundwater and finds and verifies its quantity and quality (geological act 569/2007, § 3 písm. f). It has three stages: search, detailed and supplementary.
Is a hydrogeological survey required to build a house in Slovakia?
The building act 25/2025 names no fixed trigger. The builder arranges the surveys needed for the design unless agreed otherwise (§ 30 ods. 2 písm. b). The designer sets the scope of a hydrogeological survey if the nature of the structure requires it (§ 35 ods. 6 písm. c).
How does a hydrogeological survey differ from a geotechnical survey?
The engineering-geological survey studies engineering-geological and hydrogeological conditions for the design and foundation of buildings. The hydrogeological survey studies the quantity and quality of groundwater. A site often needs both.
Who may carry out the survey?
A firm or sole trader with a geological authorisation, or the ŠGÚDŠ, may carry it out (569/2007, § 4 ods. 1). The contractor notifies the ŠGÚDŠ at the latest on the day the task starts.
Do I need a permit to dig a well or run a pumping test?
Abstraction of groundwater needs a permit of the water authority (364/2004, § 21 ods. 1). A hand-pumped house well for personal needs is a simple facility. Pumping and discharging water in a survey test of more than five days also needs a permit.
What happens to the final report?
The client approves it within three months. The Ministry of Environment approves a report with a calculation of groundwater quantities within six months. The client then hands it to the ŠGÚDŠ within one month (569/2007, § 18 and § 19).

Sources

  1. Zákon č. 569/2007 Z. z. o geologických prácach (geologický zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 3 a 4, § 3 písm. f) a g), § 4 ods. 1, § 11 až 13, § 15 až 16, § 18 až 20
  2. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 30 ods. 2 písm. b), § 35 ods. 6 písm. c)
  3. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (promulgated 7 October 2026) · Národná rada Slovenskej republiky, via Slov-Lex · Čl. I bod 88
  4. Zákon č. 364/2004 Z. z. o vodách a o zmene zákona Slovenskej národnej rady č. 372/1990 Zb. o priestupkoch (vodný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 18 ods. 1 a 3, § 21 ods. 1, 2, 4, 7 a 8