Undermined territory
Undermined territory is land above underground mine workings, where mining can affect the surface and any building on it.
What is undermined territory?
Undermined territory (poddolované územie) is land above underground mine workings, where mining can affect the surface and any building on it. It is a practical term. The mining act 44/1988 (banský zákon) does not use it. The geological act 569/2007 and the radiation protection act 87/2018 do not use it either.
The mining act works with other terms. Each one has a legal effect on a building plot.
| Term in the act | Slovak | What it is | Section of 44/1988 |
|---|---|---|---|
| Protected deposit area | chránené ložiskové územie | Land where unrelated structures could block or hinder mining of a reserved deposit | § 16 |
| Mining area | dobývací priestor | Land set for the mining of a reserved deposit | § 25 and § 26 |
| Old mine working | staré banské dielo | An abandoned underground working with no known operator or legal successor | § 35 ods. 1 |
| Mining damage | banská škoda | Damage to property that mining causes | § 36 |
What is a protected deposit area?
A protected deposit area (chránené ložiskové územie) protects a reserved deposit from being made impossible or harder to mine. It covers land where structures unrelated to mining could block or hinder the mining of the deposit.
It is not the same as undermined land. It protects the deposit, not the building. A plot can lie in a protected deposit area with no mine under it.
- The district mining office (obvodný banský úrad) sets, changes and cancels the area by decision.
- It decides after the nature protection authority gives its opinion, and on the basis of a binding opinion of the building authority.
- The boundaries are marked in the planning documentation and in the cadastre of real estate.
Can I build in a protected deposit area?
You may not set up structures unrelated to mining in the area, unless a binding opinion under the mining act allows it. If the public interest requires a structure there, it must disturb the use of the deposit as little as possible. It allows blocking or hindering the mining of some deposits only in specially justified cases.
In the proceeding on the building intent the district mining office is an affected authority for such a structure. An affected authority issues a binding opinion on the building intent. The building act 25/2025 sets this duty in § 21 ods. 3.
What is a mining area?
A mining area (dobývací priestor) is the land set for the mining of a reserved deposit. The act sets it on the basis of the survey of the deposit, so that the deposit can be mined rationally. It starts from the protected deposit area where one exists.
The boundary on the surface is a closed figure with straight sides. Its corners have coordinates. Under the surface the boundary is usually set by vertical planes through the surface boundary. The planning authority marks the boundary in the planning documentation. The district mining office may order boundary marks on the surface.
Who pays for mining damage to a building?
The act calls damage to property that mining causes "mining damage" (banská škoda). Mining damage includes damage from mining a reserved deposit and from the setting up, securing and closing of mine workings. It also includes loss of groundwater or a fall in its yield or quality.
The organisation whose activity caused the damage is liable. The general rules on compensation apply, unless the mining act says otherwise. The table shows what matters for a new building.
| Situation | Compensation by the mining organisation | Section |
|---|---|---|
| Proven, purposeful costs of preventive measures | Reimbursed | § 37 ods. 3 |
| Measures on a new structure that the decision on the building intent or a special regulation requires | Not counted as preventive measures | § 37 ods. 3 |
| Building in a protected deposit area or mining area, built without a decision on the building intent | None for damage or destruction | § 37 ods. 7 |
| The same building, built without following the decision's conditions on protection against mining effects | None for damage or destruction | § 37 ods. 7 |
So a house in such an area needs a valid decision and must follow its conditions. Without them the organisation pays no compensation.
What if an old mine working turns up on my plot?
An old mine working (staré banské dielo) is an abandoned underground working. Its original operator and legal successor no longer exist or are not known. Whoever finds one, or its effects on the surface, must tell the Ministry of Environment and the Ministry of Economy without delay.
The Ministry of Environment finds old mine workings and keeps their register. It may assign the register to an organisation it runs. The Ministry of Economy secures or closes old mine workings and their consequences if they threaten the public interest, to the necessary extent.
What should I check before I buy or build?
- Ask the municipality for the zoning information. The planning documentation shows the boundaries of protected deposit areas and mining areas.
- Look at the cadastre of real estate. It shows the boundaries of a protected deposit area.
- Arrange an engineering-geological survey for the design. The builder does this unless the builder and the designer agree otherwise (25/2025, § 30 ods. 2 písm. b).
- Check with the district mining office if the plot may lie in a protected deposit area or a mining area.
The engineering-geological survey studies the conditions of the ground for the foundation of buildings, including the stability of land prone to sliding. The geotechnical survey page explains it. The client hands the final report to the State Geological Institute of Dionýz Štúr (ŠGÚDŠ) and states the terms of access to it. Earlier reports for the area may therefore exist there.
How does the state treat land with unfavourable geology?
Spatial planning authorities and water authorities must act in line with the results of geological works. The act names old mine workings, landslide areas and radon risk among them. Take an area with a complex geological structure or unfavourable engineering-geological conditions. For it, the Ministry of Environment states the risks of its use in its opinion on the planning documentation.
A structural engineer designs the foundation for expected ground movement, based on the survey. This page names no settlement figures, because no source supported any. See building settlement and the site analysis. For the groundwater side see the hydrogeological survey.
Frequently asked questions
- What is undermined territory (poddolované územie)?
- It is land above underground mine workings where mining can affect the surface. The mining act 44/1988 does not define it. It works with protected deposit areas, mining areas, old mine workings and mining damage.
- Is a protected deposit area the same as undermined land?
- No. A protected deposit area (chránené ložiskové územie) protects a reserved deposit from being blocked by buildings (44/1988, § 16). A plot can lie in one with no mine under it.
- Can I build a house in a protected deposit area?
- Only with a binding opinion under the mining act, because structures unrelated to mining may not be set up there (§ 18 ods. 1). The district mining office is an affected authority in the proceeding on the building intent (§ 19).
- Who pays if mining damages my house?
- The organisation whose activity caused the damage is liable (§ 36 ods. 3). It pays no compensation for a building in a mining or protected deposit area without a decision on the building intent (§ 37 ods. 7).
- Where do I find out if old mine workings lie under my plot?
- The Ministry of Environment finds old mine workings and keeps their register (§ 35 ods. 2). An engineering-geological survey also studies the ground. Tell both ministries if you find an old working (§ 35 ods. 3).
- Is an engineering-geological survey required for a house on such land?
- The building act states the duty in general terms. The builder arranges the engineering-geological survey for the design unless agreed otherwise with the designer (25/2025, § 30 ods. 2 písm. b).
Sources
- Zákon č. 44/1988 Zb. o ochrane a využití nerastného bohatstva (banský zákon) · Slovenská národná rada, via Slov-Lex · § 16 až 19, § 25, § 26 ods. 1 a 3, § 35, § 36, § 37 ods. 1, 3 a 7
- Zákon č. 569/2007 Z. z. o geologických prácach (geologický zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 3 písm. g), § 19, § 20 ods. 1 a 3
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 21 ods. 1 až 3, § 30 ods. 2 písm. b)