Flood-prone area (inundation area)
A flood-prone area is land that a flood can cover, shown on flood hazard maps, with an inundation area where the law bans most buildings.
What is a flood-prone area?
A flood-prone area is land that a flood can cover. The flood hazard map shows it, and the law bans most buildings in its inundation area.
Slovak speech uses "záplavové územie" loosely. Act 7/2010 Z. z. on flood protection uses more exact terms. A flood (povodeň) is a natural event in which water temporarily covers land that is not usually under water (§ 2 ods. 1). A flood hazard map (mapa povodňového ohrozenia) shows where water can reach. The inundation area (inundačné územie) is the legal zone next to a watercourse, and the building rules apply there (§ 20). The act uses "záplavové územie" itself only for the area with retention potential (§ 21).
What does the flood hazard map show?
The map shows how far water can flood the land in three cases (§ 6 ods. 2 of 7/2010):
- a flood with a low probability, which can return on average once in 1000 years or less often, or an exceptionally dangerous flood,
- a flood with a medium probability, which can return on average once in 100 years,
- floods with a high probability, which can return on average once in 10 years.
The map also shows the flood line, which is where the flood water level meets the terrain, and the depth or level of water. Where needed it shows the flow speed (§ 6 ods. 3). The map is indicative. If a real flood goes beyond the flood line on the map, no claim for compensation arises (§ 6 ods. 4).
The flood risk map (mapa povodňového rizika) uses the same scale and the same flood line. It adds the estimated number of people at risk, the economic activities, and sites that could pollute the water if flooded (§ 7 ods. 1).
What is the inundation area and what is banned there?
The inundation area is land next to a watercourse that a flood usually covers with water that leaves the channel (§ 20 ods. 1). The flood line of a flood with a medium probability, a 100-year flood, sets its outer edge. A line structure that protects against floods of that size can also set the edge.
The district office sets the extent of the inundation area by a regulation (vyhláška) for an unembanked watercourse (§ 20 ods. 2). In the inundation area it is forbidden to place (§ 20 ods. 5):
- residential buildings,
- non-residential buildings, with one exception for short-stay accommodation. That accommodation must not worsen the water outflow, the ice flow or the water quality. It must resist water pressure and keep water out of the interior,
- structures that can worsen the outflow, the ice flow or the water quality,
- structures with harmful substances, petrol stations, settling basins, landfills,
- other structures that a flood could damage or wash away.
Section 20 ods. 6 also bans fences and hedges that worsen the water outflow, and terrain changes that could do the same. The act allows some structures there, such as flood protection measures, water structures and transport structures that do not worsen the outflow (§ 20 ods. 7).
In practice the rule means that you cannot place a house in the inundation area. If your plot touches the edge, ask the water authority and the municipality before you design.
What if there is no map or no inundation area for the watercourse?
Then the act names the documents that the office uses to judge a request to place a structure. Those are the likely course of the flood line of a 100-year flood, or the flood line of the largest known flood (§ 20 ods. 9). A municipality without a spatial plan uses the flood hazard maps in the work of its building office (§ 6 ods. 10).
How do I find out whether my plot is in a flood-prone area?
Follow these steps:
- Ask the municipality. It receives the flood hazard map (§ 6 ods. 9 of 7/2010) and must show all flood lines in its spatial plan when it next reviews the plan (§ 6 ods. 10).
- Read the municipal spatial plan. The plan content covers the protection of the territory against floods (200/2022 § 22 ods. 3 písm. i). See municipal land use plan.
- Check the extent of the inundation area in the regulation of the district office, if there is one for the watercourse.
- Record the result in your site analysis and check buildability of the land before you buy.
The act does not name a website for the maps. This page did not check which portals publish them today, so ask the municipality for the current source.
What does the building act say about flood areas?
Act 25/2025 Z. z. requires a decision on the building intent for a structure unless it says otherwise (§ 18 ods. 2). It also asks for a notification (ohlásenie) to the building office. This applies to small works and alterations in an inundation area with retention potential (§ 18 ods. 3 písm. i). The act gives no other flood rule for a house. The inundation ban comes from the flood act. See decision on the building intent.
What is an area with retention potential?
It is land that the flood protection authority or the municipality can set by a decision as a flood area. The purpose is to flatten the flood wave (§ 21 ods. 1 of 7/2010). The same ban on structures applies there as in an inundation area, under § 20 ods. 5 and 6. If a polder is built there, the operating rules of the water structure set the use of the land.
Does a flood-prone plot need special design?
Suppose the plot is outside the inundation area but on the hazard map. The acts then set no foundation type, floor height or flood insurance rule for a house. Design choices such as an elevated ground floor or water-resistant materials are then a decision for the client and the designer. See flood-resilient design. This page cites no figure for extra cost or insurance because no dated source was found.
Groundwater can also flood land. The act counts a rise of groundwater above the surface as a cause of flood (§ 2 ods. 1 písm. e), and the hazard map for such areas covers only the low probability flood (§ 6 ods. 5). A hydrogeological survey shows the groundwater level on your plot.
Frequently asked questions
- What is a flood-prone area?
- It is land that a flood can cover. The flood act uses the terms flood hazard map, flood line and inundation area (7/2010 § 6 and § 20). Everyday Slovak calls it záplavové územie.
- Can I build a house in an inundation area?
- No. Residential buildings may not be placed in the inundation area (7/2010 § 20 ods. 5 písm. a). The act allows some other structures, such as flood protection measures and water structures (§ 20 ods. 7).
- How is the inundation area set?
- Its outer edge is the flood line of a 100-year flood, or a line structure that protects against such a flood (§ 20 ods. 1). For an unembanked watercourse the district office sets the extent by a regulation (§ 20 ods. 2).
- What does a flood hazard map show?
- It shows how far water can flood the land in a flood that returns once in 10, 100 or 1000 years. It also shows the flood line and often the water depth (7/2010 § 6 ods. 2 and 3). It is indicative.
- Where do I find out if my plot is flood-prone?
- Ask the municipality. It gets the flood hazard map and must show the flood lines in its spatial plan (7/2010 § 6 ods. 9 and 10). Also check the district office regulation for the watercourse.
- Does a flood zone need a special building notification?
- Small works in an inundation area with retention potential need a notification to the building office (25/2025 § 18 ods. 3 písm. i). A structure needs a decision on the building intent (§ 18 ods. 2). The ban on houses comes from the flood act.
Sources
- Zákon č. 7/2010 Z. z. o ochrane pred povodňami · Národná rada Slovenskej republiky, via Slov-Lex · § 2, § 6, § 7, § 20, § 21
- Zákon č. 200/2022 Z. z. o územnom plánovaní · Národná rada Slovenskej republiky, via Slov-Lex · § 5 písm. u), § 22 ods. 3 až 5
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky · § 18 ods. 2 a 3