Which layers make up a pitched roof, from the room to the covering?
A pitched roof over a habitable attic is a stack of layers, and each layer has one main job. Decree 532/2002 Z. z. requires the roof construction to protect the building from the outdoor climate, to collect and drain rainwater and to keep it out of the structure (§ 26 ods. 1). The roof must be designed so that water vapour does not condense in it. If this does not endanger the function and service life of the external wall, the decree also accepts a roof in which vapour condenses (§ 26 ods. 4).
The Slovak standard STN 73 1901 of February 2026 describes the roof layers one by one: the vapour control layer, the thermal insulation, the underlay, the air layer and the lapped covering. This article deals mainly with the part above the rafters: the underlay, the counter battens, the battens and the ventilation. If you are still choosing the structural system of the house, start with the pillar article What to build a house from: masonry, timber frame or CLT.
| Layer (inside to outside) | Job | What to ask |
|---|---|---|
| Vapour barrier or vapour retarder | Limits the passage of water vapour and humid air from the rooms | Is this layer tighter to vapour than the layers on the outside? |
| Thermal insulation | Reduces heat loss, lies between, above or below the rafters | Will an air gap remain between the insulation and the underlay? |
| Roof underlay, on boarding where needed | Protects the insulation from rain and snow that get under the covering | Which tightness class do the pitch and the covering require? |
| Counter battens | Lift the battens off the underlay and form the ventilated gap | Is the gap open at the eaves and at the ridge? |
| Battens | Carry the covering | Does the spacing match the covering manufacturer's data? |
| Covering | Sheds most of the water | What are its safe pitch and its minimum pitch? |
The technical sheet of the Tondach Bolero clay tile shows the same order: tile, battens, counter battens, underlay and boarding, which according to the sheet is used depending on the roof pitch.
Between the rafters or above them: what does it mean for the underlay?
Where the thermal insulation sits decides which underlay can go over it. The choice from the energy point of view is covered in the article on insulating the roof and attic in a renovation. Here the question is what changes in the layers above the rafters.
The membrane maker Dörken describes a common situation in its brochure: with between-rafter insulation, the full depth of the rafters is now used. No air gap is then left between the insulation and the underlay where moisture from the structure could evaporate. For such a build-up the manufacturer gives a rule: the material inside must be less permeable to vapour than the material outside, so the underlay must be diffusion-open.
With above-rafter insulation, insulation boards lie on the rafters or on boarding. The DELTA-MAXX POLAR system consists of polyurethane (PUR/PIR) foam boards that carry a factory-applied diffusion-open underlay with self-adhesive edges on the upper face. According to the manufacturer, the loads from the covering, snow and wind are carried into the roof structure. The rafters can then stay visible from inside.
| Insulation position | Where the underlay lies | What follows |
|---|---|---|
| Between the rafters, full depth | On the rafters, directly over the insulation | No air gap under the underlay, the underlay must be diffusion-open |
| Above the rafters | On the upper face of the insulation boards, part of the board in the POLAR system | Loads from covering, snow and wind go into the rafters, the rafters can stay visible in a new build |
| Between and above the rafters | On the boards above the rafters | The manufacturer gives thermal resistance values for combinations with mineral wool between the rafters |
Diffusion-open or vapour-closed underlay?
Underlays differ in how much water vapour they let through. This is expressed by the Sd value, the equivalent air layer thickness for vapour diffusion. The lower it is, the more easily vapour passes. The declaration of performance of the DELTA-XX PLUS S underlay states Sd = 0.08 m (± 0.02 m) and watertightness class W1. The product is assessed under the European document EAD 030218-01-0402 for underlays laid beneath roof coverings.
At the other end are underlays with a high diffusion resistance. In a 2007 trade article, the manufacturer JUTA wrote that most non-contact, low-diffusion, micro-perforated or anti-condensation films can be used only for the lowest tightness grade. For a higher grade, it said, high-diffusion membranes or contact films on boarding are needed. The article uses an older Czech grading scheme, but the principle holds: not every underlay suits every build-up.
Decree 532/2002 Z. z. requires the roof construction to meet the requirements for water vapour diffusion set by Slovak technical standards (§ 26 ods. 3). The designer therefore checks the underlay by calculating the whole build-up, not by the product name.
When is full boarding needed instead of an underlay draped over the rafters?
The deciding factor is the gap between the roof pitch and the safe pitch of the covering. The technical sheet of the Tondach Bolero tile gives a safe pitch from 30° and a minimum pitch from 18°. Between these values the covering is not enough on its own, and a tighter underlay layer has to go beneath it. The JUTA article put it as a rule: the larger the gap between the intended pitch and the safe pitch, and the more increased requirements the roof has, the tighter the system under the covering must be. According to the article, the highest tightness grade needs boarding.
In Slovakia, since February 2026, this is covered by the new normative Annex K of STN 73 1901. It sorts underlays into tightness classes. Table K.2 assigns the classes to additional measures for concrete and clay lapped coverings. Tables K.7 and K.8 set the thickness of timber boarding and of wood-based composite boards used as the substrate. The actual values are in the full text of the standard, which is sold, so we do not give them here. The standard also deals separately with temporary roofing.
| Method in Annex K | What it lies on | Note |
|---|---|---|
| Underlay loosely draped over the rafters (USB) | On the rafters with no substrate | Requirements in Table K.3, instructions in K.3.5 |
| Underlay on a substrate (UDB) | On a dimensionally stable substrate | Instructions in K.3.4, type UDB-eA for extended use |
| Rain-resistant underroof | On a substrate layer, for example timber boarding | Instructions in K.3.3, boarding thickness in Table K.7 |
| Watertight underroof | On a substrate layer, for example timber boarding | Instructions in K.3.2, boarding thickness in Table K.7 |
How does air flow from the eaves to the ridge?
Counter battens are nailed over the underlay in the direction of the slope and lift the battens and the covering. This creates a channel between the underlay and the covering in which air rises from the eaves to the ridge. It removes the moisture that passes through a diffusion-open underlay and the heat from under the covering.
Air comes in at the eaves, through eaves ventilation. A Wienerberger technician for Tondach tiles states that the required intake cross-section at the eaves is easily reached with counter battens 40 mm deep. We give no numeric cross-section here, because the source prints no clear unit for it. The design sets it from the covering manufacturer's documents. The openings at the eaves must not be blocked by leaves or twigs. The Tondach technical sheet also shows a bird guard strip at the eaves.
Air leaves at the ridge and at the hips. Ridge ventilation uses ventilation tiles or a ventilation strip under the ridge tiles. Wienerberger states that continuous ventilation along the full length of the ridge removes considerably more moisture than point vents. On a complex roof, ventilation elements are needed at every hip as well. A ČVUT lecture on pitched roof details adds that the sealing strip in the ridge must still let the roof ventilate.
STN 73 1901 has an informative Annex D on ventilation with recommended methods. Its design tables separate coverings with a high diffusion resistance from all other coverings.
How are flashings handled at chimneys, valleys and roof windows?
Where a chimney, a window or a valley interrupts the covering, flashing takes over. The ČVUT lecture stresses that the covering and its details form a system. Details of one covering should not be mixed with parts of another. Several correct solutions exist for each roof detail, but the substrate under them must be stable and the parts firmly fixed to it.
- The valley is, according to the lecture, a very sensitive detail that must resist mechanical stress, so it is best made from sheet metal parts.
- A chimney should not be placed in a valley. The lecture deals separately with connecting the underlay at a chimney and at other vertical structures and with draining the underlay.
- A roof window needs, besides its flashing kit, a connection of the vapour barrier on the inside. At the window the membrane is usually cut in an X shape and the joints are taped.
For sheet metal work, STN 73 1901 refers to the standard STN 73 3610. What most often goes wrong on the covering itself at chimneys and valleys is described in the article on choosing a roof covering.
When must a roof have snow guards?
A roof must hold back snow and ice so that they do not endanger pedestrians and road users (§ 26 ods. 1 of Decree 532/2002 Z. z.). A pitched roof with roof planes steeper than 25° must have a guard against sliding snow (§ 26 ods. 6). Snow guards are part of the covering system. For the Tondach Bolero tile, for example, the manufacturer also makes a snow guard tile. The ČVUT lecture shows photographs of correctly sized guards that did not deform under the snow, and of roofs where guards are missing.
What should you check before the roofer covers the underlay?
Where technical specifications or construction product manufacturers' instructions apply to the work or to the way a product is used, Act 25/2025 Z. z. requires the work to follow them (§ 27 ods. 2). Before the covering goes on, it is therefore worth walking the roof with the design documents in hand:
- Ask for the declaration of performance of the underlay and compare its Sd value and watertightness class with the design.
- Check that the tightness class and the substrate under the underlay match the roof pitch and the safe pitch of the covering.
- Make sure the counter battens form a continuous gap and the opening at the eaves is not covered.
- Look at how the underlay is connected at the chimney, windows and penetrations.
- From inside, check that the vapour barrier is taped at joints and penetrations.
Photographs of each layer before it is covered are worth taking. Later they are the only record of what lies under the covering.
