Sd value
An sd value is the thickness of still air that resists water vapour as much as a building layer does, in metres.
What does the sd value measure?
The sd value, also called the equivalent air-layer thickness, tells you how strongly a layer resists the passage of water vapour. It is expressed as the thickness of still air that would resist vapour just as much, and its unit is the metre. A layer with an sd of 2 m stops vapour as well as a 2 m air gap would. The figure describes the layer as built, so the same material gives a larger sd when it is thicker. It builds on the vapour diffusion resistance factor of the material, and it lets you compare layers of different materials and thicknesses.
How is the sd value calculated from μ and thickness?
The sd value is the water vapour diffusion resistance factor μ times the thickness d of the layer in metres: sd = μ · d. The thickness is in metres, so the result is in metres. The SINTEF technical approval TG 20859 for EGGER OSB 3 boards gives this formula. It says the formula applies to board thicknesses other than the 18 mm value it quotes. A second SINTEF approval, TG 2459, for a different OSB 3 product states the same formula, so the rule is not tied to one manufacturer.
The formula has two consequences. A thin board with a high μ can have the same sd as a thick board with a low μ. And doubling the thickness of one material doubles its sd while its μ stays the same. Read μ when you compare materials, and sd when you compare layers.
What sd values do OSB boards show?
The Passivhaus Trust says the airtightness or vapour control layer of a timber frame wall is often an OSB board. OSB 3 figures are therefore a useful reference. The SINTEF approval quotes μ = 200 for dry conditions and μ = 150 for wet conditions, according to EN 13986 in the EGGER approval. For an 18 mm board that gives sd = 3.6 m dry and 2.7 m wet. The table sets these values beside the rule for other thicknesses.
| Quantity | Value or rule | Source |
|---|---|---|
| Water vapour resistance factor μ, OSB 3, dry | 200 (dimensionless) | SINTEF TG 20859 |
| Water vapour resistance factor μ, OSB 3, wet | 150 (dimensionless) | SINTEF TG 20859 |
| sd of 18 mm OSB 3, dry | 3.6 m | SINTEF TG 20859 |
| sd of 18 mm OSB 3, wet | 2.7 m | SINTEF TG 20859 |
| sd of any other thickness | μ multiplied by the thickness in metres | SINTEF TG 20859 and TG 2459 |
Is OSB a vapour retarder, a vapour barrier or an airtight layer?
OSB can serve in more than one role, but none of them comes automatically with the material. EGGER says room-side OSB regularly acts as a vapour barrier. At 18 mm, the board's sd is 3.6 m dry, so it slows vapour without stopping it. A layer that does this is what this site calls a vapour retarder. Airtightness is a separate property. The Passivhaus Trust notes that OSB is not supplied as an airtightness product and that its effectiveness can vary. It recommends at least 18 mm of board with the joints taped. It lists purpose-made reinforced membranes with the appropriate tapes as the safest route.
Why does the more-open-outside rule matter in a wall?
The rule says that each layer should be more open to vapour than the layer inside it. Then moisture in the construction can leave toward the outside. EGGER writes that room-side OSB is enough as a vapour barrier when the outer sheathing is highly vapour permeable. The rule is design advice, not a standard, and a wall that breaks it is not automatically faulty. The Passivhaus Trust describes the outer windtight layer as vapour open. It says modern vapour-open but windtight and water-resistant materials let any moisture in the fabric evaporate harmlessly to the outside. Whether a particular wall works is a question for a calculation. The sd values show the order of the layers, and the calculation shows whether condensation forms.
How is the sd value different from the vapour diffusion resistance factor?
The μ value is a property of the material. It is the same for a given product whatever its thickness. The sd value is a property of the layer as built, because it multiplies μ by thickness. Two boards from the same product therefore share a μ but differ in sd when their thicknesses differ. Compare μ to compare materials, and compare sd to compare the layers of one wall.
Does a low sd value make a layer airtight?
No. Vapour diffusion and air leakage are separate processes. A board can resist vapour moderately and still leak air through its joints, through gaps at windows and penetrations, or at its edges. The Passivhaus Trust treats the two properties separately. It describes an airtight layer taped at the joints and a windtight layer on the outside that is vapour open. EGGER notes that air flowing out through leaks can cause heat loss and possibly condensation. The scope of STN EN ISO 13788 also leaves out air movement through leaks or air gaps. No sd value accounts for that movement.
Where does the service cavity sit relative to the sd layers?
The service cavity sits on the warm side of the airtight layer, between it and the internal lining. Pipes and cables run inside it, so they do not penetrate the airtight layer. The Passivhaus Trust names an internal service void as the ideal, because services then do not penetrate the airtight or vapour barrier. It notes that the void protects a membrane. Without such a cavity, the same guidance says services design and installation need more care.
Where do sd values sit on a real wall section?
Read a wall section from the inside toward the outside. Each layer has a job, and the sd values tell you whether the order makes sense. The table gives a typical order for a timber frame wall with a service cavity and the question to ask about each layer. It is a checklist, not a specification.
| Layer (inside to outside) | Role for vapour | What to check |
|---|---|---|
| Internal lining | Resistance depends on the material | Is it one of the layers the calculation counted? |
| Service cavity | Air gap that protects the airtight layer | Are cables and pipes fully inside it? |
| Airtight layer (OSB or membrane) | Main vapour retarder on the warm side | Is it continuous at joints and penetrations, and is the tape specified? |
| Sheathing board | Should be more open than the airtight layer | What is its sd, and does the calculation use the same thickness? |
| Windtight outer layer | Lets moisture leave the wall | Is it vapour open and windtight at the same time? |
Each row needs the sd of the product actually installed, read from its datasheet. A vapour-open construction is judged by the whole order of its layers.
Frequently asked questions
- What is the sd value in simple terms?
- The sd value is the thickness of still air that resists water vapour as much as a building layer does, measured in metres. A layer with an sd of 2 m resists vapour in the same way as a 2 m air gap. It depends on both the material and the thickness of the layer.
- How do you calculate the sd value?
- Multiply the water vapour diffusion resistance factor μ by the thickness of the layer in metres: sd = μ · d. For an 18 mm OSB 3 board with μ of 200 in dry conditions, the result is 3.6 m. The formula is the one given in the SINTEF approvals for OSB 3 boards.
- Is a higher sd value always better?
- No. As design advice, a higher sd suits the warm side of the wall, where it limits vapour entering the construction. Layers toward the outside should be more open, with a lower sd, so that moisture can dry out. The useful question is whether the layers become more open as you move outward.
- Does the sd value alone show whether a wall will get mouldy?
- No. The sd value is one input to a moisture calculation, which also needs temperatures, humidity and the order of all the layers. A low sd on one layer does not prove that the wall is free of condensation. A high sd does not prove that it fails.
- Where can I find the sd value of a product?
- Look for the technical approval or datasheet from the manufacturer. The SINTEF approvals for OSB 3 state μ for dry and wet conditions, the test standard and the sd of an 18 mm board. Then calculate sd for the thickness that you will install.
- Does the sd value change when a material gets wet?
- It can, because some materials have different μ values in dry and wet conditions. The SINTEF approval for OSB 3 gives μ of 200 dry and 150 wet. That gives 3.6 m and 2.7 m for an 18 mm board. The calculation should use the value that matches the conditions it assumes.
Sources
- SINTEF Technical Approval TG 20859: EGGER OSB 3 floor, roof and wall sheathing · SINTEF Certification · Design considerations and water vapour resistance
- SINTEF Technical Approval TG 2459: Agepan OSB 3 Ecoboard floor and roof sheathing · SINTEF Certification · Design considerations and water vapour resistance
- How to build a Passivhaus, Chapters 1 to 4 (Rules of Thumb: Building Fabric) · Passivhaus Trust · Building fabric: timber frame walls, airtightness and service zone
- Moisture protection, airtightness, windproofness · EGGER, planning and design for timber construction · Moisture protection
- STN EN ISO 13788 Tepelno-vlhkostné vlastnosti stavebných dielcov a konštrukcií (ISO 13788: 2012) · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), catalogue · Predmet normy (scope)