Timber Frame: Vapour-Open or Vapour-Closed

8 min read
An unfinished timber frame wall panel on trestles in a prefab workshop, seen from the inner side: mineral wool between spruce studs and OSB boards with blue-taped joints covering half of the panel, illustration

What do vapour-open and vapour-closed timber frame walls mean?

Both terms describe how the build-up of an external wall deals with water vapour. The board maker EGGER states that the diffusion flow occurs mainly in winter, between the warm indoor air and the cold outdoor air. Vapour therefore travels through the wall from the inside out. A vapour-open build-up lets this vapour pass on, so the wall can dry. A vapour-closed build-up has a layer on the warm side that all but stops the vapour, and it relies on that layer staying intact.

In practice both strategies meet in one rule: the layers should become more vapour-open towards the outside. EGGER writes that OSB on the room side is sufficient as a vapour barrier when the outer sheathing is highly vapour-permeable, for example DHF panels. The UK Passivhaus Trust describes the outer layer of a timber frame wall as windtight but vapour-open, so that moisture in the construction can evaporate harmlessly to the outside. This is a design rule, not a standard. Only a calculation shows whether a particular wall meets it.

This post builds on the overview of systems in the article on what to build a house from. It does not cover fire, acoustics or service life. It deals only with what happens inside the wall.

How do you compare layers with the sd value?

The vapour resistance of a layer is given as its sd value, the equivalent air-layer thickness in metres. It is the vapour diffusion resistance factor of the material, μ, multiplied by the layer thickness in metres, sd = μ · d. The SINTEF technical approval for EGGER OSB 3 boards gives this formula, for example. The higher the sd value, the more the layer holds vapour back. The number alone says little, though. What matters is the order of the values in one wall from the inside out.

The table gives values from documents published by manufacturers and assessment bodies. Where a document gives only μ, we calculated sd with the formula for the thickness shown.

LayerValue in the sourcesd at the thickness shownSource
OSB 3, 18 mmμ = 200 dry, 150 wet3.6 m dry, 2.7 m wetSINTEF TG 20859
fermacell gypsum fibre boardμ = 13about 0.2 m at 15 mm (calculated)ETA-03/0050
fermacell Vapor gypsum fibre boardsd stated directly for thicknesses of 10–30 mm4.5 m dry, 3.1 m wetETA-03/0050
STEICO universal dry wood fibre boardμ = 30.18 m at 60 mm (calculated)STEICO

The table shows why a timber frame wall so often has OSB on the inside and wood fibre board on the outside. The inner layer has an sd of several metres, the outer one a few tenths of a metre. If the same OSB board were also placed on the outside, both faces would have a similar vapour resistance and the rule of being more open outside would no longer hold. Such a build-up is not necessarily wrong, but nothing can be said about it without a calculation.

Is an OSB board a vapour barrier, a vapour retarder or an airtight layer?

It can do several jobs at once, but not automatically. EGGER states that the OSB sheathing on the room side of a timber building regularly takes on the function of both a vapour barrier and an airtight layer. It only slows vapour down, it does not stop it, because even at 18 mm its sd is several metres. A layer that slows vapour without stopping it is called a vapour retarder. The name used on site does not matter. What matters is that the calculation accounts for it.

Airtightness and vapour resistance are two different properties. A board with a suitable sd does not yet make an airtight wall. The Passivhaus Trust warns that OSB is not supplied as an airtightness product and that its effectiveness can vary. It names reinforced purpose-made membranes with the appropriate tapes as the safest route. According to the same guide, OSB with well-taped joints is a common solution that works when it is installed with care.

If a supplier says that "the OSB is the vapour barrier", ask further. You want to know the type and thickness of the board, what the joints and junctions are taped with, and how airtightness will be checked.

Why does airtightness matter more than it seems?

Moisture gets into a wall by two routes: diffusion through the material and air flowing through leaks. EGGER explains that air flowing through leaks leads to heat loss and, in the worst case, to condensation inside the construction. According to the manufacturer, the vapour-retarding property of OSB reduces diffusion so far that no condensation occurs on the outside. A leak has no such protection.

What a calculation leaves out also matters. The scope of STN EN ISO 13788, as given in the ÚNMS catalogue, states explicitly that its method does not take into account the movement of air from the building into the construction through leaks or air gaps. A calculation can therefore come out well for a wall that will in fact leak. That is why board joints are sealed with airtight tape and the result is checked by measuring the whole building. How the measurement works and what follows from it is covered in the article on the blower door test.

What is a service cavity in front of the airtight layer for?

Electricity and water have to run through the wall. Every box, cable or pipe that pierces the airtight layer is a possible leak. A service cavity is a void between the airtight layer and the inner lining. The services run in it and leave the airtight layer intact.

The Passivhaus Trust calls it ideal for two reasons. Services then do not penetrate the airtight and vapour control layer. And if the airtight layer is a membrane, the cavity is beneficial because it protects the membrane from damage. Without a service cavity, the same guide says, more care is needed in the design and installation of services. It also warns that polythene sheeting is vulnerable during construction and during later alterations to the house.

A service cavity makes the wall thicker and adds a work step. If a supplier does not build one, that is no reason to turn them down. Do ask, though, how every penetration will be sealed and who will check it while it is still visible.

Which external sheathing should you choose?

The external sheathing board closes the frame on the outside and protects the insulation from wind. Its vapour resistance decides whether the wall can dry outwards. For vapour-permeable boards EGGER adds that tongue-and-groove joints are enough for windtightness. The table compares three common options based on the documents we opened.

OptionWhat the source statesVapour resistanceWhat to watch
Wood fibre boardSTEICO: sheathing board for timber construction with a rear-ventilated facade, render-coatable version for timber ETICSμ = 3, described by the maker as diffusion-openReaction to fire class E, suitability is assessed in the fire safety part of the design
Gypsum fibre boardETA-03/0050: loadbearing and stiffening board for planking building componentsμ = 13The Vapor version has an sd of 3.1–4.5 m and is not interchangeable with the standard board
OSB with external thermal insulation (ETICS)EGGER: ETICS is one of the ways to protect against precipitationOSB 18 mm: sd 2.7–3.6 mThe outer face is not more open than the inner OSB, the build-up must be calculated

EGGER lists three ways to protect the structure from precipitation and splashing water: a ventilated facade, an external thermal insulation composite system and large roof overhangs. Where render goes on wood fibre board, the wall needs a system the manufacturer names for that purpose, not any combination of adhesive and render.

How is condensation in a build-up assessed?

Decree 364/2012 Z. z. includes, in Annex 1, the assessment of water vapour condensation in building constructions in the scope of the thermal design and assessment of building constructions. The functional requirements for moisture transfer in a construction are in STN 73 0540-2. According to the contents of the standard in the ÚNMS catalogue, its chapter 6 on moisture transfer in constructions has two parts: the amount of water vapour condensed in the construction and the annual balance of condensed and evaporated water vapour. We do not quote the values, because the text of the standard is paid.

The basis is a steady-state diffusion calculation. Fraunhofer IBP calls it the Glaser method, described in the German standard DIN 4108. It points out that the method does not account for capillary moisture transport or the sorption capacity of materials, cannot reproduce short-term events, and does not allow for rain or solar radiation. The scope of STN EN ISO 13788 gives similar limits. Its method may be used only where the effect of these phenomena is negligible.

Where it is not negligible, hygrothermal simulation takes over. STN EN 15026 of November 2023 specifies the components of a numerical model that calculates transient heat and moisture transfer, and a method for validating it. One example of a simulation tool is the WUFI software from Fraunhofer IBP, which works with measured outdoor climate including driving rain and solar radiation. Whether a calculation is enough or a simulation is needed is decided by the designer, depending on whether the build-up involves phenomena the steady-state calculation ignores.

Which defects put a timber frame build-up at risk?

Most problems do not arise in the calculation but on site. The sources we read mainly repeat these:

  • Untaped joints and junctions. EGGER recommends covering board joints and connections to other building components with suitable adhesive tapes. The Passivhaus Trust points out that where plaster meets timber or OSB, cracks form from differential movement and specialist airtightness tapes are needed.
  • Unsealed penetrations. A cable, pipe or box passes through the airtight layer without a grommet or tape. The remedy is a service cavity or sealing every penetration.
  • Damaged sheeting. Polythene sheeting is easily damaged during construction and later alterations, so it needs protection and a check after other trades have worked.
  • A tight outer layer. A board with a high sd on the outside reverses the rule of being more open outside. Such a build-up must be calculated, not guessed.

What should you ask a prefab house supplier?

With a prefabricated panel the build-up is finished before you see it. The questions therefore belong to the choice of supplier, not to the building site. If you are still choosing how to build, see the article on prefabricated or site-built houses.

  1. Which layer is airtight and which one retards vapour? If it is the same OSB, what type and thickness is it?
  2. Which tape seals the joints and the junctions with windows, ceiling and floor, and under which installation instructions?
  3. Does the wall have a service cavity? If not, how will every penetration be sealed?
  4. What is the sd of the external sheathing, and which facade protects it, ventilated or rendered?
  5. Who prepared the assessment of condensation and the annual moisture balance, and was a simulation to STN EN 15026 also needed?
  6. When is airtightness measured, and what happens if the result misses the agreed value?

The difference between a vapour-open and a vapour-closed wall is smaller than the difference between a carefully and a carelessly taped wall. A good build-up on paper only holds when the airtight layer on site is continuous.

Frequently asked questions

Is a vapour-open wall a "breathing" wall that ventilates the house?
No. A vapour-open build-up deals with moisture in the construction, not with air exchange in the rooms. Decree 364/2012 Z. z. assesses the minimum average air change in a room as a separate criterion in Annex 1, apart from water vapour condensation in constructions.
How thick should an OSB board be if it is to act as the airtight layer?
The UK Passivhaus Trust guide (2015) recommends a board at least 18 mm thick with well-taped joints, because OSB is not supplied as an airtightness product. For high demands, such as a passive house, EGGER recommends its OSB 4 TOP board with proven high airtightness.
Why does a data sheet give two μ values, for dry and wet conditions?
The vapour resistance of wood-based boards depends on moisture. For EGGER OSB 3 the SINTEF approval gives μ = 200 dry and 150 wet, which at 18 mm corresponds to an sd of 3.6 m and 2.7 m. The designer decides which value to use in the calculation.
When should the airtightness of a timber frame house be checked?
If possible, while it is still being built. EGGER recommends verifying the airtightness of the building with a blower door test, if possible during the construction process. You then know the result before further layers cover the airtight layer.
Can a timber frame wall dry out if moisture gets in?
To a degree, yes, if the build-up is vapour-open towards the outside. EGGER states that leaks can hardly be avoided completely and that a vapour-permeable timber frame wall allows subsequent drying. This is a reserve for small faults, not a substitute for an airtight layer.
Can a wood fibre board also protect against rain?
Some products can. STEICO lists rain protection among the functions of its universal dry board and approves it for roofs from a pitch of 14°. On a wall it is still protected by the facade, and during construction it gives only temporary weather protection.

Sources

  1. Vyhláška Ministerstva dopravy, výstavby a regionálneho rozvoja Slovenskej republiky č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Ministerstvo dopravy, výstavby a regionálneho rozvoja SR, via Slov-Lex · Príloha č. 1, bod 1 písm. e) body 3 and 6
  2. STN 73 0540-2+Z1+Z2 Tepelná ochrana budov. Tepelnotechnické vlastnosti stavebných konštrukcií a budov. Časť 2: Funkčné požiadavky. Konsolidované znenie · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), catalogue · Catalogue record and table of contents, chapter 6
  3. STN EN ISO 13788 Tepelno-vlhkostné vlastnosti stavebných dielcov a konštrukcií. Vnútorná povrchová teplota na vylúčenie kritickej povrchovej vlhkosti a kondenzácie vnútri konštrukcie. Výpočtové metódy (ISO 13788: 2012) · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), catalogue · Predmet normy (scope)
  4. STN EN 15026 Tepelno-vlhkostné vlastnosti stavebných konštrukcií a ich častí. Posudzovanie šírenia vlhkosti numerickou simuláciou · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), catalogue · Predmet normy (scope)
  5. What is WUFI®? · Fraunhofer Institute for Building Physics IBP · Introduction
  6. Moisture protection (Planning and design for timber construction) · EGGER · Moisture protection, airtightness, windproofness
  7. SINTEF Technical Approval TG 20859: EGGER OSB 3 floor, roof and wall sheathing · SINTEF Certification · Properties, water vapour resistance
  8. European Technical Assessment ETA-03/0050 of 14 October 2025: fermacell gypsum fibre boards · Deutsches Institut für Bautechnik (DIBt) · Section 2 (intended use); Annex A.2.7 (water vapour permeability)
  9. STEICOuniversal dry · STEICO · Product page, applications and technical data
  10. How to Build a Passivhaus: Rules of Thumb · Passivhaus Trust (UK) · Building fabric: timber frame, airtightness

Topic

  • Materials and timber