Prefab House or Built on Site: What Changes

8 min read
A prefabricated timber wall panel with a window opening being lowered by a crane onto a concrete foundation slab, two wall panels already standing at the corner

Prefab or built on site: what are you deciding?

You are deciding where the house is made. Either tradespeople build it on the plot, or a factory makes its parts and a crane assembles them on the plot. The material is a separate question, covered in the article on what to build a house from. The delivery method changes the order of decisions, quality control, the access needed to the plot and the payment calendar. On its own it does not decide how good the house is.

Which delivery methods exist?

There are more than two. At one end is a house built entirely on site, at the other a house delivered almost finished. In between there are several degrees of prefabrication.

  • Masonry built on site. Masonry and cast-in-place concrete for ring beams and floors rise on the plot layer by layer.
  • Timber frame built on site. Carpenters erect a timber frame from sawn timber directly on the slab. The material is wood, but the delivery method is the same as for masonry.
  • Open timber panels. The factory sends a frame sheathed on one side. Insulation, services and the inner lining are added on site.
  • Closed timber panels. The wall arrives insulated and sheathed on both sides, often with windows fitted. SIP panels with a foam core belong here too.
  • Precast concrete. Walls and floors made of precast concrete elements.
  • Volumetric modules. Modular construction delivers whole rooms with finishes and services. The smallest version is the tiny house, delivered as one unit.

Does factory production change the procedure under the Building Act?

No. The act requires a decision on the building intent for every building, change of a completed building and building alteration. It names exceptions (§ 18 ods. 2 of Act No. 25/2025 Coll.). A building may be built only under a project verified in the building-intent procedure or on the basis of a notification (§ 25). These paragraphs speak of the building, not of the technology. Factory production therefore shortens nothing on the side of the office.

  • Decision on the building intent: the office decides within 30 days of the day the application is complete. This holds if no oral hearing or site visit is needed. Otherwise it has 60 days, and 90 days for a reserved structure and some other cases (§ 58 ods. 1 and 2).
  • Project verification: 30 days (§ 65 ods. 2). The verification clause lapses if works do not start within two years of its issue. The office may set a longer period (§ 65 ods. 6). Compare the manufacturer's production date with this period.

This text follows the version of Act No. 25/2025 Coll. in force from 1 November 2025 to 31 December 2026. Amendment No. 243/2026 Coll. changes several of these provisions from 1 January 2027, including § 5 and § 18.

What actually gets faster with a prefab house?

The work on the plot gets faster. More work moves into the factory, so the site has fewer wet trades and less dependence on weather. How much faster depends on the manufacturer and the house. Write the saving into the contract as a date.

These parts do not get shorter:

  • Design. The building project gains production drawings in which every panel and opening is drawn to exact size.
  • Permitting. The office periods are the same as for a house built on site (§ 58, § 65).
  • Waiting for production. Ask about the free production date at the first meeting.
  • Foundations. The foundation slab is cast on site. Under panels it must be flat and dimensionally accurate, otherwise its error carries through the whole building. More in the article on family house foundations.

Why do decisions have to be made earlier, and what if the project changes?

The manufacturer makes the elements from production drawings. Once production starts, a change means reworking a finished element or a compromise on site. Go through the production drawings room by room: where the bed, the kitchen run, the cooker hood and the outdoor socket go. Sign them only when every opening and service route in the walls is certain.

The act treats building works that conflict with the verified project as unpermitted works (§ 28 ods. 1). The designer may approve changes to the project during construction. The fire protection specialist must first agree to the affected part (§ 35 ods. 11). The contractor records agreed changes in the site diary and arranges the as-built documentation for the kolaudácia (§ 32 ods. 3). If the price is agreed by budget, it may not rise without the client's consent. Work outside the budget may be charged only after the client approves it in writing (§ 635 ods. 1 of the Civil Code).

How do you check quality when the wall is closed on delivery?

With a closed panel, the insulation and services inside cannot be seen once it reaches the plot. Move the inspection to the factory. Arrange a visit during production and ask for photo records and panel inspection reports.

The act sets who checks what. The site manager checks that products follow the project. The site manager also records their deliveries to the site (§ 37 ods. 1 and ods. 3 písm. e). Building works are to follow the instructions of the manufacturers of construction products (§ 27 ods. 2). The builder arranges the designer's supervision (§ 30 ods. 4 písm. d). A person appointed as construction supervisor may check whether products are suitable for incorporation (§ 36 ods. 1 písm. c). The act requires a supervisor for a reserved structure and for self-build (§ 30 ods. 5 and 6). For a house built by a firm these paragraphs do not require one.

Which documents should the manufacturer provide for the products?

The house as a whole is a building, not a construction product. Regulation (EU) 2024/3110 defines construction works as buildings and civil engineering works. A construction product is an item placed on the market for permanent incorporation into them (Art. 3). The CE marking therefore goes on the products built into the house, not on the house.

A manufacturer may affix the CE marking only to a product with a declaration of performance and conformity (Art. 17(2), Art. 13). Regulation 2024/3110 replaced Regulation (EU) No 305/2011 from 8 January 2026 (Art. 94). Harmonised standards published under 305/2011 stay valid until the Commission withdraws them (Art. 95(3)). A kit also counts as a construction product. A kit is at least two separate items that one operator places on the market for incorporation together (Art. 3). The list of product families includes "building kits, units and prefabricated elements" (Annex VII). Check with the manufacturer which regime applies to a given panel delivery.

  • The declaration of performance and conformity for the panels, windows and other products it supplies.
  • The installation instructions under which the products are built in.
  • For a product made outside Slovakia, a Slovak translation of the instructions, safety information and declaration (§ 2 ods. 3 of Act No. 133/2013 Coll.).

Can a lorry and a crane reach your plot?

Check this before you choose a system. The office rejects an application if the building has no access from a public road. The access must have enough capacity for its operator and users (§ 59 ods. 1 písm. e). That test is about use of the house, not delivery of panels. Transport of panels and the crane are a separate matter for you.

A vehicle that exceeds the maximum permitted dimensions carries out oversize transport (§ 3 ods. 4 písm. b of the Road Act). Special use of motorways and roads needs a permit from the road authority (§ 8 ods. 1). Agree with the manufacturer who arranges it.

An electric line may run above or beside the plot. A line from 1 kV to 35 kV has a protection zone of 10 m from the outer conductor for bare conductors. For conductors with basic insulation it is 4 m. For lines from 35 kV to 110 kV it is 15 m (§ 43 ods. 2 of Act No. 251/2012 Coll.). Building and working in the zone is allowed only with the consent of the system operator (§ 43 ods. 14). Anyone who works close to the zone and may come near the line must tell the operator in advance. They must follow its conditions (§ 43 ods. 11).

  • a narrow street, a tight bend or a low underpass on the access road,
  • a line above the plot or the street,
  • trees, fences and neighbouring houses within reach of the boom,
  • a slope on which the crane cannot be set up safely.

Obstacles can be solved with a bigger crane, smaller elements or a road closure. The manufacturer should inspect the plot before the contract is signed and state access in writing.

Catalogue house or a custom design made in a factory?

A catalogue house is designed without your plot. It knows nothing of the orientation, slope, entrance or the municipality's conditions. The documentation for the office, however, must come from a designer. The office rejects the application if a designer did not prepare the building intent (§ 59 ods. 1 písm. b, § 57 ods. 2 písm. g). Even for a catalogue house you therefore need a designer to place the house on the plot.

A panel manufacturer can also make a house to an architect's design. Production drawings are the manufacturer's working documents. The office verifies the building project (§ 65), and the designer approves changes during construction (§ 35 ods. 11). When the design is turned into production drawings, ask the designer to check details such as window junctions, plinth height and roof overhang.

How do the bank and the contract treat a prefab house?

The loan contract controls how the loan is drawn. The manufacturer's payment calendar does not have to match it. Before signing with the manufacturer, ask the bank how it will release money for elements made off site. Ask also how much of your own money you need to bridge the gap.

The Civil Code governs a contract for work with a private client (§ 631 ff.). The Commercial Code governs it between businesses (§ 536 ff., § 261 ods. 1). The contract may say otherwise. If not, the contractor may ask a private client for reasonable advances when the work has considerable costs (§ 634 ods. 2 of the Civil Code). Panels may lie on your plot before assembly, so the contract should say who bears the risk of damage. Between businesses, the client bears the risk of damage to a thing made on the client's land. The contract may say otherwise (§ 542 ods. 1 of the Commercial Code). For a private client, the contractor answers for damage to the building until handover (§ 647 of the Civil Code).

Under the Civil Code in force, a structure carries a three-year warranty. It runs from the day the client was due to take over the building (§ 646 ods. 3). The new Civil Code, Act No. 260/2026 Coll., applies from 1 July 2027. It sets five years for building a structure (§ 1256 ods. 3, § 1919).

When is building on site the better choice?

Building on site is the more sensible choice when:

  • a lorry or crane cannot reach the plot, or only at a cost that wipes out the advantage,
  • the brief is still evolving and you know you will be deciding during construction,
  • you want to do part of the work yourself. A simple structure may be self-built if a person entitled to act as construction supervisor leads the work (§ 26 ods. 3). More in the article on building a house yourself,
  • the house has an irregular shape or is set into a slope,
  • you have a proven local builder with a free slot.

A combination is also possible, for example foundations and a basement in cast-in-place concrete with panels above.

The delivery method decides when and where you carry the risk. Prefabrication moves it forward, into design, production and payments. Building on site spreads it across months on the plot. To see what a contractor supplies under a turnkey contract, read about shell, bare house and turnkey. The role of a general contractor has its own entry.

Frequently asked questions

Do I need a construction supervisor if a firm builds the house?
The act requires one for a reserved structure and for self-build (§ 30 ods. 5 and 6 of Act No. 25/2025 Coll.). For a family house built by a firm these paragraphs do not require one. The contractor must ensure that a qualified site manager leads the work (§ 32 ods. 2 písm. c). You may appoint a construction supervisor even without a duty.
What does turnkey mean and who is responsible for what?
The act does not use the term "turnkey". A contractor who has signed a contract with the builder for the whole structure is the general contractor (§ 31 ods. 3). It answers to the builder that the structure conforms to the verified project and the technical requirements (§ 32 ods. 1). The builder duties in § 30 stay with you.
Can I finish the interior myself?
It depends on the contract. If the manufacturer delivers a lower stage of completion, state in the contract how work in the panels affects the warranty. Building works are to follow manufacturers' instructions (§ 27 ods. 2). If you do the work yourself, the builder duties in § 30 ods. 6 apply, including a person entitled to act as construction supervisor.
Can a prefab house be extended or raised later?
Yes. An extension and a raised storey are both changes of a completed building (§ 5 ods. 1). They need a decision on the building intent unless the act says otherwise (§ 18 ods. 2). A structural engineer assesses any intervention in a load-bearing panel, ideally together with the original manufacturer. Keep the production drawings.
Can I switch manufacturer after the project is verified?
Production drawings are the working documents of one manufacturer, and a new manufacturer makes its own. If the change changes the design of the building, it is a change to the project, and the designer approves it (§ 35 ods. 11). If you want to keep the option, have the project prepared so that several manufacturers can price it.
Is a prefab house suitable for permanent living?
Yes, if it meets the same requirements as every building. A building must meet the basic requirements for buildings and the technical requirements for construction for its whole life. Design and construction must ensure this (§ 18 ods. 1). The layout, however, may be limited by the size of elements that can be transported.

Sources

  1. Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 4, § 5, § 18, § 25, § 26 ods. 3, § 27 ods. 2, § 28, § 30, § 31 ods. 3, § 32, § 35 ods. 11, § 36, § 37, § 57 ods. 2, § 58, § 59 ods. 1, § 65
  2. Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (promulgated 7 October 2026) · Národná rada Slovenskej republiky, via Slov-Lex · Čl. I
  3. Zákon č. 40/1964 Zb. Občiansky zákonník · Slov-Lex · § 631, § 634 ods. 2, § 635 ods. 1, § 646 ods. 3, § 647
  4. Zákon č. 513/1991 Zb. Obchodný zákonník · Federálne zhromaždenie Československej federatívnej republiky, via Slov-Lex · § 261 ods. 1, § 536, § 542 ods. 1
  5. Zákon č. 260/2026 Z. z. Občiansky zákonník · Slov-Lex · § 1256 ods. 3, § 1919
  6. Regulation (EU) 2024/3110 of the European Parliament and of the Council laying down harmonised rules for the marketing of construction products (Construction Products Regulation) · European Parliament and Council (EU Publications Office) · Art. 3, Art. 13, Art. 17 ods. 2, Art. 94, Art. 95 ods. 3, Annex VII
  7. Zákon č. 133/2013 Z. z. o stavebných výrobkoch a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 3
  8. Zákon č. 251/2012 Z. z. o energetike a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 43 ods. 2, 11, 14
  9. Zákon č. 135/1961 Zb. o pozemných komunikáciách (cestný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 3 ods. 4 písm. b, § 8 ods. 1