Glaser method

The Glaser method is a steady-state calculation that predicts where water vapour condenses inside a building component.

What is the Glaser method?

The Glaser method is a steady-state calculation of how water vapour diffuses through a building component, and whether that vapour condenses inside it. Fraunhofer IBP, the German building physics institute, calls it the traditional method for assessing the moisture balance of a component. The German standard DIN 4108 describes it. The calculation treats heat and vapour flow in one dimension, through the layers of a wall, roof or floor. It is the classic check for interstitial condensation, meaning water that forms inside a build-up rather than on its surface.

How does the Glaser calculation work?

The input is one set of steady conditions: an indoor and an outdoor temperature and relative humidity. The thermal resistance of each layer sets the temperature at each boundary. The vapour diffusion resistance of each layer, expressed as an sd value, sets how much vapour pressure falls across it. Where the calculated vapour pressure is higher than the saturation pressure at a boundary, the method predicts condensation at that boundary.

The standards and national rules decide when a wall passes the check, so read the current text for the project. The Slovak standard STN 73 0540-2 has a chapter on condensed vapour and an annual balance of condensed and evaporated vapour, described below.

Where does the Glaser method appear in standards?

The method is standardised in EN ISO 13788. The Slovak version, STN EN ISO 13788, is listed as valid in the ÚNMS catalogue with an issue date of 1 July 2013. Its title refers to the internal surface temperature needed to avoid critical surface humidity and interstitial condensation. Its scope covers the risk of condensation from water vapour diffusion. It also covers a second method. That method estimates the time water needs to dry out of a layer between two layers with high diffusion resistance.

The Slovak technical standard STN 73 0540-2 has a chapter on moisture transfer in a construction. Its chapter 6 covers the condensed amount of water vapour and an annual balance of condensed and evaporated vapour. The catalogue record does not name the calculation method, and the text is paid, so this entry does not quote values from it. Check the text before relying on any figure.

Fraunhofer IBP ties the method to the German standard DIN 4108. The three Slovak texts that bear on the check are listed in the table.

StandardStatus in the ÚNMS catalogueWhat it covers
STN EN ISO 13788Valid, issued 1 July 2013Interstitial condensation from water vapour diffusion, and drying time between high-resistance layers
STN 73 0540-2Valid, issued 1 July 2019Chapter 6 on condensed vapour and the annual balance; text paid, not read
STN EN 15026Valid, issued 1 November 2023Model components and validation for numerical hygrothermal simulation

What does the Glaser method leave out?

The method is simple by design, and its simplifications are its main limits. Fraunhofer IBP lists three omissions that matter most in practice:

  • capillary transport of moisture through the material
  • the sorption capacity of the component, meaning how much moisture the materials store in their pores
  • short-term events, rain and solar radiation, which the method cannot reproduce

The ISO 13788 scope adds more omissions. They are air movement through leaks or air gaps, capillary suction, hygroscopic moisture capacity, and the change of material properties with moisture. The standard says its method may be used only where these effects are negligible.

A 2024 paper by Langmans, Houthuys, Parys and Roels, presented at the Facade Tectonics congress, adds a warning about the one-dimensional calculation. Its predictions drift from reality when hygric inertia, air transport or two- and three-dimensional effects play a major role.

How is the Glaser method different from hygrothermal simulation?

A hygrothermal simulation solves heat and moisture flow over time, using a climate that changes from hour to hour. The Glaser method uses one steady state. The table sets out the main differences.

AspectGlaser methodNumerical hygrothermal simulation
Time behaviourOne steady state with simplified boundary conditionsChanges over time with a climate input
Rain and solar radiationCannot be reproducedCan be included, as the WUFI software does with measured outdoor climates
Capillary transport and sorptionNot accounted forMoisture storage and liquid transport functions, as in the WUFI software
Standard basisCalculation in EN ISO 13788Model components and a validation method in STN EN 15026

STN EN 15026 also gives a validation method for a model that claims to follow it. The Glaser method can serve as a first screen. A simulation is the next step when the limits listed above matter for the wall in question.

When should a designer rely on the Glaser result?

This is design advice, not a rule. A Glaser result is a reasonable screen for a wall whose layers are arranged in a predictable order and whose air-tightness is well documented. A simulation is the better tool in four cases. The wall has high hygric inertia. It relies on an airtight layer that is hard to check. It has thermal bridges that create two-dimensional flows. It faces driving rain. Those are exactly the effects the method leaves out.

Passing the check does not prove the wall is durable. The calculation assumes the layers are built as drawn. A tear in the airtight layer or an unsealed service penetration can change how the real wall behaves. So can a wrong assumption about air movement. Ask for the list of layers with their sd values, and ask which air-tightness assumption the calculation used.

Why does the Glaser method matter for timber frame walls?

In a timber frame wall, the order of vapour-open and vapour-closed layers decides which way moisture can leave the structure. A Glaser calculation is one way to test whether that order lets the wall dry outward. A vapour retarder on the warm side slows the vapour, and the sheathing on the cold side must let it out. Both choices change the result, so the calculation has to use the actual layer thicknesses and materials, not a generic wall type.

The method gives a number for each layer boundary, not a verdict on the building. Read the number together with the detailing, the workmanship and the air-tightness test, and treat the Glaser result as one input to the design.

Frequently asked questions

What does the Glaser method calculate?
It calculates how water vapour diffuses through the layers of a wall, roof or floor under one set of steady indoor and outdoor conditions. It shows whether vapour pressure exceeds saturation at any layer boundary, which would mean condensation at that point. It is a screening calculation, not a full model of moisture in the building.
Does the Glaser method include rain?
No. Fraunhofer IBP states that the method cannot reproduce individual short-term events and does not allow for rain or solar radiation. Those effects need a dynamic simulation with a climate input.
Is the Glaser method the same as EN ISO 13788?
The one-dimensional Glaser calculation is standardised in EN ISO 13788, which covers interstitial condensation from vapour diffusion. The Slovak version, STN EN ISO 13788, is listed as valid with an issue date of 1 July 2013. Fraunhofer IBP ties the method to the German standard DIN 4108.
When should I use a hygrothermal simulation instead?
Use a simulation when hygric inertia, air transport, or two- and three-dimensional effects play a major role in the wall. The Facade Tectonics paper of 2024 found that the steady-state method drifts from reality in those cases. STN EN 15026 defines the model components and a validation method for numerical simulation.
Does passing a Glaser check mean the wall is safe?
Not on its own. The method leaves out capillary transport, sorption, and air movement through leaks, so a wall can pass on paper and still perform poorly. The air-tightness and the installation of each layer decide much of the real behaviour.

Sources

  1. What is WUFI®? · Fraunhofer Institute for Building Physics IBP · Introduction to the Glaser method
  2. STN EN ISO 13788 Tepelno-vlhkostné vlastnosti stavebných dielcov a konštrukcií. Vnútorná povrchová teplota na vylúčenie kritickej povrchovej vlhkosti a kondenzácie vnútri konštrukcie. Výpočtové metódy (ISO 13788: 2012) · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), catalogue · Predmet normy (scope)
  3. STN 73 0540-2+Z1+Z2 Tepelná ochrana budov. Tepelnotechnické vlastnosti stavebných konštrukcií a budov. Časť 2: Funkčné požiadavky. Konsolidované znenie · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), catalogue · Catalogue record and table of contents, chapter 6
  4. STN EN 15026 Tepelno-vlhkostné vlastnosti stavebných konštrukcií a ich častí. Posudzovanie šírenia vlhkosti numerickou simuláciou · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), catalogue · Predmet normy (scope)
  5. Interstitial condensation risk assessment: A three-dimensional steady-state tool · Facade Tectonics 2024 World Congress, paper by Langmans, Houthuys, Parys and Roels · Abstract and discussion of limits
  6. Moisture protection, airtightness, windproofness · EGGER, planning and design for timber construction · Moisture protection