Sheathing board
A sheathing board is the outer board of a timber frame wall. It closes the frame, protects the insulation from wind and sets how vapour-open the wall is.
What is a sheathing board in a timber frame wall?
A sheathing board is the outer board of a timber frame wall. It closes the frame from the outside, protects the insulation from wind and carries the outer weather layer. The name does not decide the job: the board's diffusion resistance, its joints and its fixing decide how the wall behaves.
The outer board sits on the cold side of the insulation, so its vapour behaviour matters most in winter. EGGER describes the diffusion flow in our climatic region as mainly happening in the winter period, between warm indoor air and cold outdoor air. Moisture that gets into the wall has to leave it, and the outer layers decide whether it can.
The board works together with the layer on the room side, such as oriented strand board. It also works with the insulation in the frame. Treat it as one part of a wall system, not as a stand-alone product.
Which materials are used as sheathing boards?
The sources opened for this article cover three board families: wood fibre, gypsum fibre and OSB. The table compares what each source states. Where a source gives only the μ value, the sd value shown is calculated for the stated thickness with sd = μ · d.
| Board | What the source states | Diffusion resistance | Point to check |
|---|---|---|---|
| Wood fibre, STEICO universal dry | Wall sheathing for timber construction behind rear-ventilated facades, plaster-coatable for timber ETICS, fire class E to EN 13501-1 | μ = 3, described as diffusion-open, so sd is 0.03 m per 10 mm of board | Fire class E is the datasheet value, the fire design of the wall is a separate check |
| Gypsum fibre, fermacell (standard board) | ETA-03/0050: planking and lining, used both as loadbearing and as stiffening boards | μ = 13, about sd 0.2 m at 15 mm | The ETA gives class A2-s1, d0 for the standard board and assesses no fire performance for fermacell Vapor, which also has a different sd |
| OSB 3, EGGER OSB 3 E0 at 18 mm | SINTEF certificate TG 20859, covering OSB 3 for uses that include roof sheathing | μ = 200 dry and 150 wet, sd 3.6 m dry and 2.7 m wet | SINTEF gives D-s2,d0 for wall board use. EGGER says to cover panel joints with tapes when the board sets the airtight level |
The values in the table are product values, not properties of the whole family. A thicker board has a higher sd, and a different product from the same maker can have a different μ.
How does the outer board's vapour resistance compare with the inner layer?
The rule the sources describe is simple: the layers should become more vapour-open towards the outside. EGGER says that room-side OSB can act as a vapour barrier when the outer cladding is highly vapour-permeable. It names its own DHF vapour-permeable sheathing panel as the example. In the table, the wood fibre board (μ = 3) and the OSB board (μ = 200 dry) sit at opposite ends.
As a design aim, avoid an outer board that is as tight as the inner layer. This is a design rule, not a norm. The Passivhaus Trust describes the same aim: a vapour-open outer layer that lets moisture from the construction evaporate outwards. Whether a particular wall works is shown by a calculation of its layers, which this article does not replace.
Vapour resistance alone does not decide the wall. It grows with thickness, because sd = μ · d, so a thicker OSB is a tighter layer even at the same μ. The aim is what the vapour-open construction page describes, and the inner layer still plays its own role as a vapour retarder.
Why do the joints of the outer board matter?
The outer board has to be windproof, and its joints decide whether it is. EGGER says that with vapour-permeable wood-based cladding, tight boards with a tongue and groove profile are enough to form the windproof layer. This avoids a flow of cold outside air through the insulation.
The Passivhaus Trust describes the windtight layer of a timber frame wall as a board or a membrane that needs taping to eliminate thermal bypass. Its guidance is UK practice and is a rule of thumb here, not a Slovak rule. It also describes modern vapour-open, windtight and water-resistant materials that let moisture in the fabric evaporate to the outside.
Two points follow for the design. A tongue and groove joint is not the same as a taped joint, so ask which one the detail shows. A board that is also the airtight layer is a different case. EGGER recommends airtight tape over the joints. It then recommends a blower door test of the building's airtightness, where possible during construction.
Does the outer board also brace the frame and keep out rain?
Sometimes, and only as far as the approval says. The gypsum fibre ETA allows fermacell boards for planking that is both loadbearing and stiffening. Such a board can take part in the stiffness of the frame. The wood fibre datasheet we opened describes sheathing for timber construction and gives no bracing value, so it is not evidence of bracing. Ask the manufacturer for the approval that covers the exact board and the way it is fixed.
| Job | What the source says | What it means for the choice |
|---|---|---|
| Bracing or stiffening | ETA-03/0050 allows gypsum fibre boards for loadbearing and stiffening planking | Confirm the approval for the exact board and fixing |
| Windproof layer | EGGER: tight tongue and groove joints form it with vapour-permeable wood-based cladding | The joint detail decides, not the board name |
| Rain protection | EGGER: ventilated facades, external thermal insulation composite systems (ETICS) and large roof overhangs | The outer system decides how much the board has to do |
| Render base | STEICO: plaster-coatable wood fibre board for timber ETICS | Use the render system the manufacturer names |
| Temporary weather protection | STEICO: provides temporary weather protection, outdoor exposure 4 weeks | A manufacturer claim, check it on the datasheet |
How do you choose and check a sheathing board?
Start from the wall, not from the board. Decide first whether the outer layer is a rear-ventilated facade, a render system or something else, because the product list follows from that. The approval then tells you what the board may be used for, and Table 1 shows what each source states.
Ask four questions before the order. Which layer sits inside, and what is its sd? What is the sd of the board at the thickness you will install? How are the joints and penetrations sealed? And who checks the wall, with which calculation, and when?
A simple vapour diffusion calculation does not show air leaks. EGGER names convection of warm room air through leaks as the route to heat loss and, in the worst case, to condensation inside the component. The sheathing choice therefore belongs in the airtightness plan, not only in the layer table.
Frequently asked questions
- Can OSB be used as an outer sheathing board?
- The sources here describe OSB on the room side, where it can act as a vapour barrier and airtight layer. They do not give OSB as an outer board in a vapour-open wall. Check its sd against the layers outside it before choosing it.
- Can a wood fibre sheathing board take render?
- The STEICO datasheet describes its universal dry board as plaster-coatable and suitable for timber ETICS. Use the render system the manufacturer names for that board, and check the fire class separately.
- What is the sd value of an 18 mm OSB board?
- The SINTEF certificate for EGGER OSB 3 E0 gives μ = 200 dry and 150 wet. For 18 mm that is sd = 3.6 m dry and 2.7 m wet. The figure belongs to that product and thickness, not to OSB in general.
- Do gypsum fibre boards brace a timber frame?
- The fermacell ETA allows the boards for planking that is both loadbearing and stiffening. Whether a specific wall gets that role depends on the approval, the fixing and the design, not on the board alone.
- What is the difference between sheathing and insulation?
- Sheathing closes the frame from the outside and carries the outer weather layer. Insulation sits within the frame and reduces heat loss. The sheathing's diffusion resistance affects how the wall dries outwards.
Sources
- Moisture protection, airtightness, windproofness (planning and design for timber construction) · EGGER · Vapour-permeable timber frame construction; Diffusion; Windproofness; Airtightness
- STEICOuniversal dry, combined sarking, sheathing and render board (product page) · STEICO · Product description, application area, technical data
- European Technical Assessment ETA-03/0050, fermacell gypsum fibre boards · Deutsches Institut fur Bautechnik (DIBt) · Section 2 (intended use); Annex A.2.7 (water vapour permeability)
- Technical document TG 20859, EGGER OSB 3 E0 (SINTEF Certification) · SINTEF Certification · Properties, water vapour resistance
- How to Build a Passivhaus, chapters 1 to 4 (rules of thumb) · Passivhaus Trust (UK) · Building fabric: timber frame; airtightness