Ridge ventilation

Ridge ventilation is an air outlet along the roof ridge that lets air rising through the batten space leave the roof.

What is ridge ventilation?

Ridge ventilation is the air outlet at the top of a pitched roof. It sits along the hrebeň (ridge) and lets air leave the space under the covering. The Slovak term is vetranie hrebeňa. It is the outlet half of a ventilated roof. Air enters at the eaves and leaves at the ridge, as the ventilated roof cavity article describes.

The Tondach drawing for its Bolero tile shows this path. It labels the ventilation air supply under the covering at the eaves and the ventilation of the roof space at the ridge. The Wienerberger article says nothing may block the air flow.

How does air travel from the eaves to the ridge?

Counter battens lie on the roof underlay. In the Tondach build-up they sit between the underlay and the battens. A Wienerberger technician says that 40 mm counter battens give the intake opening at the eaves. The air gap runs under the covering, from the eaves to the ridge.

The Wienerberger article names damp and overheated attic rooms as the problem that ventilation prevents. It says the gap under the covering carries the air. The ridge is the end of that path. A closed ridge leaves the air no exit.

Which types of ridge outlet are used?

The Wienerberger article, written by a tile maker, names two approaches. Point ventilation uses ventilation tiles at set places. Line ventilation uses a ventilation cross-section along the whole length of the ridge. The table compares them using only what that article says.

TypeWhat the article says
Point ventilation (ventilation tiles)The number of tiles depends on the covering, the roof area and the rafter length. The tile maker calculates it for each roof
Line ventilationThe ventilation cross-section runs along the whole ridge and removes considerably more moisture than point ventilation. It needs no extra accessories

The article comes from the maker of the tiles, so its ranking describes what the company sells. Treat the ranking as a claim to check against the covering maker's documentation. It is not a general rule.

Why must the air path stay open along the ridge and the hips?

The Wienerberger article says no obstacle may block the air flow. On a complex roof, it says you must fit ventilation tiles along the ridge and also on every hip (nárožie). A single outlet at the ridge may not serve every part of such a roof.

The ridge detail must also work with the ridge seal. The lecture Šikmé strechy, konštrukčné riešenie detailov at CVUT Prague shows a ridge solution with a sealing strip. The lecture says this strip still allows the pitched roof plane to ventilate at the ridge. Check that your ridge detail keeps that property.

How is ridge ventilation different from eaves ventilation?

The two openings work as a pair. The eaves let air in, and the ridge lets it out. Neither works alone.

FeatureEaves ventilationRidge ventilation
JobAir intake under the coveringAir outlet at the top of the slope
Blockage the source namesLeaves and twigs clog the intake openingsObstacles that block the air flow
Protection or detailA bird guard strip, as the Tondach sheet showsA ridge seal that still lets the roof ventilate, as the CVUT lecture shows

Does a roof window replace ridge ventilation?

No. The Wienerberger article opens with the point that roof ventilation does not mean only opening the roof windows. The batten space still needs its own continuous path from the eaves to the ridge.

What size should the ridge opening be?

The sources give a product figure, not a general rule. The Tondach Bolero sheet lists a ventilation cross-section of about 42 cm2 for its ventilation tile. That number belongs to one product. Do not copy it to another covering.

The Wienerberger article gives an intake figure for the eaves, but its unit is unclear, so this article does not quote it. The designer takes the opening size from the covering maker's data and the real roof geometry. A brochure figure is a starting point for the question. It is not the answer for your roof.

What should you check at the ridge before the covering goes on?

These checks are advice from practice, not legal rules. The designer and the roofer should agree on them in advance.

  • Check that the counter battens leave a continuous gap from the eaves to the ridge.
  • Check that insulation, the underlay or a sealing strip does not block the path under the ridge.
  • Compare the type and the number of ridge ventilation tiles with the covering maker's data for this roof.
  • On a complex roof, check that the plan also has ventilation tiles at each hip.
  • Take photographs of the ridge before the covering hides it.

Where can I read more about the layers of the roof?

Ridge ventilation is one part of the pitched roof build-up. The roof pitch article explains the pitch that the covering needs. The cold roof article explains the ventilated layer above the insulation.

Frequently asked questions

Is ridge ventilation a legal requirement in Slovakia?
This article does not quote a legal rule for ridge ventilation. The sources describe it as a construction detail. The designer checks the roof against the current standards and the covering maker's data.
Does a roof window replace ridge ventilation?
No. The Wienerberger article says roof ventilation does not mean only opening the roof windows. The air gap under the covering needs its own path from the eaves to the ridge.
What is the Slovak term for ridge ventilation?
The Slovak term is vetranie hrebeňa. The Tondach sheet calls the tile that lets air out a vetracia škridla, which means ventilation tile.
Is line ventilation better than point ventilation?
The Wienerberger article says a continuous line removes considerably more moisture than separate point vents. That is the manufacturer's claim, so check it against the covering data for your own roof.
How many ridge ventilation tiles does a roof need?
It depends on the covering, the roof area and the rafter length. The Wienerberger article advises asking the tile maker to calculate the number for the roof.
Can the ridge seal block the ventilation?
It must not. The CVUT lecture shows a ridge solution with a sealing strip that still lets the pitched roof plane ventilate at the ridge.

Sources

  1. Odvětrávání střechy prodlouží její životnost a zajistí příjemné bydlení i v podkroví · ESTAV.cz (company article, Wienerberger s.r.o., 17 July 2023) · Introduction and quotes of R. Prus and R. Krestýn
  2. Bolero posuvná škridla: Riešenie pre strechu (technický list) · Wienerberger s.r.o. (Tondach), hosted by Stavbaren · Pages 14 and 15, build-up drawing and technical data
  3. Šikmé strechy (konštrukčné riešenie detailov), PSIV 2021 · CVUT Praha, Fakulta architektury (lecture by Marek Novotný) · Slide 21, Řešení hřebenu