Eaves ventilation
An eaves ventilation opening is an air intake at the lower edge of a pitched roof that feeds air into the ventilated roof cavity.
What is eaves ventilation?
Eaves ventilation is the air intake at the lower edge of a pitched roof. The Slovak term is vetranie odkvapu. Outside air enters the gap under the covering at the eaves and rises through the ventilated roof cavity towards the ridge. Without an intake at the bottom, the gap has no fresh air.
The intake is half of the system. The outlet sits at the top, in the ridge ventilation. Counter battens above the roof underlay sit in the build-up between the two. Plan the eaves and the ridge together.
How does air get into the roof at the eaves?
The Tondach drawing for its Bolero tile labels a ventilation air supply under the covering at the eaves. The air enters there and moves into the gap under the covering.
A Wienerberger technician writing for the ESTAV portal says that 40 mm counter battens give the intake opening at the eaves. The same article says the openings that draw in air must not be clogged by leaves, twigs and other debris. A blocked eave can therefore cut the air supply even when the design is right.
What does the eave detail look like in a tile roof?
The Tondach sheet for the Bolero tile shows the eave as a set of parts. Its drawing labels these parts at the lower edge. They are the ventilation air supply under the covering, a bird guard strip (ochranný pás proti vtákom), a gutter sheet (odkvapový plech) and flashing. The same sheet lists the build-up above the rafters. It has the covering on battens, the counter battens, the Tondach Fol underlay and boarding. The sheet marks the boarding as depending on the roof pitch.
The sheet also states a ventilation cross-section of about 42 cm2 for the Bolero ventilation tile. That figure belongs to a ventilation tile, not to the eaves intake. Do not read it as a required eave opening.
| Eave element | What the source shows | What to check on site |
|---|---|---|
| Counter battens | 40 mm height gives the intake opening on the ESTAV example | Is the gap continuous along the whole eave? |
| Bird guard strip | Tondach shows it at the eave of its tile system | Does it let air through? |
| Gutter sheet | Tondach shows it at the lower edge | Does it leave the intake open? |
How is eaves ventilation different from ridge ventilation?
Eaves ventilation brings air in, and ridge ventilation lets it out. A blocked eave starves the cavity of air even when the ridge is open. An open eave does not help if the ridge has no outlet.
| Feature | Eaves ventilation | Ridge ventilation |
|---|---|---|
| Position | Lower edge, where air enters | Top of the roof, where air leaves |
| Function | Brings fresh air into the cavity | Lets air out of the cavity |
| Fault the source names | Intake openings clogged by leaves and twigs | Obstacles that block the air flow |
| Forms the source names | Intake opening from 40 mm counter battens, with a bird guard strip | Ventilation tiles, or a continuous line outlet along the ridge |
The ESTAV article says a ventilation cross-section along the whole length of the ridge removes considerably more moisture than point ventilation. It is a tile maker's text, so treat the comparison as a claim. It also says the number of ridge and hip ventilation tiles depends on the covering, the roof area and the rafter length.
Why does air need an outlet as well as an intake?
Air moves through the gap only when it has both an entry and an exit. The ESTAV article treats the intake at the eaves and the ventilation tiles at the ridge and hips as one system. An intake without an outlet gives no steady flow.
The free preview of STN 73 1901:2026, the Slovak standard on roof design, lists section 5.22 on the air layer and ventilation channels. It also lists an informative Annex D on recommended ways of ventilating roofs. Annex D has two tables. Table D.1 covers coverings with a high diffusion resistance. Table D.2 covers coverings that do not have one. The preview does not show the table values, so this article does not quote them.
What mistakes are common with eaves ventilation?
The ESTAV article names one mistake directly. It is letting leaves and twigs clog the intake openings. The points below are advice from practice, not legal rules.
- Do not close the eave with a board, a trim or insulation, because that removes the intake.
- Choose a bird guard that lets air through.
- Fix the counter battens so that the gap stays open along the whole eave.
- Plan the ridge outlet together with the eaves intake.
Check the eave before the first course of covering goes on. After that, the covering hides the gap.
How do you check eaves ventilation before the roof is covered?
Ask for the eave detail to be shown before the covering is laid. The counter battens should be continuous. The bird guard should be in place. The gutter sheet should not reach into the gap. After you fix the first course, look at the eave from below and check that air can pass through the opening.
A short check at this stage gives the roofer and the client one shared point to discuss before the covering hides it.
Frequently asked questions
- What is eaves ventilation?
- Eaves ventilation is the air intake at the lower edge of a pitched roof. It brings outside air into the ventilated roof cavity, where the air can flow up to the ridge.
- Is eaves ventilation a legal requirement in Slovakia?
- This article does not quote a legal rule for eaves ventilation. Check the current technical requirements and the maker's instructions for your covering before you finalise the eave detail.
- How large should the eaves opening be?
- This article does not give a size. A Wienerberger technician says 40 mm counter battens give the intake opening on one tile system. The right size depends on the covering and the maker.
- Should a bird guard be fitted at the eaves?
- The Tondach sheet shows a bird guard strip at the eave of its tile system. Check that the guard does not block the intake.
- Why does a ridge outlet matter if the eaves are open?
- An open eave only brings air in. The air needs an exit at the ridge, and on a complex roof at the hips, as the Wienerberger article says.
- What happens if the eaves are blocked?
- The Wienerberger article says intake openings must not be clogged by leaves and twigs. It warns that ignoring its recommendations shortens the life and the function of the roof. Clear the gutter and the eave at each maintenance visit.
Sources
- Bolero posuvná škridla: Riešenie pre strechu (technický list) · Wienerberger s.r.o. (Tondach), hosted by Stavbaren · Pages 14 and 15 (build-up drawing and technical data)
- Odvětrávání střechy prodlouží její životnost a zajistí příjemné bydlení i v podkroví · ESTAV.cz (company article, Wienerberger s.r.o., 17 July 2023) · Quotes of R. Prus and R. Krestýn
- STN 73 1901: 2026 Navrhovanie striech. Základné ustanovenia (náhľad) · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS SR) · Obsah: 5.22 Vzduchová vrstva a vetracie kanáliky; Príloha D (informatívna), Tabuľka D.1 and D.2