Roof boarding
Roof boarding is a solid layer of timber or wood-based boards fixed to the rafters, with the roof underlay laid on top of it.
What is roof boarding and where does it sit?
Roof boarding (plné debnenie strechy) is a continuous layer of timber boards or wood-based panels fixed across the rafters. It lies below the roof underlay membrane, so the underlay rests on a solid surface. Without boarding, the membrane spans freely from rafter to rafter.
The Tondach technical sheet for the Bolero tile lists the layers from the top. They are the tile, the roof battens, the counter battens, the underlay and the boarding. The sheet marks the boarding as depending on the roof pitch.
The Slovak standard STN 73 1901:2026 deals with boarding in its normative Annex K. The annex covers underlays, which the standard calls poistné hydroizolácie. It has a section on substrate layers and two tables on the thickness of boarding. The free preview does not show the table values. Read the tables in the full standard before you order timber or panels.
How does the Slovak standard treat boarding under the underlay?
The free preview of STN 73 1901:2026 lists the clauses of Annex K. They name four ways to lay an underlay or build an underroof. A fifth clause, K.3.1, covers temporary roofing.
| Method in Annex K | Clause | What the heading says |
|---|---|---|
| Underlay on a substrate (UDB) | K.3.4 | Underlay lies on a substrate |
| Underlay freely stretched over the rafters (USB) | K.3.5 | Underlay lies freely on the rafters |
| Watertight underroof | K.3.2 | Substrate layers have Tables K.7 and K.8 for boarding thickness |
| Rain-resistant underroof | K.3.3 | Substrate layers have Tables K.7 and K.8 for boarding thickness |
The preview gives only headings. Clause K.2.6 has the title Podkladové vrstvy (substrate layers). Table K.7 has the title Hrúbka dreveného debnenia ako podkladovej vrstvy pre podstrešia (thickness of timber boarding as a substrate layer for underroofs). Table K.8 has the same kind of title for boards of composite wood material.
When does a roof need boarding under the covering?
The safe pitch (bezpečný sklon) of a covering is the lowest pitch at which that covering works reliably. The Tondach sheet gives 30 degrees as the safe pitch of the Bolero tile and 18 degrees as its minimum pitch.
Jan Rypl, an applications manager at the membrane maker JUTA, wrote an article on this in 2007 for TZB-info. It is a company article, and it uses Czech tightness grades. Its main points are these. The table lists what it says for each grade.
| Grade in the article | What the article says |
|---|---|
| 2a | Use contact films on a boarded three-layer roof, or a high-diffusion membrane |
| 2c | As for 2a, and bond the materials to each other or seal under the counter battens |
| 3A | The underlay lies on boarding, with a special high-watertight, high-diffusion membrane. The boarding must not be low-diffusion |
- If you use a covering below its safe pitch, the underlay must be tighter. The bigger the gap, the tighter the system.
- Most underlays suit pitches down to 17 degrees. Some suit 15 degrees and a few suit 12 degrees. Most cannot serve grade 3A.
Annex K of the 2026 Slovak standard has its own tightness classes in clause K.2.2. This article does not reproduce them. Match the grade to the annex when you design.
The Tondach sheet gives no single pitch at which boarding starts. The designer and the covering maker decide together. Ask your supplier these questions:
- Which tightness class does this pitch call for with this covering?
- Does the covering maker accept an underlay without boarding at this pitch?
- Is the underlay approved for this pitch?
Which standard governs roof boarding in Slovakia?
STN 73 1901:2026 has the title Navrhovanie striech. Základné ustanovenia (Designing of roofs. Basic provisions). It applies to roofs of residential and non-residential buildings. Its February 2026 edition replaces the June 2005 edition in full.
The preview lists Annex K as normative, with the title Poistné hydroizolácie (podstrešné fólie). The foreword says Annex K is new in this edition. It contains these items:
- Clause K.2.2 on tightness classes of underlays.
- Table K.2, which assigns additional measures to tightness classes for concrete and fired lapped coverings.
- Table K.3, which sets requirements for underlays on a dimensionally stable substrate and for underlays stretched freely over rafters.
- Clauses K.3.2 to K.3.5 with instructions for laying.
- Tables K.7 and K.8 on boarding thickness.
The preview does not show the numbers in these tables. Ask the designer who holds the full text.
How does boarding relate to ventilation of the roof?
The Tondach drawing shows the ventilation air entering under the covering at the eaves. Counter battens above the underlay hold this gap open, and boarding is a separate layer below the underlay. A Wienerberger technician writing for ESTAV says 40 mm counter battens give the intake opening at the eaves. He also says leaves and twigs must not clog it.
The Tondach sheet shows a ventilation tile with a ventilation cross-section of about 42 cm2 and a bird guard strip at the eaves. These figures belong to one manufacturer's system. They do not set a requirement for another roof. For the general principle, see the entry on ventilated roof cavity, and see eaves ventilation for the intake.
What do people get wrong about roof boarding?
Three mistakes come up often.
- Boarding replaces the underlay. It does not. The Tondach drawing lists the underlay (Tondach Fol, PHI) and the boarding as two separate layers. The boarding carries the underlay.
- Any board will do. The Rypl article says the boarding must not be low-diffusion in the highest grade. The thickness comes from the standard's tables.
- Boarding belongs only to steep roofs. The Rypl article ties boarding to the highest tightness grade, which serves roofs below the safe pitch of the covering.
Whether a roof needs boarding is a design decision. It follows from the pitch, the covering, the tightness class and the thickness in the standard. Check the full build-up with the designer before the timber goes up. See the entry on Sd value for the value that rates the vapour behaviour of an underlay.
Frequently asked questions
- What is roof boarding in Slovak?
- The Slovak term is plné debnenie strechy. It is a continuous layer of timber boards or wood-based panels fixed to the rafters, with the roof underlay laid on top of it.
- Is roof boarding always needed under tiles?
- No. The Tondach sheet for its Bolero tile lists boarding in the roof build-up and marks it as depending on the roof pitch. The same sheet gives 30 degrees as the safe pitch. The answer comes from the covering maker's sheet and the designer.
- Does boarding change the ventilated air gap?
- No. Counter battens above the underlay hold the gap open, as the Tondach build-up drawing shows. The boarding lies below the underlay, so it does not form the gap.
- Where does the Slovak standard give the boarding thickness?
- In Annex K of STN 73 1901:2026. Table K.7 covers timber boarding and Table K.8 covers boards of composite wood material. The free preview shows the table titles but not the values, so this article does not quote them.
- Can the boarding be low-diffusion?
- For the highest tightness grade, the Rypl article says the boarding must not be low-diffusion. Ask the underlay supplier whether the boards you plan to use suit the underlay.
- What is the difference between boarding and counter battens?
- Boarding is a solid layer on the rafters, below the underlay. Counter battens lie above the underlay. In the Tondach build-up, the battens and the covering sit on them.
Sources
- STN 73 1901: 2026 Navrhovanie striech. Základné ustanovenia (náhľad) · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS SR) · Title page, Predhovor, 1 Predmet, Obsah, Príloha K (normatívna), K.2.2, K.2.6, K.3.2 to K.3.5, Tables K.2, K.3, K.7 and K.8
- Pojistné hydroizolace při nízkých sklonech střech a montáž parotěsnící vrstvy při dodatečné aplikaci krytiny · TZB-info (article by Jan Rypl, JUTA a.s., 14.12.2007) · Body text on tightness grades 2a, 2c and 3A, boarding and pitch
- Bolero posuvná škridla: Riešenie pre strechu (technický list) · Wienerberger s.r.o. (Tondach), hosted by Stavbaren · Pages 14 and 15
- Odvětrávání střechy prodlouží její životnost a zajistí příjemné bydlení i v podkroví · ESTAV.cz (company article, Wienerberger s.r.o., 17 July 2023) · Quote of the Tondach roof tile technician