Above-rafter insulation
Above-rafter insulation is a layer of insulation boards laid on top of the rafters, so the rafters stay on the room side of the insulation.
What is above-rafter insulation?
Above-rafter insulation (nadkrokvová izolácia) is a layer of insulation boards laid on top of the rafters of a pitched roof. The rafters then sit on the room side of the insulation. The manufacturer Dörken calls this on-roof insulation. The usual alternative is between-rafter insulation, where the insulation fills the space between the rafters.
Dörken describes three methods for a new pitched roof. The table compares them.
| Method | Where the insulation sits | What Dörken says about it |
|---|---|---|
| Pure between-rafter | In the space between the rafters | The roof is structurally not so high, which can matter for the look of the building or for the neighbouring buildings |
| Pure on-roof (above-rafter) | On top of the rafters, over the whole surface | Useful when the rafter height does not give effective insulation. The rafters only need the height that the static requirements demand |
| Over-rafter and between-rafter | Insulation between the rafters and a layer on top of them | Used when the insulation between the rafters does not reach the desired values. Dörken gives 140 mm between the rafters plus thin on-roof boards as an example |
Dörken sells the DELTA-MAXX POLAR system for this. Its AL board is polyurethane with an aluminium coating on both sides and is made for pitched roofs with on-roof insulation. Its MV and SP boards are polyurethane with a mineral fleece coating, and Dörken names them for roofs with insulation between the rafters. The AL and MV boards come in thicknesses from 80 to 180 mm. The SP board is 50 mm thick.
Where do the layers go when the insulation sits above the rafters?
Dörken gives the layer order for a roof without hard sheathing, read from the room side outward:
- The rafters, which stay on the inside of the insulation.
- An air and vapour barrier attached to the top of the rafters.
- The insulation boards, laid directly on top and covering the whole surface of the rafters.
- The top layer, a vapour-permeable underlay track on the upper face of the boards, with a self-adhesive overlapping element.
Underlays differ in how much water vapour they pass. The Sd value, the equivalent air layer thickness, describes this. A low Sd value means vapour passes easily. In the POLAR system the top layer is vapour-permeable and the air and vapour barrier sits on the room side of the insulation.
Does above-rafter insulation remove thermal bridges at the rafters?
Dörken states that full-surface installation over the rafters eliminates thermal bridges in the area of the rafters. It adds that an evenly thick insulation layer over the whole surface of the rafters prevents them. Greenspec, an independent UK guide, lists thermal bridging through the rafters as a weakness of insulation between the rafters only. It says that insulation attached over the rafters reduces thermal bridging.
The two sources do not claim the same strength, so treat the result as a design question. The statement covers the rafter area. Edges, joints, roof windows and penetrations still need detailing. Check the continuity of the layer in the thermal bridge review of the design.
Which air and vapour barrier goes with it?
The barrier position depends on the roof build-up. The table sets out the cases Dörken describes.
| Situation | Where the barrier sits | Source |
|---|---|---|
| New build, roof without hard sheathing | Attached to the top of the rafters, under the insulation boards | Dörken, pure on-roof insulation |
| New build, roof with hard sheathing | A roofing membrane with the necessary vapour barrier layer on the hard sheathing | Dörken, pure on-roof insulation |
| Above-rafter layer combined with between-rafter insulation | On the room side, on the underside of the rafters | Dörken, over-rafter and between-rafter insulation |
| Renovation | A renovation vapour barrier, to keep humidity from the interior away from the insulation | Dörken, roof renovation |
Greenspec adds a warning for the combined case. Putting a vapour-resistant board, such as foam board, over the rafters on top of low-resistance mineral wool between them is not advised. It is acceptable only with an effective vapour control layer on the underside of the rafters. In most cases Greenspec places a combined air tightness and vapour control layer on the warm side of the insulation.
Plan the air barrier as one continuous layer, with taped joints and sealed penetrations. The airtightness of the finished roof can then be tested.
How is above-rafter insulation used in a renovation?
Dörken presents above-rafter insulation as a renovation option, alone or combined with insulation between the rafters. Its renovation guidance says the work can be carried out from the outside without interfering with the living space. On its product page Dörken adds that with insulation on the roof and between the rafters, the entire interior construction can be retained.
Dörken also recommends a renovation vapour barrier to keep humidity from penetrating the insulation from the interior. For roofs where the surface must not rise much, it offers the narrow 50 mm SP board.
Greenspec says to check the condition of the timbers before starting work on an existing roof. The added thickness raises the roof line, so check the new outline against the height and the neighbouring buildings before the work starts.
When does above-rafter insulation make sense?
Greenspec lists the advantages and the drawback of insulation above the rafters:
- It gives extra depth for insulation.
- It keeps the existing internal space and head height.
- It reduces thermal bridging through the rafters.
- It requires raising the roof line.
Greenspec calls it the ideal solution where internal space is at a premium. Dörken adds that with hard sheathing on a roof with many corners and details, the roof can be made windproof from the outside.
What does the Slovak decree require for a pitched roof?
Decree 532/2002 Z. z. sets the general technical requirements for construction. Under Act 25/2025 Z. z. the decree stays in force until new implementing regulations take effect, at the latest until 31 March 2027 (§ 84 ods. 23 písm. b of the act). Section 26 of the decree covers roofs:
- Subsection 1: the roof must protect the building from the outdoor climate. It must collect and drain rainwater and keep it out of the structures. It must hold snow and ice so that they do not endanger pedestrians and road users.
- Subsection 3: the roof must meet the requirements for heat transfer, water vapour diffusion and airtightness that the Slovak technical standards set.
- Subsection 4: the roof must be designed so that water vapour does not condense in it. A roof where vapour does condense is acceptable if the function and service life of the external wall are not endangered.
- Subsection 6: a pitched roof with roof planes steeper than 25 degrees must have a guard against sliding snow.
Section 26 gives no thickness or U-value for the insulation. Those values come from the standards that subsection 3 names. We read the consolidated text dated 1 March 2020 on Slov-Lex. Check that it is the version in force for your project before you quote a section in a permit file.
What should a designer check before choosing it?
- Whether the thicker roof still fits the height and outline rules for the site.
- How the fixings hold the battens and the covering on the insulation, and whether they suit the total thickness.
- Whether the Sd values of the layers form a sensible sequence for the whole build-up.
- Whether the air and vapour barrier is continuous at eaves, gables, chimneys and roof windows.
- Whether the covering needs a snow guard at the roof pitch.
Dörken positions above-rafter insulation for roofs where the rafter height is too small for effective insulation. Check the design as one system, from the room side to the covering.
Frequently asked questions
- Is above-rafter insulation the same as a warm roof?
- No. The glossary entry on warm roof describes a flat-roof build-up, with insulation above the structural deck and the membrane on top. Above-rafter insulation is the pitched-roof case, where Dörken lays insulation boards on top of the rafters, under the covering.
- Does above-rafter insulation remove all thermal bridges at the rafters?
- Dörken states that full-surface installation over the rafters eliminates thermal bridges in the rafter area. Greenspec, a UK guide, says more cautiously that insulation over the rafters reduces thermal bridging. Edges, joints, roof windows and penetrations still need detailing in the design.
- Where does the vapour barrier go in an above-rafter roof?
- For a new roof without hard sheathing, Dörken attaches an air and vapour barrier to the top of the rafters, under the insulation boards. Where above-rafter and between-rafter insulation are combined, Dörken puts the barrier on the room side, on the underside of the rafters.
- Does above-rafter insulation make the roof higher?
- Yes. Greenspec lists a raised roof line as the main drawback of insulation over the rafters. Dörken offers a narrow 50 mm board, the SP version, for renovations where the roof surface must not rise much.
- Does a pitched roof in Slovakia need a snow guard?
- Yes, if the roof planes are steeper than 25 degrees. Section 26 subsection 6 of Decree 532/2002 Z. z. says such a pitched roof must have a guard against sliding snow. We read the consolidated text dated 1 March 2020 on Slov-Lex.
- Can above-rafter insulation be added during a renovation?
- Yes. Dörken says the renovation work can be carried out from the outside without interfering with the living space. The manufacturer also recommends a renovation vapour barrier to keep humidity from the interior away from the insulation. Inspect the existing roof first.
Sources
- Vyhláška Ministerstva životného prostredia Slovenskej republiky č. 532/2002 Z. z., ktorou sa ustanovujú podrobnosti o všeobecných technických požiadavkách na výstavbu a o všeobecných technických požiadavkách na stavby užívané osobami s obmedzenou schopnosťou pohybu a orientácie · Ministerstvo životného prostredia SR, via Slov-Lex · § 26 ods. 1, 3, 4 a 6
- Zákon č. 25/2025 Z. z. o výstavbe a o zmene a doplnení niektorých zákonov (stavebný zákon) · Národná rada SR, via Slov-Lex · § 84 ods. 23 písm. b
- DELTA-MAXX POLAR: on-roof insulation (product page) · Dörken GmbH & Co. KG · Advantages, Application, Technical data
- Roof systems for new buildings · Dörken GmbH & Co. KG · Pure between-rafter insulation; Over-rafter and between-rafter insulation; Pure on-roof insulation
- Solutions in the field of roof renovation · Dörken GmbH & Co. KG · DELTA system solutions for the roof renovation
- Housing Retrofit: Unventilated pitched roof insulation · Greenspec (UK independent guidance) · Insulation positions: Between and above the rafters; Air tightness