What narrows the choice of roof covering first?
The first decision is the roof pitch. A pitched roof has a covering that sheds water: tile, slate, shingle or metal. A flat roof has a continuous membrane that must hold water back wherever it stays. The US guide UFC 3-110-03 (edition of 1 May 2012, change 2 of 1 January 2017) divides roofs the same way. It is a US military guide, not a Slovak rule. This article uses it only where it describes a general principle.
The manufacturer sets the smallest pitch for a given product in its installation instructions. This article gives no value and takes none from general tables. Choose the covering together with the pitch, not after the roof frame is finished. Cut roof or trusses: pitched roof covers the structure. For flat roofs, read Flat roof on a family house.
How do pitched roof coverings differ?
Price, service life and weight change with the manufacturer, so this article gives none. Take these data from the product data sheet. UFC supports the following general points.
- Clay and concrete tile. UFC prefers clay tile and standard concrete tile. It advises lightweight concrete tile only when the structure or the appearance requires it. Battens promote ventilation and drying of the tiles.
- Slate. UFC calls slate extremely long lasting but expensive. For new construction, it advises slate only when architectural compatibility with neighbouring buildings requires it.
- Metal sheet. For metal roofs, UFC lists pre-finished aluminium, pre-finished galvanised steel, AlZn alloy (Galvalume) and stainless steel. It allows copper only on historic projects. A standing seam can be fully watertight, like a membrane. It can also be a system with seams that are not watertight and rely on the slope.
- Asphalt shingle. UFC calls it a versatile, low-cost steep-slope covering. It needs a continuous substrate and an underlayment, which needs continuous support.
What is the covering of a flat roof?
A flat roof has no covering in the true sense. It has a continuous waterproofing layer. UFC 3-110-03, section 2-8, describes bitumen membranes, EPDM and weldable thermoplastic membranes of PVC and TPO. Materials that do not tolerate each other must not touch. UFC says the type of plasticiser in PVC decides under which conditions the membrane may be used. Polystyrene must not touch hot-mopped bitumen systems. Flat roof on a family house covers the build-up, falls and details.
What lies under the covering, and what is the underlay for?
Under the covering lies an underlay, often a membrane or a felt. According to UFC, it has several jobs. It gives weather protection for a limited time until the covering is laid. It acts as a second waterproof layer if water gets through the covering. It separates the covering from the substrate. UFC adds that the underlay also helps keep the fire rating of the roof and meet the manufacturer's warranty requirements. It should be vapour-permeable unless it is designed on purpose as a vapour barrier.
The covering manufacturer sets the exact type of membrane, the laps and the sealing. Slovak law requires a structure to be built from products and materials suitable for the intended use (Act 25/2025, § 19 ods. 2). Ask the manufacturer for the installation instructions for the whole build-up, not only for the covering.
What does the covering do to the roof frame, snow and wind?
A heavy covering loads the rafters and purlins for the whole life of the house. Changing the covering after the roof frame is designed is therefore not a small change. It affects the structure. If you want a heavier covering in a renovation, UFC starts with a survey of the existing condition. It adds that a structural analysis may be needed for a different type of roof, because the dead load changes. The structural engineer sets the snow and wind loads under Eurocode 1: EN 1991-1-3 (snow loads) and EN 1991-1-4 (wind actions). The values depend on the site.
According to UFC, the designer sets the wind uplift pressures and the dimensions of the corner, perimeter and field zones under the applicable code. The edges and corners are therefore assessed separately. The anchoring of the covering is designed from the calculation and the manufacturer's rules. Snow can slide off a pitched roof. UFC recommends assessing the need for snow guards and placing them over entrances, walkways and parking areas, and where one roof lies above another.
What should you watch on a metal roof?
Different metals
UFC advises avoiding contact between different metals. Copper lines need insulation, to prevent copper ions running off with the water. Steel and aluminium must not touch unless a coating, sealant or other non-conductive material separates them. Anchors must be compatible with the main material. Sheet metal must also not touch timber treated with preservatives under pressure, because the treatment corrodes the metal. Copper on a chimney next to a roof of another metal is therefore a risk. Settle it in the project, for example with the sheet manufacturer.
Expansion and anchoring
Metal expands when the temperature changes. UFC requires the design of the roof and its movement joints to follow the manufacturer's system and requirements. On a standing seam, the hold-down clips are attached to the substrate to resist wind uplift. Condensation can form under a metal sheet. The manufacturer sets the ventilation and the separating layer in the build-up, so ask for its detail.
Where do roofs leak most often?
The open field of a covering seldom leaks. Water gets in where the covering is interrupted or changes direction. UFC therefore requires a limit on penetrations through the roof. It comes down to four places.
- Chimney. The chimney flashing connects to both the chimney and the covering. The covering manufacturer sets the details.
- Verge. At the verge, wind can drive rain under the covering, so edge parts need firm anchoring.
- Valley. It collects water from two roof planes, so it needs a continuous substrate and a manufacturer detail.
- Penetrations. Soil vent pipes, roof windows and PV anchors need system collars made for the type of covering.
What do the municipality and the monuments office decide about the covering?
The choice of covering may not belong to the builder alone. Decree 392/2023 lists a roofing regulative among the optional regulatives of a municipal plan. It sets the allowed or banned type and the minimum or maximum pitch. A colour regulative is listed too (§ 2 písm. aw and ax, § 16 ods. 3 písm. i and j). A zone plan has the same options in § 16 ods. 6 písm. c and d. Construction is allowed only in line with the binding part of the plan (Act 25/2025, § 21 ods. 1). The spatial planning authority issues a binding opinion on the building intent (§ 20 ods. 1 písm. a). Get the municipal land-use plan before the first sketch.
If the house is a cultural monument or stands in a monument zone, the regional monuments office also decides. For a property in a monument zone, it issues a decision on the intent of the works and sets conditions. These cover the massing, the height arrangement and the architectural design of the exterior (Act 49/2002, § 32 ods. 5 and 7). Get the decision before you order the covering.
Do you need a permit to replace the covering?
For replacing the roof covering, usually not. Under § 18 ods. 5 písm. a) bod 1 of Act 25/2025, you need no decision on the building intent and no notification. This covers the repair or replacement of the roof covering or of the surface of flat roofs. The same applies to replacing gutters and downpipes. The act no longer issues building permits, a decision on the building intent replaced them. Yet notification is required for maintenance that could affect stability, fire safety, the look in the public space or the environment. It is also required for maintenance of a cultural monument (§ 18 ods. 4 písm. c and d). A building alteration in a monument zone also needs notification (§ 18 ods. 3 písm. g).
The act does not say how these cases combine. If you change the material, the colour or the shape of the roof, ask the building office. Restoration of a cultural monument includes maintenance and repair. Before it starts, the owner must ask the regional monuments office for a decision on the restoration intent (Act 49/2002, § 32 ods. 1 and 2). From 1 January 2027, Act 243/2026 rewrites § 18 ods. 4 (Art. I, bod 62). Notification is then required for every maintenance of a cultural monument. For a building in a monument zone that is not a monument, it is required when the maintenance changes the outward appearance.
How do you choose a covering?
- Read the regulatives of the spatial plan and find out whether the plot lies in a monument zone.
- Choose the material together with the roof pitch and shape, and ask the manufacturer for the installation instructions with the smallest pitch.
- Have the structural engineer design the roof frame for the chosen covering, snow and wind, including future PV.
- For metal, settle the separation of different metals and the build-up under the sheet with the manufacturer.
- Draw the chimney, verge, valley and penetrations in the project, not on the scaffolding.
- Choose the contractor by references with the same covering and by the offer, not by price alone.