Roof flashing
Roof flashing is a metal or flexible sheet lining that directs water away from roof edges, valleys and penetrations such as chimneys.
What is roof flashing and where is it fitted?
Roof flashing is a lining that directs water away from roof edges and from the places where something passes through the roof. The IBHS guide, from an insurance-industry research body, gives this as its primary function. Flashing can be metal or non-metal. In a two-piece assembly the base flashing can be another metal flashing, a flexible flashing or a roofing membrane.
The IBHS guide names these locations:
- Valleys, where two roof planes meet at a V angle.
- Penetrations that stand above the roof, such as chimneys and vent stacks.
- Places where a sloped roof meets a higher wall.
- The roof edge, where a fascia, drip edge or gravel stop ends the roof.
The IBHS copper guide adds skylights. A lecture on pitched roof details at the Czech Technical University (ČVUT) lists flashing at gables and vertical structures, valleys, ridges and hips. The same lecture lists chimneys and roof windows as penetrations.
How do the main flashing locations differ?
Each location needs its own detail. The table gives the arrangement that the sources describe.
| Location | Usual flashing form | What the sources say |
|---|---|---|
| Valley | Valley flashing, a lining where two roof planes meet | IBHS: metal valley flashing works with any roofing material, most often with tile, slate, metal and wood shakes. ČVUT: a very sensitive detail, best made from sheet metal parts |
| Chimney and other penetrations | Base flashing with counterflashing over it | IBHS: the counterflashing covers the upper edge of the base flashing and its fasteners. The base flashing is secured on its own |
| Higher wall | Counterflashing where the roof meets the wall | IBHS: it prevents water infiltration at the transition from the roof plane to the wall |
| Roof edge | Fascia, drip edge or gravel stop | IBHS: it directs water away from the roof edge, into a gutter, onto a surface below or to the ground |
| Roof window | Flashing around the window frame | IBHS copper guide: proper flashing is required around skylights. ČVUT: the vapour barrier connects to the window, usually with an X cut and taped joints |
The ČVUT lecture also stresses that the covering and its details form one system. Do not mix details of one covering with parts of another.
Which metals do roofers use for flashing?
The IBHS guide lists steel, copper, aluminium, zinc alloy, stainless steel and lead as flashing materials. The choice of metal brings a second decision, because a sound sheet can corrode beside the wrong fastener or neighbouring metal. The table collects what the sources say.
| Metal | What the sources say | Contact caution |
|---|---|---|
| Copper | IBHS copper guide: flashing is one of the more critical areas of copper roof design | NZ code table: not suitable in contact with aluminium, zinc, galvanised steel or coated steel |
| Zinc | Listed in the IBHS materials table. Zinc and galvanised steel sit near the corroded end of the IBHS galvanic series | NZ code table: not suitable in contact with copper |
| Aluminium | Listed in the IBHS materials table | NZ code table: not suitable in contact with copper, including pre-painted aluminium |
| Stainless steel | IBHS: stainless steel in air, with few chlorides, is typically passive | NZ code table: suitable in contact with copper |
| Lead | Listed in the IBHS materials table | NZ code: lead in contact with AZ coated steel causes premature corrosion |
The IBHS guide explains galvanic corrosion. When two dissimilar metals touch in an electrolyte, such as salt water, ions of one metal move to the other. The first metal corrodes. The risk grows the further apart the two metals sit in the galvanic series, and with more conductive electrolytes. The guide says to pay more attention near coastal areas. Where metals must touch, it advises an isolator such as a rubber membrane or bituminous paint. It also says that many pressure-treated woods contain copper, so treat them as copper.
The NZ code separates contact from run-off. It says that run-off from a metal higher in its galvanic table onto a lower one generally does not cause corrosion. Run-off in the other direction may. It also says the compatibility table is indicative only. Read the table as a checklist of pairings to avoid, not as a Slovak rule.
Why do roof flashings leak?
The IBHS guide names thermal movement as a cause. Metal expands and contracts more than the wood or masonry under it. A moving flashing can loosen fasteners and disengage from cleats and clips. Water can then enter at the joints. The guide asks for oversized or slotted fastener holes in cleats, so the cleat can move without damaging the fastener. It also asks for lapped joints that allow the sections to move.
The guide says seams should be sealed with a flexible or non-curing sealant that allows for movement. A seam may instead be built to allow movement and to direct water. Either way, the detail must tolerate movement.
Corrosion is the second cause. The IBHS copper guide says that using less noble fasteners, which corrode, is the most common reason for fastener failure on copper roofs.
Where are the common leak points in roof flashing?
Most leaks start in a few places. The table lists them with the mechanism that the sources give.
| Leak point | Why it fails | Source |
|---|---|---|
| Fasteners and cleats | Thermal movement loosens fasteners and disengages cleats and clips | IBHS metal flashing guide, section 3.5 |
| Joints and seams | A joint needs a flexible or non-curing sealant, or a design that allows movement | IBHS metal flashing guide, section 3.9 |
| Penetrations | They are always an area of concern. The detail must be watertight and allow thermal movement | IBHS copper guide, section 2.13 |
| Valleys | A valley collects water and lies at a lower slope than the planes beside it, so design and installation matter more | IBHS copper guide, section 2.12 |
| Less noble fasteners | They corrode in contact with copper and fail | IBHS copper guide, section 3.8 |
| Through-fastened copper | Rare and usually avoided, because each hole is a potential leak point that grows under thermal stress | IBHS copper guide, section 2.4 |
What should you check on an existing roof flashing?
The IBHS copper guide says standard maintenance includes periodic inspection for loose or damaged flashings. It also includes clearing standing water and debris, especially from gutters. From a safe access point, look for lifted or missing cleats. Look for fasteners with rust or a different colour from the sheet around them. Stains on a ceiling near a chimney, a roof window or a wall junction are a reason to inspect the flashing above. A repair should keep dissimilar metals apart.
Which misconceptions about roof flashing are wrong?
- Any sealant will do. The IBHS guide asks for a flexible or non-curing sealant that allows for movement, or a seam built to allow movement.
- Any two metals can share a detail. The NZ code table marks several common pairings, including copper with zinc and copper with aluminium, as not suitable for contact.
- Any thickness will do. The IBHS guide says the thickness and dimensions come from local building codes and the roof material manufacturer. It says cleats should be one gauge heavier than the flashing they secure.
Does Slovak law set specific roof flashing rules?
Section 26 of Decree 532/2002 Z. z. covers roofs. Subsection 1 says the roof must collect and drain rainwater and keep it out of the structures. The section does not name flashing or any flashing material. We read the consolidated text dated 1 March 2020 on Slov-Lex. Under Act 25/2025 Z. z. the decree stays in force until new implementing regulations take effect, at the latest until 31 March 2027 (§ 84 ods. 23 písm. b of the act).
The IBHS, copper and NZ sources are foreign industry guidance, not Slovak regulation. For a project in Slovakia, check the current Slovak standards catalogue and the installation sheet of the flashing manufacturer. The roof boarding and liquid-applied waterproofing entries cover adjacent layers that a flashing has to meet.
Frequently asked questions
- Where is roof flashing most often fitted?
- Roof flashing goes at valleys, at penetrations such as chimneys, where the roof meets a higher wall, and along the roof edge. The IBHS guide names these places. The IBHS copper guide adds skylights. A ČVUT lecture on pitched roofs also lists gables, ridges, hips and roof windows.
- Can copper flashing sit next to zinc or aluminium?
- No, not in contact. The NZ Metal Roofing code of practice marks copper as not suitable in contact with aluminium, zinc and galvanised or coated steel. The table is only indicative, and contact and run-off are separate risks. Check both when a copper detail meets another metal.
- How should seams in a metal flashing be sealed?
- The IBHS guide says seams should be sealed with a flexible or non-curing sealant that allows for movement. It also accepts a seam built to allow movement without a sealant. Joints that must stay watertight need to be seamed.
- Why do metal flashings leak?
- Thermal movement is one cause. The IBHS guide says that metal flashings which move can loosen fasteners, disengage from cleats and clips, and let water in at joints. Galvanic corrosion between dissimilar metals is another cause.
- Which fasteners should go with copper flashing?
- The IBHS copper guide names ring shank copper nails or 300 series stainless steel nails as common choices. It says that 300 series stainless steel or brass screws are also suitable. It warns that fasteners made of an incompatible metal can corrode galvanically where they touch the copper.
- Can a chimney stand in a roof valley?
- No. A ČVUT lecture on pitched roof details says a chimney must not stand in a valley. The same lecture calls the valley a very sensitive detail and advises making it from sheet metal parts.
Sources
- RICOWI Roof Guide: Metal Flashing · Insurance Institute for Business & Home Safety (IBHS) · Sections 3.1, 3.2, 3.4, 3.5, 3.6, 3.8, 3.9, 3.10; Tables 3.4-1 and 3.6-1
- RICOWI Roof Guide: Copper · Insurance Institute for Business & Home Safety (IBHS), content attributed to the Copper Development Association · Sections 2.4, 2.4.1, 2.12, 2.13, 3.8, 3.9, 3.9.5, 3.9.6
- Code of Practice v26.09, section 4.9 Dissimilar Metals · New Zealand Metal Roofing Manufacturers Inc. (NZMRM) · Sections 4.9.1, 4.9.1A, 4.9.1B, 4.9.4B
- Šikmé střechy: konstrukční řešení detailů (lecture, Pozemní stavitelství IV) · ČVUT, Fakulta architektury · Slides 12, 15, 25, 34, 36
- Vyhláška Ministerstva životného prostredia Slovenskej republiky č. 532/2002 Z. z., ktorou sa ustanovujú podrobnosti o všeobecných technických požiadavkách na výstavbu · Ministerstvo životného prostredia SR, via Slov-Lex · § 26 ods. 1
- Zákon č. 25/2025 Z. z. o výstavbe a o zmene a doplnení niektorých zákonov (stavebný zákon) · Národná rada SR, via Slov-Lex · § 84 ods. 23 písm. b