Waterproofing sealing tape
A waterproofing sealing tape is a fabric strip that is set into liquid waterproofing at corners and movement joints under tiles.
What is a waterproofing sealing tape?
A waterproofing sealing tape is a strip of fabric that is pressed into liquid-applied waterproofing where the surface moves or changes direction. It sits under ceramic tiles, between two coats of the coating. The Ceresit sheet for its tape, CL 152, says the tape reinforces the sealing layers and seals the substrate together with them. In Slovak the Ceresit sheets call it izolačný pás or tesniaci pás. The tape works only together with the liquid-applied waterproofing.
This article uses the Ceresit CL 152 data sheet as its reference, because the Ceresit coating sheets name it. Other makers sell tapes for the same job. Check their sheets in the same way.
Where does the tape go in a tiled wet area?
The Ceresit sheets place the tape at movement joints and connection joints. The CL 152 sheet describes it as a tape for bridging movement and connection joints under ceramic tiles and paving. It is for walls and floors, indoors and outdoors. The CL 51 sheet, for indoor wet rooms, asks to reinforce the coating at movement and connection joints with CL 82 or CL 152. The CL 50 sheet asks for the same in its joints. For terraces and balconies it adds drain channels, gullies and inlets and the transition to metal flashing.
| Location | What the Ceresit sheet says | Sheet |
|---|---|---|
| Movement joint | Tape bridges the joint and is formed into a loop at the corner or joint | CL 152 |
| Connection joint | Coating reinforced with tape (CL 82 or CL 152) | CL 51, CL 50 |
| Drain channel, gully or inlet on a terrace or balcony | CL 152 laid between two coats of CL 50 | CL 50 |
| Transition to metal flashing on a terrace or balcony | CL 152 laid between two coats of CL 50 | CL 50 |
For a shower with a recessed drain channel, the CL 51 sheet recommends CL 50 as the coating instead. The drain type therefore decides which coating carries the tape. The shower channel drain and the floor drain have their own articles.
The 2024 English CL 51 sheet adds a second item for the joints. It asks for CL 82 or CL 152 tape at settlement and edge joints. It asks for CL 83 or CL 84 sealing collars at wall junctions and floor drains. The tape or collar goes into the first coat and the second coat embeds it.
How do you lay the tape into the coating?
The CL 152 sheet gives four steps.
- Apply the first coat of waterproofing around the joint. The coat must slightly exceed the width of the tape.
- Press the tape into this fresh coat, so that no air gaps remain underneath.
- At a movement joint, press the tape into a loop in the corner or joint. The loop helps to bridge movement in the substrate.
- Cover the tape with the second coat, so that the seal is complete.
The CL 51 sheet gives the same order. The tape goes into the fresh first coat and the second coat works it in. The sheet adds that each coat goes on only when the one before it is dry, and that the coats cross each other. It asks for dry conditions and an air and substrate temperature from +5 °C to +25 °C.
What are the technical data of the CL 152 tape?
The table gives the figures printed in the Slovak CL 152 sheet. They describe the tape alone. The coating it is used with has its own data.
| Property | Value in the sheet |
|---|---|
| Base | Perforated polyester fabric coated with rubber |
| Width | 120 mm |
| Total thickness | 0.66 mm plus 0.09 mm |
| Rolls | 10 m and 50 m |
| Elongation at maximum force | More than 50 % |
| Resistance to water pressure | 1.5 bar after 24 hours |
| Heat resistance | From -30 °C to +90 °C |
| Laying temperature, air and substrate | +5 °C to +25 °C |
| Named coatings | Ceresit CL 50, CL 51, CR 166 and the CR 90 sealing mortar |
The sheet also lists a chemical resistance test. Substances act on the tape for seven days. The sheet gives 3.2 to 3.3 bar afterwards for acids, alkalis and sea water. The sheet says the substrate must meet the requirements in the data sheet of the sealing product in use. A coating that the sheet does not name needs its own check before you combine the two.
How is a sealing tape different from a waterproofing membrane?
A waterproofing membrane is a sheet material with its own article. A sealing tape is a strip, 120 mm wide in the Ceresit case. It goes only at joints, corners and drains, between two coats of a liquid product. The sheet describes the tape as a reinforcement of the sealing layers, so the coating still covers the open field of the floor. The liquid waterproofing article covers the choice of the field waterproofing.
How does the tape relate to a drain sealing collar?
A tape is a strip laid into a flat coating. A collar is a part that fits to the drain body. TECE describes a drain profile with a flexible sealing collar that is fixed to the drain at the factory. The installer snaps it into the outlet and works it into the surface waterproofing, so no separate bonding to a flange is needed. That TECE document is in German and the summary here is ours. Ceresit offers its own collars, CL 83 and CL 84, for wall junctions and floor drains. Where the drain maker supplies a collar, follow its installation instructions for the drain. Follow the coating sheet for the tape.
What goes wrong when the tape is missed or misplaced?
- No tape at a movement joint. The sheets call for reinforcement at movement and connection joints, so a joint with coating alone falls outside the sheet.
- Tape laid on a dry coat. The CL 152 sheet says to press the tape into the fresh first coat and cover it with the second. A tape stuck on afterwards is not the method described.
- Air under the tape. The sheet asks for the tape to be pressed in without air gaps.
- Straight tape at a movement joint. The sheet asks for a loop at the corner or joint.
- Work in the cold. Air and substrate below +5 °C are outside the stated laying range.
Frequently asked questions
- Do I still need the tape if the coating goes on in two coats?
- Yes, wherever the coating meets a movement or connection joint. The CL 51 sheet asks for reinforcement at these joints with CL 82 or CL 152. The CL 50 sheet asks for the same and, on terraces and balconies, for CL 152 at drain gullies and transitions. Two coats alone are not the method those sheets describe for these places.
- Which coatings does the CL 152 tape work with?
- The Ceresit sheet names CL 50, CL 51, the CR 166 coating and the CR 90 sealing mortar. Check the data sheet of any other waterproofing system before you combine it with the tape.
- Can the tape be used on walls as well as floors?
- The CL 152 sheet says it is for walls and for floors, indoors and outdoors, under ceramic tiles and paving.
- How is the tape laid at a movement joint?
- Press it into the fresh first coat without air gaps, form a loop in the corner or joint, and cover it with the second coat. The sheet says the loop helps to bridge movement in the substrate.
- What temperature is needed to lay the tape?
- The sheet gives a laying range of +5 °C to +25 °C for both air and substrate, in dry conditions. Outside that range, wait for the conditions to change or move the work indoors.
- How wide is the CL 152 tape and how is it sold?
- The tape is 120 mm wide and comes in rolls of 10 m and 50 m, according to the Ceresit sheet.
Sources
- Ceresit CL 152 Izolačný pás, technický list · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Spracovanie; Neprehliadnite; Technické údaje (CERESIT CL 152_TDS_1_0217)
- Ceresit CL 51 Express 1-K, jednozložková elastická hydroizolácia pod obklady a dlažbu v interiéri, technický list · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Spracovanie (platný od 05/2023)
- Ceresit CL 50 Express 2-K, dvojzložková elastická hydroizolácia pod obklady a dlažbu, technický list · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Spracovanie
- TECEdrainprofile, technische Information TI 2019 (Duschprofil, Abdichtung und Montage) · TECE GmbH · Einleitung; Abdichtung; Anschluss von Verbundabdichtungen an Bodenabläufe, Duschrinnen und -profile
- Ceresit CL 51 Express 1-K, fast drying flexible dispersion-based waterproofing film, technical data sheet · Henkel Slovensko, spol. s r.o. · Application (CERESIT_CL51_TDS_03_2024)