Floor drain

A floor drain is a single outlet set into the floor that collects water at one point and holds a trap against sewer gas.

A floor drain, called podlahová vpusť in Slovak, is a single point outlet set into the floor. It takes the water from a shower without a tray, where the floor itself carries the water to one place. The drain is only one part of the job. The screed, the waterproofing, the trap below the drain and the tiles all meet at it, so plan them together.

How is a floor drain different from a shower channel?

A floor drain collects water at one point, so the floor falls toward it from every side. A shower channel collects water along a line, so the floor falls in a single plane toward the channel. Geberit sells its floor drain with a grate measuring 80 × 80 mm. The grate height, offset and tilt can be set to suit the tile. Its CleanLine channel is cut to length on site and can sit in the centre of the shower or against a wall.

FeatureFloor drain (point)Shower channel (line)
CollectionOne point, floor falls from all sidesOne line, floor falls in one plane
Grate80 × 80 mm in Geberit's range, height, offset and tilt adjustableLong strip, cut to length (Geberit CleanLine)
SealingSealing foil (Geberit)Sealing foil fitted at the factory (Geberit CleanLine)
StandardTrapped floor gullies fall under EN 1253-1Linear channels are outside the scope of EN 1253-1, which refers to EN 1433 for them

Where in the shower does a floor drain go?

The drain sits at the lowest point of the shower floor, so every part of the shower falls toward it. Because water runs in from all sides, the screed is shaped as several sloped planes that meet at the drain. The fall itself is covered in shower floor fall. The grate sits in the middle of the tile field, so the tile layout is planned around it.

Geberit describes its floor drain as a universal solution for showers at floor level. According to Geberit, the grate height, offset and tilt can be set to suit the tile. The position is fixed before the screed is poured, because moving a drain later means reworking the floor. In a renovation the existing waste pipe may already fix the outlet position. Keep the grate clear of the tile cuts, so that the tile field stays regular around it.

Does a floor drain need an odour trap, and how much flow does it carry?

Indoors, yes. TECE says a trap can be left out only outdoors, and only in some cases. STN EN 1253-1 is the Slovak edition of the European standard EN 1253-1:2015. Its title is "Gullies for buildings, Part 1: Trapped floor gullies with a depth water seal of at least 50 mm". The standard covers floor gullies for drainage systems that need a trap with a water seal of at least 50 mm. The trap keeps sewer gas out of the building, says TECE.

TECE quotes the minimum flows from section 4.8.1 of DIN EN 1253-1, the German edition of the same standard. The values are for floor gullies with inflow through the grate at a water head of 20 mm.

Nominal outlet (DN)Minimum flow, floor gullyWater head a
DN 32 (ID 30)0.4 l/s20 mm
DN 400.6 l/s20 mm
DN 500.8 l/s20 mm
DN 75 (ID 70)0.8 l/s20 mm
DN 110 (ID 100)1.4 l/s20 mm

Not every shower drain has a 50 mm seal. TECE lists two drains for its shower profile. The flat version has a 30 mm water seal and a minimum build-up height of 65 mm. The normal version has a 50 mm seal and needs 95 mm. Geberit offers its shower tray trap with a 30 mm or a 50 mm seal. The scope of EN 1253-1 leaves out linear drainage channels, which EN 1433 covers. Read the seal depth and the flow value for the exact product on its data sheet.

Which grate load class does a bathroom need?

EN 1253-1 grades grates by load class. TECE lists three in its technical information. H 1.5 has a test load of 1.5 kN and is for areas where no load is expected. K3 has a test load of 3 kN and is for areas without vehicle traffic, which includes bathrooms in flats. L 15 has a test load of 15 kN and is for light vehicle traffic. TECE says that choosing the class is the task of the designer and that, in doubt, the higher class is chosen.

How much room does a floor drain need under the floor?

The trap sits under the grate, so the floor needs room beneath the drain for the trap and the outlet pipe. The Geberit brochure used here gives no installation height for its floor drain, so read the data sheet of the model. For channel products the makers give heights. Geberit supplies the CleanLine trap for installation heights of at least 6.5 cm or at least 9 cm. The TECE shower-profile drain needs at least 65 mm from the underside of the drain to the top of the screed. The version with the 50 mm seal needs 95 mm. In a renovation the existing slab and floor set the height, so check it before you choose the drain.

How does a floor drain join the waterproofing?

The join between the waterproofing and the drain is where two systems meet. The drain body is rigid, while the screed and tiles move a little. TECE prints a Seal System mark on the sealing collars and packaging of its drains. It also supplies a list of waterproofing products tested with them. The independent test institute KIWA TBU did the tests, under German test principles for bonded waterproofing. A drain and a waterproofing product that the drain maker lists together leave less to chance at the joint. The joint is hidden under the tiles, so the choice is made on paper before the screed is poured.

Join tapes and liquid layers to the drain body as the drain maker instructs. The sealing collar or foil supplied with the drain is the part the maker designed for this joint, so use it. Where the waterproofing is a liquid-applied waterproofing layer, a waterproofing sealing tape can bridge the joint. The Ceresit data sheet for its CL 152 tape says to lay the tape between two coats of Ceresit waterproofing. The tape goes into the fresh first coat and the second coat covers it.

What should you check before choosing a floor drain?

  • Grate adjustment. Check that the grate can be raised, lowered and tilted to match the tile thickness and the fall of the screed.
  • Trap and standard. Ask for the EN 1253-1 test data, including the water seal depth and the flow value for the outlet size you need.
  • Load class. Check the grate load class on the data sheet.
  • Sealing system. Pick the waterproofing that the drain maker lists as tested with that drain.
  • Height. Check the installation height against the floor build-up.
  • Outlet size. Match the outlet DN to the pipe and to the flow values in the table above.

For the shower as a whole, read the article on wet-room showers alongside this one.

Frequently asked questions

Is a floor drain the same as a shower channel?
No. A floor drain collects water at one point, while a shower channel collects it along a line. Both need a fall toward the outlet, but the floor is shaped differently for each.
Does a floor drain need an odour trap?
Indoors, yes. EN 1253-1 covers trapped floor gullies with a water seal of at least 50 mm, and the trap keeps sewer gas out of the building. Some shower drains have a 30 mm seal, so read the seal depth on the data sheet of the exact product.
What flow must a floor drain carry?
TECE quotes minimum flows from DIN EN 1253-1 for floor gullies at a water head of 20 mm. They are 0.6 l/s for DN 40, 0.8 l/s for DN 50 and 1.4 l/s for DN 110. The value for a specific drain is in its data sheet.
Can the grate height be matched to the tile?
Geberit says the height, offset and tilt of its floor drain grate can be set to suit the tile. Check the adjustment range on the data sheet of the model you choose.
Which sealing system should go with a floor drain?
Use the sealing collar or foil supplied with the drain and a waterproofing product that the drain maker lists as tested with it. TECE marks its tested drains with the Seal System logo.
Is a floor drain suitable for every shower?
It is a point outlet, so it suits a shower where the floor can fall from all sides toward one place. Whether it or a channel fits a given room depends on the layout, the outlet position and the fall the screed can take.

Sources

  1. Sprchy v úrovni podlahy a vane: šikovné riešenia pre lepšie kúpeľne (2023) · Geberit Slovensko · Podlahový odtok Geberit; Sprchové žľaby Geberit CleanLine; Setaplano
  2. TECEdrainprofile, Technische Informationen · TECE GmbH · Abläufe (DIN EN 1253-1, section 4.8.1); Belastbarkeit von Rosten; Seal System; Ablauf flach und Ablauf Norm
  3. STN EN 1253-1: Vpusty v budovách. Časť 1: Podlahové vpusty so zápachovou uzávierkou s hĺbkou vodného uzáveru najmenej 50 mm · Slovak standards catalogue (normy.normoff.gov.sk), STN EN 1253-1:2015, August 2015 · Title page, foreword and clause 1 Scope (catalogue preview)
  4. Ceresit CL 152 Izolačný pás, technický list · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Spracovanie