Shower floor fall

A shower floor fall is a slope built into the screed of a level-access shower that carries water from the floor to the drain.

A shower floor fall is the slope built into the floor of a level-access shower so that water runs across the tiles to the drain. The fall is formed in the screed under the waterproofing, not in the tiles. Its size decides whether water leaves the floor or stands on it.

What is a shower floor fall?

A shower floor fall is the planned slope of the floor in a shower without a tray. Because there is no factory-made tray, the slope is made on site. It goes into the screed or into slope boards under the waterproofing. The same floor carries the drain, the tile adhesive and the tiles, so every layer follows the same slope. See wet room shower for the complete level-access arrangement.

How much fall does a shower floor need?

In its installation notes for the shower profile, TECE recommends a fall of at least 1 percent for the floor of a shower. It says a fall of 1 to 2 percent is usual. At 1 percent the floor drops about 1 cm per metre, and at 2 percent about 2 cm per metre. If the water runs 1.2 m to the drain, that is a height difference of 1.2 cm to 2.4 cm.

FallDrop over 1.0 mDrop over 1.2 m
1 percent (minimum)1.0 cm1.2 cm
2 percent (upper end of the usual range)2.0 cm2.4 cm

The drop values in the table are simple arithmetic on the fall percentage. The percentages come from the TECE text named in the references. They are a maker's recommendation, not a figure from a Slovak act.

Where is the fall formed, in the screed or in the adhesive?

Form the fall in the screed or in slope boards, and lay the waterproofing on top of it. A fall made only in the tile adhesive is a weak design. Water that passes the joints would stand on flat waterproofing and keep the adhesive wet. This is design advice drawn from how the layers are built up, not a figure from a regulation.

How does the drain type change the floor fall?

The drain type decides the shape of the slope. A point drain needs a fall toward the grate from all sides. The floor is built as several sloping planes that meet at the outlet. A linear channel collects water along its whole length, so one sloping plane is enough. A wall drain leaves the floor without a grate at all.

Drain typeHow the floor fallsWhat the sources say
Point floor drainFrom all sides toward the grateGeberit: the 80 × 80 mm grate has adjustable height, offset and tilt, and the drain suits the simplest installation and the lowest price
Linear channelOne plane toward the channelGeberit CleanLine channels are cut to length on site and sit in the centre of the shower or at the wall. TECE does not recommend its shower profile at the transition between shower and dry area
Wall drainOne plane toward the wallGeberit: part of the pre-wall system, floor without a grate, suited to new builds, renovations and tight spaces

TECE says its shower profile can sit at the wall or away from it. Whichever drain you choose, plan the slope before the screed is poured. See floor drain and shower channel drain for the drains themselves.

How much height does the drain need under the floor?

A drain needs room underneath for its trap and for the waste pipe, which also needs a fall. TECE gives its flat shower-profile drain a minimum build-up height of 65 mm. It measures from the underside of the drain to the top of the screed. The version with a 50 mm water seal needs 95 mm. Geberit supplies the trap of its CleanLine channels for installation heights of at least 6.5 cm or at least 9 cm. The tiles with adhesive and the fall come on top.

In a new build, plan this height into the floor build-up before the screed is poured. In a renovation the existing slab and floor set the height. If the space is too small, a wall drain is one option, because its pipe runs into the pre-wall and not into the screed.

How is a shower floor fall different from a shower tray?

A shower tray is a finished, waterproof part with its fall made in the factory. A tray-free shower floor gets its fall on site from the screed layer. A tray does not always mean a step. Geberit shows its Setaplano tray installed level with the floor. Its Olona tray can sit level with the floor or 4 cm above it. Both forms need a drain and a sealed connection to the waterproofing.

The floor of a tray-free shower takes more water than a bathroom floor with a drain alone, so the waterproofing class matters. TECE summarises the German standard DIN 18534-1. It puts bathroom floors with a drain into class W1-I (moderate exposure). It puts floors in rooms with a level-access shower into class W2-I (high exposure). The liquid applied waterproofing entry covers the membrane under the tiles.

Is there an upper limit for the fall in a barrier-free shower?

TECE summarises DIN 18040-2, the German standard for barrier-free housing. The standard asks for a shower place level with the adjoining floor, with a drop of at most 2 cm. The shower area may count as part of the movement area of the bathroom. This needs a level transition and a drainage fall of at most 2 percent. TECE gives the movement area as at least 1.20 × 1.20 m. For the wider design of such bathrooms see universal design and the walk-in shower screen entry.

What are the common mistakes with shower floor falls?

  • Fall made only in the adhesive. The slope belongs in the screed or slope boards, so the waterproofing sits on it.
  • A slope that runs the wrong way. Water must run toward the drain on every side that receives water, not away from it.
  • Drain height checked too late. If the trap and the waste pipe do not fit under the floor, the fall cannot be made in the planned build-up.
  • Substrate not suited to wet use. TECE notes that DIN 18534-1 allows only moisture-insensitive substrates in classes W2-I and W3-I. These are mostly cement-based, such as concrete, cement screed or fibre-cement boards.

Which standard covers the waterproofing under the fall?

STN EN 14891 covers liquid-applied waterproofing products under ceramic tiling bonded with adhesives. The Slovak standards catalogue at normoff.gov.sk lists it as valid with a release date of 1 August 2017. The standard sets requirements for the products. It does not set the fall, so the slope figures in this article come from the manufacturer guidance named in the references.

Where do the figures in this article come from?

The fall percentages, the build-up heights and the 2 percent condition come from the TECEdrainprofile technical information. It summarises the German standards DIN 18534 and DIN 18040-2. The trap heights, the grate size and the tray installation options come from the Geberit shower brochure. These are manufacturer and standard summaries, not Slovak regulations. Check the current standard and the data sheet of your product before you design a specific floor.

Frequently asked questions

What fall does a shower floor need?
TECE recommends at least 1 percent in its installation notes for the shower profile, and says 1 to 2 percent is usual. That is about 1 to 2 cm of drop per metre of floor length.
Should the shower floor fall be made in the screed or the tile adhesive?
The fall belongs in the screed or in slope boards, with the waterproofing laid on top. A fall made only in the adhesive leaves the waterproofing flat, so water that passes the joints would stand on it.
Does a point drain need a fall from all sides?
Yes, a point drain needs the floor to slope toward the grate from every side. The floor is built as several sloping planes that meet at the outlet.
How much height does a shower drain need under the floor?
Geberit gives trap heights of at least 6.5 cm or at least 9 cm for its CleanLine channels. For its flat shower-profile drain TECE gives 65 mm, and for the version with a 50 mm water seal 95 mm. TECE measures from the underside of the drain to the top of the screed.
Is the 2 percent figure for shower floors a Slovak legal rule?
No. It comes from TECE's summary of the German standard DIN 18040-2 for barrier-free housing. There the shower area counts as part of the movement area if the transition is level and the fall is at most 2 percent. Check the current standard and the Slovak requirements before you rely on it.
Is a shower tray better than a tray-free shower floor?
Neither is better in general. A tray has its fall made in the factory, while a tray-free floor gets its fall on site. Geberit shows trays that can be installed level with the floor, so a step is not always the difference.

Sources

  1. TECEdrainprofile, Technische Informationen · TECE GmbH · Planung, Wassereinwirkungsklassen DIN 18534-1 (p. 1-6); Böden und Wandflächen (p. 1-7); Barrierefreie Badgestaltung, DIN 18040-2 (p. 1-9); Duschprofil Position und Gefälleausführung (p. 1-10); Ablauf flach und Ablauf Norm
  2. Sprchy v úrovni podlahy a vane: šikovné riešenia pre lepšie kúpeľne (2023) · Geberit Slovensko · Setaplano; CleanLine shower channels; wall drain; floor drain
  3. STN EN 14891: Liquid applied water impermeable products for use beneath ceramic tiling bonded with adhesives · ÚNMS SR (Úrad pre normalizáciu, metrológiu a skúšobníctvo SR), normoff.gov.sk · Catalogue entry: validity, release date, English title