Walk-in shower screen
A walk-in shower screen is a fixed glass panel with no door. It closes one open side of a shower and is fixed to the wall or pre-wall.
A walk-in shower screen (sprchová stena walk-in) is a fixed glass panel with no door. It closes the open side of a shower, or stands beside a tray-free floor, and separates the shower area from the rest of the bathroom. Because it does not move, there is no door track or hinge to maintain, and the glass and its fixings do all the work.
What is the difference between a walk-in screen and a shower enclosure?
A screen is a single fixed panel, while an enclosure has one or more doors that slide, hinge or fold. The table below sets the two side by side, using Geberit's own product data for both.
| Feature | Geberit Walk-in, fixed wall | Geberit GEO enclosure with doors |
|---|---|---|
| Glass | 8 mm safety glass | 6 mm safety glass |
| Opening | No door, the panel is fixed | Sliding, pivot or folding doors |
| Fittings | Anchored in the pre-wall without visible fittings | Handle integrated in the profile |
| Moving parts | None | Sliding doors run on a double-track mechanism |
| Where it fits | Separates the shower area from the rest of the bathroom, supplied in several sizes | Square and quarter-round enclosures, and niche showers with pivot, sliding or folding doors |
Choose a screen when the shower should look open and the floor and drain are planned as one surface. Choose an enclosure with doors when you want the spray kept inside a closed box, for example in a small niche.
Why is a walk-in screen made of safety glass?
Walk-in screens are made from toughened safety glass, also called tempered glass. The GGF data sheet 4.4 incorporates the British standard BS EN 12150. It says the strength of toughened glass can in general rise to four to five times that of annealed glass of equal thickness. General Glass gives the lower figure, up to four times. When you compare offers, use the lower figure. The data sheet also says the toughening process does not raise the surface's resistance to scratching or abrasion.
| Property | Annealed glass of the same thickness | Toughened safety glass, per the sources |
|---|---|---|
| Strength | Baseline | Up to four to five times as strong (GGF 4.4); up to four times (General Glass) |
| Breakage | Sharp, jagged shards (the contrast General Glass draws) | Small, generally blunt fragments |
| Cutting after manufacture | Not covered by the sources read | Cannot be cut or drilled after toughening (GGF 4.4) |
| Scratch and abrasion resistance | Not covered by the sources read | Not increased by toughening (GGF 4.4) |
Geberit describes its glass as safety glass, and gives 8 mm for the Walk-in screen and 6 mm for its GEO enclosures with doors. These are the thicknesses in Geberit's own range. A larger panel or a different maker can need a different thickness, so take the figure from the data sheet of the product you buy.
What happens when toughened glass breaks?
Toughened glass breaks differently from ordinary glass. The GGF data sheet says that in the event of breakage it fractures into numerous small pieces, the edges of which are generally blunt. General Glass describes the same pattern: small, blunt fragments rather than sharp, jagged shards. It adds that this lowers the chance of serious injury compared with annealed glass.
The pattern is a safety property, not a guarantee that the panel stays whole. The GGF data sheet says the edges of toughened glass are as vulnerable as the edges of any glass. Protect the edges when you handle and fit the panel. Treat any crack as a reason to replace the panel.
Can the glass be cut or drilled on site?
No. The GGF data sheet says toughened safety glass cannot be cut or drilled, and should not be surface or edge worked. All edgework, drilling and surface treatment are done before toughening, so the panel is ordered to its final size. For a retrofit, ask the glazier to measure the opening from the installed frame or the finished wall, not from the drawing. A panel that is too large or too small cannot be fixed by trimming it.
How is a walk-in screen fixed to the wall?
Geberit fixes its Walk-in screen in the pre-wall, the installation frame that also takes the niche storage box. The brochure states that the screen is anchored in the pre-wall without visible fittings. It adds that pre-wall mounting lets the glass panel slide by up to 5 cm. A related pre-wall device is the concealed cistern frame for a wall-hung WC. Because the screen is part of the pre-wall planning, its position is set before the tiler starts.
A screen fixed to a finished wall needs its own anchors. Those anchors pass through the wall and the tile, so agree the fixing points with the glazier and the tiler before the wall is tiled.
Does a screen keep the rest of the bathroom dry?
Plan the screen as a control for splashes, not as waterproofing. The German standard DIN 18534-1 sorts surfaces into water exposure classes. TECE, a drain maker, quotes in its technical information that floors in rooms with a level-access shower belong to class W2-I (high exposure). A note to the same table says it can be sensible to put neighbouring areas into the higher class. This applies when enough distance or a building measure, such as a shower screen, does not protect them. This is a German standard, not a Slovak regulation. The blog article on tray-free showers explains how the classes are used.
In practice, run the floor waterproofing past the screen line, so the wet zone outside the shower is sealed too. The fall in the shower runs toward the drain, and the screen line sits at the edge of that fall. The fall and the drain type are covered in the shower floor fall and floor drain entries. Choose the liquid-applied membrane or another system with the screen fixings in mind. Give the joints at the fixing points and the corners the same care as the rest of the wet zone.
How do you clean a walk-in screen and keep it clear?
Geberit describes its shower glass as safety glass with a special surface finish that is easy to keep clean. Its brochure says the Walk-in screen is anchored in the pre-wall without visible fittings, so it is very easy to clean. The perfectly smooth surface, the brochure says, lets water drops run off.
The finish does not make the glass scratch-proof. Toughening does not improve abrasion resistance. Use a soft cloth and a mild cleaner, avoid scouring pads and abrasive powders, and wipe the screen after use.
What do owners get wrong about walk-in screens?
- A screen is waterproofing. The glass controls splashes. The floor and the joints still need their own waterproofing.
- Toughened glass cannot break. It breaks into small, generally blunt fragments, but a cracked panel needs replacement.
- Any panel can be trimmed on site. Toughened glass is worked before toughening, so a panel that does not fit must be remade, not cut.
- Cleaning with a scourer is harmless. The surface does not gain scratch resistance from toughening, so abrasive pads leave marks.
Frequently asked questions
- Is a walk-in shower screen the same as a shower enclosure with doors?
- No. A walk-in screen is a fixed panel with no door, so it has no sliding track, hinges or handle to maintain. A shower enclosure has doors that move, which adds running gear. Both use safety glass, and the choice depends on how much of the shower needs to stay open.
- How thick is the glass in a walk-in shower screen?
- Geberit uses 8 mm safety glass for its Walk-in screen and 6 mm safety glass for its door enclosures. These are the manufacturer's figures for its own systems. Check the data sheet of the maker you choose and the size of your panel before you order.
- Is toughened glass stronger than ordinary glass in a shower?
- Yes. The GGF data sheet for toughened safety glass says it can be up to four to five times as strong as annealed glass. General Glass gives up to four times. When it breaks, it falls into small, blunt fragments rather than sharp shards.
- Can I clean a walk-in shower screen with an abrasive cleaner?
- Avoid abrasive cleaners and scouring pads. The toughening process does not improve the glass's resistance to scratching or abrasion, so the surface marks easily. Use a soft cloth and a mild cleaner, and wipe the screen after use.
- What should I do if the screen cracks?
- Replace the panel rather than patch it. The GGF data sheet says toughened glass cannot be cut or drilled after toughening, so a replacement is ordered to the exact size. Ask the glazier to measure the opening from the installed frame, not from the drawing.
Sources
- Geberit: Sprchové riešenia, brožúra B2B (2023), sprchové kúty GEO a sprchová stena Walk-in · Geberit · Pages 24 to 27: Geberit GEO shower solutions and the Walk-in recessed box and shower wall
- General Glass: Tempered Glass · General Glass · Product page, strength and breakage paragraphs
- GGF Standard Data Sheet 4.4: Thermally Toughened Soda Lime Silicate Safety Glass for Building (October 2004) · Glass and Glazing Federation · Sections 1 (scope, BS EN 12150), 2.1.1 (strength, scratching), 2.1.3 (fracture), 2.1.5 (work on toughened glass)
- TECEdrainprofile, Technische Informationen (2019) · TECE · Table: Wassereinwirkungsklassen gemäß DIN 18534-1, class W2-I and footnote *