Epoxy grout
An epoxy grout is a reaction resin grout that fills the joints between ceramic tiles and is classed RG under the EN 13888 series.
What is epoxy grout?
Epoxy grout is a reaction resin grout. It fills the joints between ceramic tiles and belongs to the RG class in the EN 13888 series for grouts for ceramic tiles. The maker Mapei describes its epoxy grouts as two-component products based on epoxy resin that meet the RG requirements. The counterpart is the cementitious grout, which has a cement binder. Both fill the same joints, but the standard treats them as two families.
The contents of Part 1 in the Slovak catalogue list two families. They are cementové škárovacie malty (CG) and škárovacie malty na báze reaktívnych živíc (RG). In Slovak trade sheets you will meet the term epoxidová malta. The Ceresit CE 89 sheet is an example. It quotes its test values to the older EN 12808 series and prints no EN 13888 class. Ask the supplier for the class code instead of relying on the name on the bucket.
How does the standard classify tile grouts?
EN 13888 sorts tile grouts into two families. The cementitious family has two classes, CG1 and CG2. The reaction resin family has a single class, RG. The table shows how the Tile Association and Mapei describe each class.
| Class | Family | Name used in the guidance | How the guidance describes it |
|---|---|---|---|
| CG1 | Cementitious | Normal cementitious grout | Mapei: enough for ceramic or porcelain tiles that do not see large swings in temperature and humidity, in homes and shops |
| CG2 | Cementitious | Cementitious grout with improved performance | Mapei: copes with temperature swings, as on heated or exterior substrates, and works with deformable adhesives |
| RG | Reaction resin | Reaction resin grout | Mapei: two-component, epoxy resin-based products |
Mapei adds two optional letters for the cementitious classes. A means high abrasion resistance, and W means low water absorption. A Mapei grout sold as CG2WA carries both.
The series has two parts. Part 1 covers requirements, classification, designation, marking and labelling. It gives performance requirements for cementitious and reaction resin grouts. Part 2 covers the test methods. The catalogue lists the Part 2 methods as flexural and compressive strength, water absorption, shrinkage, abrasion resistance and chemical resistance. Neither part gives criteria or recommendations for the design and installation of tiling, so those stay with the designer and the supplier data.
What do the test results tell you about a grout?
A test method only gives a number. The value that matters is the one on the product data sheet, measured under the method the class refers to. As an example, the Ceresit CE 89 sheet gives water absorption of 0.1 g or less after 4 hours. It gives shrinkage of 1.5 mm/m or less. It gives flexural strength of 30 N/mm² or more after 28 days. Those values are for that product only.
In a wet room, read water absorption and chemical resistance first. They describe how much water the joint takes in and how it reacts to cleaning agents. Abrasion matters on a floor. Mapei links the W letter to continuous immersion and the A letter to heavy foot traffic.
Ask the supplier to name the EN 13888 class and to send the test results for the product, not a general brochure. A figure without its test method and date cannot be compared with another product.
How is epoxy grout different from cement grout?
The first difference is the binder. Cement grout takes its name from its cement binder, and epoxy grout from its resin. A CG1 or CG2 product belongs to the cement family. An RG product belongs to the resin family. Mapei says epoxy grouts offer high mechanical resistance and high resistance to aggressive chemicals.
| Question to ask | Cementitious grout (CG1, CG2) | Reaction resin grout (RG) |
|---|---|---|
| Binder | Cement | Epoxy resin, two components |
| EN 13888 class to ask for | CG1 or CG2, with A or W if needed | RG |
| Typical use in the Mapei guidance | CG1 for ordinary rooms. CG2 for temperature swings, heating and large formats | Hygienic surfaces, strength or chemical resistance needs, bathrooms and kitchens where full cleanability of joints matters |
| Working time | Read the data sheet of the product | CE 89: about 60 minutes at +18 to +23 °C. Read the sheet of your product |
The practical question is rarely which family is better in general. It is which product meets the results your room needs. Water, cleaning and wear decide the choice.
Where is epoxy grout a sensible choice?
The Ceresit CE 89 sheet lists bathrooms, showers, pools, kitchen worktops, balconies and terraces. It also states that the product suits contact with food. Mapei names bathrooms and kitchens in homes, where full cleanability of the joint matters. A shower floor, a wall behind a bath and a kitchen splashback are the usual cases.
The joint filler is only one layer of protection. The waterproofing sits under the tiles. The liquid-applied waterproofing or the sealing tape at the corners does the work that the grout cannot do. For demanding conditions the CE 89 sheet itself recommends an epoxy or other resin waterproofing under the tiles. For mosaics in pools it names waterproof membranes such as Ceresit CL 50. A floor drain and the fall of the floor decide where water goes, not the joint.
In a wet room the joint sees water from above and from the side. Check the product against the tile as well. The CE 89 sheet covers joints of 1 to 15 mm. Check that range against the joint you plan. This matters for a large-format tile.
What are the common misconceptions about epoxy grout?
The first misconception is that a resin grout makes a wet room waterproof. It limits how much water a joint takes in, but it does not replace the waterproofing layer under the tile. A leaking layer below the tile will still leak. The second is that the word epoxy on a bucket tells you the class. The class is the code on the data sheet, so read the sheet.
The third misconception is that a resin grout is always easy to finish. The CE 89 sheet gives a working time of about 60 minutes. It asks you to clean as soon as possible, while the product is still workable. It asks you to wipe the surface dry after washing. This reduces the risk of an epoxy haze on the tile. At +8 to +12 °C the sheet calls the product very thick and hard to work. The mixing ratio is fixed, so mix only the amount you can place in one batch.
How do you check an epoxy grout in Slovakia?
Start with the standard. The Slovak catalogue of ÚNMS lists STN EN 13888-1 and STN EN 13888-2 as valid. Both are in Slovak, date from 1 June 2023 and are identical with EN 13888:2022. They replace the editions of 1 January 2023, which the catalogue shows as withdrawn on 1 June 2023. Check the current edition in the catalogue before you quote it in a specification.
Then check the product. Ask for the data sheet, the EN 13888 class, the test results and the date they were measured. If the supplier can give those, you can compare two products on the same footing, whatever they are called in the shop.
Frequently asked questions
- Is epoxy grout the same as an RG grout?
- In the EN 13888 series, yes. RG is the reaction resin class, and the maker Mapei classes its epoxy grouts as RG. Some data sheets, such as Ceresit CE 89, print no class code, so ask the supplier for it.
- Is epoxy grout the same as cement grout?
- No. Cement grout belongs to the cementitious family, class CG1 or CG2, and epoxy grout belongs to the reaction resin family, class RG. The binders differ, so compare the data sheet of each product.
- Which standard covers grouts for ceramic tiles?
- The EN 13888 series. Part 1 covers requirements, classification, designation, marking and labelling, and Part 2 covers test methods. The Slovak catalogue of ÚNMS lists the STN EN 13888 editions dated June 2023 as valid.
- Does epoxy grout make a shower waterproof?
- No. The grout limits water absorption in the joint, but the waterproofing layer under the tile does the protecting. Keep the waterproofing and the drain design separate from the choice of grout.
- What should I ask a supplier before buying epoxy grout?
- Ask for the EN 13888 class and the data sheet. Ask for the test results for water absorption, chemical resistance and abrasion, and for the date of the test. A figure without its test method and date cannot be compared with another product.
- How long does epoxy grout stay workable?
- It depends on the product. The Ceresit CE 89 sheet gives about 60 minutes at +18 to +23 °C. The product can be walked on after 24 hours and resists chemicals after 5 days at +23 °C.
Sources
- STN EN 13888-1 Škárovacie látky na keramické obkladové prvky. Časť 1: Požiadavky, klasifikácia, označenie, označovanie a etiketovanie (Grouts for ceramic tiles. Part 1) · ÚNMS SR, Normoff catalogue · Catalogue entry, scope, contents (4.1 CG, 4.2 RG, 5 classification) and status
- STN EN 13888-2 Škárovacie látky na keramické obkladové prvky. Časť 2: Skúšobné metódy (Grouts for ceramic tiles. Part 2: Test methods) · ÚNMS SR, Normoff catalogue · Catalogue entry, scope and status
- Tiling Guide, classification of tile adhesives and grouts (page 9) · The Tile Association (TTA) · Page 9, grout classification
- Grouts and sealants for installing ceramic tiles and stone material · Mapei S.p.A. · Classification of mortars for grouting according to EN 13888 (p. 6); Epoxy grouting mortars
- Ceresit CE 89 Ultraepoxy Premium, dvojzložková epoxidová chemicky odolná malta, technický list · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Spracovanie; Neprehliadnite; Technické údaje (TDS 05/2021)