Large-format tile
A large-format tile is a big porcelain tile or slab that needs a flat substrate, full adhesive coverage and tight lippage control.
What is a large-format tile?
A large-format tile is a porcelain tile or slab that is big compared with the tiles an installer normally lays by hand. The term is a trade description. None of the sources read for this entry fixes a size at which a tile becomes large. Crossville, a porcelain manufacturer, gives extra installation steps for its 48 x 48 in tile, which is about 1.2 m square. Those steps cover the substrate, the adhesive and the joint.
Large units are one option for wet rooms, where the wet-room shower puts the floor under water and fall.
Why does substrate flatness matter for large tiles?
A flat base is the first requirement. For its 48 x 48 in tile, Crossville asks installers to check the surface before tiling. It says you must remove irregularities greater than 3 mm over 3 m, or more than 1.6 mm over 0.6 m, from the required plane.
| Check | Crossville guidance for its 48 x 48 in tile |
|---|---|
| Flatness over a long span | Irregularity greater than 3 mm over 3 m must be removed before installation |
| Flatness over a short span | Irregularity more than 1.6 mm over 0.6 m from the required plane must be removed |
| Substrate type | Clean, dry, flat, sound base: exterior grade plywood, cement backer board, concrete or mortar bed |
On a shower floor, plan the fall in the screed, not in the adhesive. The blog article on tray-free showers gives the TECE fall of at least 1 %. The shower floor fall entry covers it, so settle it before you order the tile.
How much adhesive coverage does a large tile need?
Crossville says to ensure adequate mortar coverage under the tiles. For its 48 x 48 in tile it asks for double-spreading, also called notched back-troweling. You comb mortar onto the substrate and then onto the back of the tile, and the ridges on both run in parallel directions. For a rectangular tile, Crossville says to comb the back perpendicular to the long side and the substrate in a parallel direction. Opposite directions trap air in the cross-hatched grid.
The same guidance asks for a notched trowel with a notch of at least 10 mm. It says to use a larger notch where needed for the maximum coverage under ANSI A108. Crossville adds that the open time of mortars may be only a few minutes. It recommends areas of no more than 1.5 m2 at a time, so the mortar does not skin over.
Check coverage as you work. Lift a tile now and then and see how much of its back the mortar wets.
What does the waterproofing under a shower floor need to do?
On a shower floor the waterproofing sits between the screed and the tile. The numbers below come from the Ceresit CL 50 datasheet, dated 09/2015.
| Item | Value from the CL 50 datasheet | What it means on site |
|---|---|---|
| Coats | At least two coats, each not over 1 mm, the second crosswise to the first | The second coat goes on once the first has hardened and changed colour |
| Crack bridging | Substrate cracks up to 2.5 mm | Cracks in the substrate up to this width |
| Time to tiling | About 5 hours after the last coat | Plan the tiling day around the cure |
| Joints | Sealing tape in movement and transition joints | Lay the tape in the fresh first coat and cover it with the second coat |
Which adhesive standard applies to large-format tiles?
The adhesive standard is EN 12004. The Slovak adoption is STN EN 12004-1:2017, Adhesives for ceramic tiles, Part 1: Requirements, assessment and verification of constancy of performance, classification and marking. It replaced STN EN 12004+A1 of December 2012 from 30 November 2018. Its scope covers three types of adhesive, for walls and floors. Cementitious adhesives are for internal and external tiling. Dispersion and reaction-resin adhesives are for internal tiling.
The standard does not give criteria or recommendations for the design and installation of tiles. Follow the installation method on the adhesive and tile datasheets. The CL 50 datasheet names adhesives of class C2 or R2 for tiling over its layer. It refers to the 2012 edition of the standard, so check the current datasheet of the product you buy.
For a shower floor the waterproofing product is a separate choice. The CL 50 datasheet describes a cement-based two-component layer for areas with floor drains. Sealing tape goes into the movement and connection joints, as set out in the liquid-applied waterproofing entry and the waterproofing sealing tape entry.
How do you control lippage on large tiles?
Lippage is the step where one tile edge sits higher than its neighbour. On a shower floor, keep the tile faces level so water can run to the drain. For its 48 x 48 in tile, Crossville asks installers to use lippage control devices spaced as the manufacturer directs.
Crossville also states a minimum grout joint width of 3 mm. A narrower joint is outside its guidance.
- Level before tiling. A flat base removes much of the step before it starts.
- Use lippage control devices. Follow the spacing in the manufacturer's directions.
- Keep the joint at or above the minimum. Read the minimum from the tile maker's instructions.
How is a large-format tile different from microcement?
A large-format tile is a discrete unit with joints between units. Microcement has its own entry, which describes the material and its application. For either surface, plan a flat, sound base with the fall set in advance.
Frequently asked questions
- What size is a large-format tile?
- None of the sources read fixes a size. The term is a trade description. Crossville gives extra installation steps for its 48 x 48 in porcelain tile. That tile is about 1.2 m square.
- How flat does the floor have to be before laying large porcelain tiles?
- Crossville asks you to remove irregularities over 3 mm in 3 m, or over 1.6 mm in 0.6 m. This is for its 48 x 48 in tile. Check the base with a straightedge across its full span before you mix the adhesive.
- What trowel should I use for large porcelain tiles?
- For its 48 x 48 in tile, Crossville recommends a notched trowel with a notch of at least 10 mm. It says to use a larger notch where the coverage under ANSI A108 needs it. Combine it with double-spreading, so you coat both the base and the back of the tile.
- Why does lippage matter on a shower floor?
- Lippage is a raised tile edge. Keep the tile faces level so water can run to the drain. Use lippage control devices while you set the tile, and keep the grout joint at or above the minimum width the manufacturer gives.
- Can large-format tiles go on a shower floor without a separate waterproofing layer?
- No. The Ceresit CL 50 datasheet recommends its waterproofing for areas with floor drains and calls for sealing tape in movement and connection joints. Follow the datasheet of the waterproofing product you choose.
Sources
- General Installation Guidelines (formerly Installation Instructions Porcelain), edited 27 July 2022 · Crossville, Inc. · Installation Procedures (substrate); Additional Installation Procedures for 48 x 48 in size
- STN EN 12004-1: Adhesives for ceramic tiles, Part 1: Requirements, assessment and verification of constancy of performance, classification and marking (EN 12004-1:2017) · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), via normy.normoff.gov.sk · Title page; clause 1 Scope
- Ceresit CL 50 Express 2-K, dvojzložková elastická hydroizolácia pod obklady a dlažbu, technický list (09/2015) · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Spracovanie; Technické údaje
- TECEdrainprofile, Technische Informationen (2019) · TECE · Duschprofil Position und Gefälleausführung