Tray-Free Shower: Floor Fall and Sealing

7 min read
Illustration of a bathroom under renovation before tiling: a level-access shower area coated in grey liquid waterproofing, white sealing tape in the corners and a linear drain set into a sloped screed

How does a tray-free shower differ from a shower with a tray?

A shower tray is a finished waterproof part with a fall made in the factory. In a tray-free shower the building has to do the same job. It needs a screed laid to a fall, waterproofing under the tiles, a drain set into the floor and tiles that the water runs over. The plumber, the screed layer and the tiler all work on these layers, so agree beforehand who is responsible for which layer, because water finds every gap between their work.

The difference is also in how much water the floor has to take. The German standard DIN 18534-1 for indoor waterproofing puts surfaces into classes by water exposure. The technical information from the maker TECE quotes it: floors in domestic bathrooms with a drain are class W1-I (moderate exposure). Floors in rooms with a level-access shower are class W2-I (high exposure) because water sometimes stands on them. It is a German standard, not a Slovak regulation. TECE designs the connection of its drains to the waterproofing to it, so this text uses it as the yardstick.

The choice of floor materials for the whole house is covered in Floors: wood, vinyl, microcement and other materials.

What fall does the floor of a tray-free shower need?

TECE states in its technical information that the shower floor fall should be at least 1 %, and it usually recommends 1 to 2 %. At 1 % the floor drops 1 cm for every metre of length, at 2 % it drops 2 cm. In a shower 1.2 m deep that is a difference of 1.2 to 2.4 cm between the highest point and the drain.

The fall belongs in the screed or in slope boards, not in the tile adhesive. The waterproofing lies on the screed. If the fall were only made in the adhesive, water that gets through the joints would stand on flat waterproofing and the adhesive would stay wet.

In a barrier-free bathroom the fall also has an upper limit, given in the question on dimensions at the end of the article.

Linear drain, point drain or wall drain?

The drain type decides how the floor is sloped. A floor drain with a point grate needs a fall from all sides, so the floor is made of several sloping planes that meet at the outlet. A shower channel drain collects water along its whole length, so one sloping plane is enough. A wall drain leaves the floor with no grate at all.

Drain typeFloor fallMaker's dataWhere it fits
Point floor drainFrom all sides to the outletGeberit: 80 × 80 mm grate, height, offset and tilt of the grate adjustableAccording to Geberit, where the simplest installation and the lowest price matter most
Linear channel drainOne plane to the channelGeberit CleanLine: cut to length on site, in the middle of the shower or at the wall, sealing foil fitted at the factoryA shower where the floor should fall in one direction only
Shower profileOne plane to the profileTECEdrainprofile: minimum build-up height 65 mm, flow at least 0.46 or 0.53 l/s at 10 or 20 mm headAt the wall or away from it. TECE does not recommend it at the transition between the shower and the dry area
Wall drainOne plane to the wallGeberit: part of the pre-wall system, floor without a grateAccording to Geberit, new builds, renovations and tight spaces

A wall drain is part of the pre-wall installation, the same structure that holds a concealed cistern frame for a wall-hung WC. Geberit points out that the pipes run in the wall, so the plumber's work is clearly separated from the screed layer's and the tiler's.

How much floor height is needed, and can the floor be lowered?

A drain needs room underneath for the trap and for the waste pipe, which also needs a fall. For its profile TECE gives a minimum build-up height of 65 mm from the bottom of the drain to the top of the screed. Geberit supplies a trap for its CleanLine channels in two installation heights, at least 6.5 cm or at least 9 cm. It also supplies an installation set with a vertical outlet through the slab for floor thicknesses up to 25 cm. The tiles with adhesive and the fall over the whole shower length come on top.

In a new build this height is planned into the floor build-up before the screed is poured. In a renovation the height is set by the existing slab and floor. If it is not enough, there are three options:

  • Raise the whole bathroom floor. The shower stays level with the bathroom floor and the step moves to the door.
  • Choose a wall drain. The pipe leaves into the pre-wall, not into the screed.
  • Lower the floor. This is work on the slab structure, so ask a structural engineer, not the tiler. A vertical outlet through the slab affects the room below the bathroom.

Which waterproofing belongs under shower tiles?

Waterproofing under tiles is either applied as a liquid coating or bonded as a sheet or board. Liquid-applied waterproofing under ceramic tiles bonded with adhesives is covered by STN EN 14891, which the Slovak standards office ÚNMS SR issued in August 2017 and lists as valid. According to TECE, DIN 18534 then sets which type of waterproofing may go into which class. An overview from the TECE technical information and the Ceresit data sheets:

SystemFloor in class W2-IExample from a data sheet
Polymer dispersionNo. In class W2-I only on walls. On floors up to class W1-ICeresit CL 51: at least 2 coats, about 1.0 mm in total. For shower floors with a recessed channel the maker recommends CL 50
Crack-bridging mineral slurryYes, in all classesCeresit CL 50: two-component, class CMO2P to EN 14891, bridges cracks in the substrate up to 2.5 mm wide
Reaction resinYes, in all classesCeresit recommends epoxy or other resin waterproofing under tiles in demanding conditions, for example spas and battery rooms
Sheet bonded with the tilesYes, W0-I to W2-I under DIN 18534-5, without high mechanical loadA PP, PE or TPE film with fleece on both sides that holds the adhesive
Board with waterproofingYes, W0-I to W2-I under DIN 18534-6, without high mechanical loadAn EPS or XPS carrier board with waterproofing applied in the factory

The substrate matters just as much. According to TECE, DIN 18534-1 allows only moisture-resistant substrates in classes W2-I and W3-I, such as concrete, cement screed or fibre-cement boards. A screed bound with calcium sulphate, that is an anhydrite screed, does not belong under a tray-free shower floor.

How are corners, penetrations and the drain joint sealed?

The coating alone is not enough in the corner between wall and floor or at the drain, because two structures move against each other there. Ceresit's data sheets for both CL 50 and CL 51 therefore require a sealing tape in movement and connection joints. The CL 152 tape is 120 mm wide. It is pressed into the fresh first coat and covered with the second. At a movement joint it is formed into a loop in the corner, which takes up movement of the substrate better.

The most sensitive point is the joint between the waterproofing and the drain. Geberit supplies its CleanLine channels with sealing foil fitted at the factory. TECE supplies a sealing collar with its drains and a list of waterproofing products with which the independent test institute KIWA TBU tested the joint. It is therefore sensible to combine a drain and a waterproofing product that the drain maker lists as a tested pair.

Which tiles and grout suit a shower?

Shower tiles are used wet and barefoot, so they should resist slipping. For a barrier-free shower TECE gives slip-resistant flooring of at least assessment group B, by analogy with the German rule GUV-I 8527. Geberit describes class C to EN 16165 as the best slip-resistance class for its Setaplano and Sestra trays. For tiles, look in the data sheet for the barefoot test and its group or class.

Large-format tiles suit a channel drain or a wall drain best, where the floor falls in one direction. With a point drain the floor breaks into several planes, and a large tile would have to be cut along every edge of the fall.

Grout does not replace waterproofing. Ceresit states that its flexible cement grout CE 40 must not be used where watertightness and chemical resistance are required. It also bans it in wall corners and at wall-to-floor transitions. For joints around sanitary ceramics Ceresit recommends sanitary silicone CS 25, like the joint between worktop and splashback in the article on the kitchen worktop. The maker specifies epoxy grout Ceresit CE 89 also for bathrooms and showers, for joints 1 to 15 mm wide. At 18 to 23 °C it can be walked on after 24 hours and is chemically resistant after 5 days.

Where does the wet zone end, and which screen to choose?

Without a tray there is no clear line for where water splashes. According to TECE, DIN 18534-1 allows neighbouring surfaces that are not protected by enough distance or by a building measure, such as a screen, to be put into the higher class too. That is why it makes sense to plan the floor waterproofing across the whole bathroom, or at least well beyond the edge of the shower.

A walk-in screen is a fixed glass panel without a door. Geberit supplies it in the GEO range in 8 mm safety glass, while enclosures with doors have 6 mm glass. Its separate Geberit Walk-in shower panel is anchored into the pre-wall without visible fittings.

Which mistakes should you watch for?

  • Too little fall, or fall made in the adhesive. TECE gives 1 % as the minimum. A fall made only in the adhesive does not drain water from under the tiles.
  • Anhydrite screed under the shower. In class W2-I only a moisture-resistant substrate belongs under the waterproofing.
  • Dispersion coating on the shower floor. For floors with a recessed channel Ceresit recommends the two-component CL 50 instead of CL 51.
  • A corner without sealing tape, and cement grout in the corner, where Ceresit forbids CE 40.
  • Drain and waterproofing without a tested joint.
  • Floor height found out only when the drain is set. The drain, the fall and the floor build-up should be decided before the screed.

Frequently asked questions

How many coats of liquid waterproofing are needed?
At least two. For both CL 51 and CL 50, Ceresit requires at least two coats applied crosswise. For CL 51 each coat goes on after the previous one has dried, and the total should be about 1.0 mm. For CL 50 the second coat goes on after the first has hardened, and one coat should not exceed 1 mm.
How soon after waterproofing can you tile?
It depends on the product, often the same day. Ceresit gives tiling about 4 hours after the second coat of CL 51. For CL 50 it gives about 5 hours after the last coat, with a class C2 or R2 adhesive to STN EN 12004. The times apply at room temperature. Cold makes them longer.
What flow rate must a shower drain have?
At least what EN 1253 sets for the outlet size. According to the extract of the standard in TECE's technical information, for floor drains this is 0.6 l/s for DN 40 and 0.8 l/s for DN 50. The figure for a specific drain is in its data sheet.
What load class should a shower drain grate have?
For a flat bathroom TECE gives class K3. According to TECE, EN 1253-1 gives class K3 a test load of 3 kN and assigns it to areas without vehicle traffic, such as bathrooms in flats. The lower class H 1.5 is for areas where no load is expected. Choosing the class is the designer's task, and when in doubt the higher class is chosen.
Can a tray-free shower be combined with underfloor heating?
Yes, the makers allow for it. Ceresit specifies the CL 50 coating for cement screeds with underfloor heating too, and the CE 89 epoxy for heated substrates. For CL 50 it says to switch the heating on no sooner than 7 days after the waterproofing is applied.
How much space does a barrier-free walk-in shower need?
Under the German standard DIN 18040-2, as quoted by TECE, a clear area of at least 1.20 × 1.20 m, or 1.50 × 1.50 m in a wheelchair-accessible flat. The shower area counts towards it if the shower has no threshold and its fall is at most 2 %. The floor should drop by at most 2 cm. Slovak requirements for barrier-free buildings need to be checked separately.

Sources

  1. TECEdrainprofile, Technische Informationen · TECE GmbH · Planung, Abdichtung (pp. 1-5 to 1-9); Duschprofil Position und Gefälleausführung (p. 1-10); product data; status December 2019
  2. Sprchy v úrovni podlahy a vane: šikovné riešenia pre lepšie kúpeľne (2023) · Geberit Slovensko · Setaplano, Sestra; CleanLine shower channels; wall drain; floor drain; GEO enclosures and Walk-in panel
  3. Ceresit CL 51 Express 1-K, jednozložková hydroizolácia, technický list · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Spracovanie; Technické údaje; valid from 05/2023
  4. Ceresit CL 50 Express 2-K, dvojzložková elastická hydroizolácia pod obklady a dlažbu, technický list · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Príprava podkladu; Spracovanie; Technické údaje; CE marking EN 14891
  5. Ceresit CL 152 Izolačný pás, technický list · Henkel Slovensko, spol. s r.o. · Spracovanie; Technické údaje
  6. Ceresit CE 40 Aquastatic, flexibilná škárovacia hmota, technický list · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Neprehliadnite
  7. Ceresit CE 89 Ultraepoxy Premium, technický list · Henkel Slovensko, spol. s r.o. · Oblasti použitia; Spracovanie; version 05/2021
  8. STN EN 14891 Tekuté hydroizolačné membrány na použitie pod keramické obkladové prvky · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR · Catalogue entry

Topic

  • Interiors