Change of Use of a Structure
A change of use (zmena v užívaní stavby) is a change of the main purpose of a structure. It needs a decision of the building office.
What is a change of use of a structure?
A change of use (zmena v užívaní stavby) is a change in the way people mainly use a structure. The law counts two more changes. One is a change of the technical operating parameters that changes the impact on the surroundings, fire safety or safety of use. The other is a change from a temporary to a permanent structure (§ 68 ods. 1 of zákon č. 25/2025 Z. z., see the Building Act).
The reason is the occupancy certificate (kolaudačné osvedčenie). It certifies that the structure is technically fit for its designed purpose (§ 67 ods. 2). The owner may use the structure only for the purpose that the certificate names (§ 68 ods. 1).
When does a change of use need a decision?
The building office must decide on a change in the use of the structure or in its operating equipment. It must also decide on a change in the way of production. The same holds for a substantial extension of production or of activities that could endanger life, health or the environment (§ 68 ods. 2).
Changing the use of single rooms is not a change of use. Two conditions must hold. The original function of the structure stays, and fire safety is not worse (§ 68 ods. 1). A home office in a spare bedroom of a house is an example, if fire safety stays the same.
When the case is unclear, ask the building office before you plan the works.
Which procedure applies when building work comes with the change?
The procedure depends on the work that comes with the change (§ 68 ods. 3 and § 66 ods. 1).
| Situation | Procedure in the text valid on 1 November 2026 | Source |
|---|---|---|
| The change needs no building work | The office decides on the change of use | § 68 ods. 2 |
| The change comes with a change of a completed structure, for example an extension or an added floor | The office discusses the change in the building intent proceedings and verifies the project. After the works it does the kolaudácia of the changed structure | § 68 ods. 3 |
| The change comes with alterations (stavebné úpravy) that needed a notification | The office discusses the change after the works end. The alteration alone would need no kolaudácia, but with the change it does | § 68 ods. 3, § 66 ods. 1 |
An attic turned into a flat inside the existing roof is an insertion (vstavba, § 5 ods. 2). It changes a completed structure, so it falls in the second row. See structural alteration notification for the notified alterations.
How does the procedure work and what do I submit?
The provisions on kolaudácia and on the occupancy certificate apply by analogy (§ 68 ods. 4, § 66 and § 67). The builder files the application electronically on the prescribed form, with documentation from an authorised person (§ 50 ods. 1 and 2).
The attachments of a kolaudácia depend on the type of structure. They include the construction diary, the final statement of the site manager and the documentation of the structure as built (§ 66 ods. 2). The binding opinions of the affected authorities come before the application. An authority has 30 days, or 60 days for a complex structure (§ 21 ods. 9).
The general decision deadline applies: 30 days on the papers, 60 days with a hearing or inspection (§ 58 ods. 1). The office rejects the change if it conflicts with the binding part of the spatial planning documentation (§ 68 ods. 5). See spatial planning act.
For a monument, or a structure in a heritage zone or its protection zone, the regional monuments office takes part. It acts as an affected authority (§ 32 ods. 12 of zákon 49/2002).
How much does a change of use cost?
The state fee for the decision is 30% of the rate for the same type of structure (položka 59 písm. e and a of zákon 145/1995). The rate is the fee for a decision on the building intent. For a single-flat or two-flat building the rate is 300 euro, so the fee calculates to 90 euro. This calculation is ours. The schedule prints only the percentage. The schedule is the version from 01.11.2026 to 30.11.2026.
Does a renovation of a house need a decision?
It depends on the work. A renovation is a set of alterations (stavebné úpravy, § 2 ods. 9). Section 18 ods. 2 requires a decision on the building intent for them, unless ods. 3 to 5 say otherwise.
- Repairs such as a new roof covering, a repaired facade or new windows need neither a decision nor a notification (§ 18 ods. 5 písm. a).
- Other alterations need a notification in the cases of § 18 ods. 3, for example closer than 2 m to the plot boundary or in a heritage zone.
- All other alterations need nothing (§ 18 ods. 5 písm. k).
A renovation that also changes the use of the structure needs the procedure above. See building permit for what replaced the old permit.
What happens if I change the use without a decision?
Changing the purpose or the operation of a structure without a decision of the building office is an offence. The fine for a natural person is 30 to 30,000 euro (§ 79 ods. 4 písm. b and ods. 6 písm. d, version 01.11.2025 to 31.12.2026).
What was the rule before 1 April 2025, and what changes in 2027?
The old act knew a permit for a change of the purpose of use (povolenie na zmenu účelu využívania stavby). Section 84 ods. 12 of zákon 25/2025 names it. Proceedings that the office began by 31 March 2025 finish under the old rules (§ 84 ods. 4).
A building without a permit may also lack an occupancy certificate. The old review of fitness for use stays open until 31 March 2029 for buildings that meet the old conditions (§ 84 ods. 7).
Amendment 243/2026 Z. z. rewrites § 68 from 1 January 2027.
| Point | Until 31 December 2026 | From 1 January 2027 |
|---|---|---|
| What counts | A change of the prevailing way of use | A change of the purpose of a structure or of a part of it |
| Single rooms or spaces | No change of use if the function of the structure stays and fire safety is not worse | No change of use for a non-residential space if purpose, floor area, impact on the surroundings and fire safety stay the same |
| Content of the decision | Not specified | States the new shares of floor area for the new purposes |
| Notified structures | Not specified | The owner notifies the change before it happens |
| Refusal | Conflict with the binding part of the spatial planning documentation | The same, and also a negative binding opinion |
Frequently asked questions
- What counts as a change of use in Slovakia?
- A change of use is a change in the way people mainly use a structure. It also covers a change of operating parameters that changes the impact on the surroundings, fire safety or safety of use (§ 68 ods. 1 of zákon 25/2025).
- When do I need a decision on a change of use?
- You need a decision when the use of the structure or its operating equipment changes. You also need one when production or activities that could endanger life, health or the environment change or grow substantially (§ 68 ods. 2 of zákon 25/2025).
- How do I change the use of a structure?
- Ask the building office for a decision on the change of use. The rules on kolaudácia apply by analogy (§ 68 ods. 4). If building work comes with the change, the office discusses it in the building intent proceedings (§ 68 ods. 3).
- Does a renovation of a house need a decision?
- Often not. Repairs such as a new roof covering or facade repair need neither a decision nor a notification (§ 18 ods. 5 písm. a of zákon 25/2025). Other alterations need a notification only in the cases of § 18 ods. 3.
- How much does a change of use cost?
- The state fee is 30% of the rate for the decision on the building intent for the same type of structure (položka 59 písm. e of zákon 145/1995, version 01.11.2026). For a single-flat or two-flat building that calculates to 90 euro.
- What happens if I change the use without a decision?
- It is an offence. The fine for a natural person is 30 to 30,000 euro (§ 79 ods. 4 písm. b and ods. 6 písm. d of zákon 25/2025, version to 31.12.2026). Amendment 243/2026 changes § 79 from 1 January 2027.
Sources
- Zákon č. 25/2025 Z. z. Stavebný zákon a o zmene a doplnení niektorých zákonov (Stavebný zákon) · Národná rada Slovenskej republiky, via Slov-Lex · § 2, 18, 21, 50, 58, 66, 67, 68, 79, 84
- Zákon č. 145/1995 Z. z. o správnych poplatkoch · Slov-Lex · položka 59 písm. a a e
- Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu · Slov-Lex · § 32 ods. 12
- Zákon č. 243/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 25/2025 Z. z. Stavebný zákon (promulgated 7 October 2026) · Národná rada Slovenskej republiky, via Slov-Lex