Interior Insulation: When and How

8 min read
Illustration: an old brick external wall being insulated from the inside with pale calcium silicate boards fixed with adhesive mortar, a deep window reveal, a bucket and a notched trowel

When does it make sense to insulate a house from the inside?

Internal insulation is chosen where external insulation is not possible. The Slovak Innovation and Energy Agency (SIEA) writes in its brochure on insulating family houses: insulating walls from the inside is often the only way to insulate historic and heritage-protected buildings. Internal insulation is therefore mainly an option in these cases:

  • The facade is protected. Before work on a cultural monument, the owner must ask the regional monuments office for a decision on the renovation plan. This also applies to work that needs no notification or permit under building rules (act 49/2002 Z. z., § 32(1) and (2)). For a house in a heritage area that is not itself a monument, the act requires a decision on the plan to alter the property (§ 32(5)).
  • The wall stands on the plot boundary. External insulation would reach onto the neighbour's land. Without an agreement with the neighbour, only the inside is left in practice.
  • It is a flat in an apartment building. The external walls and the facade are common parts of the building (act 182/1993 Z. z., § 2(1)(g)) and are co-owned by the flat owners (§ 19(1)). The owner of one flat does not decide on them alone.
  • Only one room is insulated, or a part of the house that is used differently from the rest.

Act 555/2005 Z. z. on the energy performance of buildings makes room for protected buildings. Its procedures and measures do not apply to buildings protected for their architectural or historical value where meeting the requirements would unacceptably change their character or appearance (§ 2(2)(a)). These include in particular national cultural monuments, buildings in a heritage reserve or zone, and buildings put into use before 1 January 1947 (§ 2(4)). The exemption does not ban insulation. From 1 January 2027 act 246/2026 Z. z. changes these paragraphs and adds a new § 4(3) for heritage-protected buildings. The heritage procedure is described in the post on renovating a house in a heritage zone.

What happens to a wall when you insulate it from the inside?

SIEA lists the drawbacks of internal insulation: a smaller room, moved installations, a wall exposed to the weather, possible vapour condensation and mould in the construction, thermal bridges at floors, partitions and openings, and lost heat storage capacity of the wall.

In an uninsulated wall, SIEA says, the freezing point (0 °C) lies within the masonry. With internal insulation it moves behind the inner face of the masonry, so in winter the whole masonry is on the cold side of the insulation. The insulation stops heat loss but does not protect the masonry against frost. The European research project RIBuild, which studied internal insulation of historic buildings, adds that after internal insulation the wall freezes more often, more intensely and deeper. It also dries inwards less well, especially with a vapour-tight system. Whether this causes damage depends on whether the brick or stone is sensitive to frost.

The second risk is interstitial condensation. Vapour from the warm room passes outwards through the wall. Where the temperature at the boundary between insulation and cold masonry falls below the dew point, the vapour turns into water. RIBuild points out that the condensation risk behind the insulation rises because less heat passes through the wall.

Why are timber beam ends sensitive?

In older houses the ends of timber floor beams rest directly in the external masonry, and their moisture follows the moisture of the wall. According to RIBuild, after internal insulation the temperature and heat flow in the wall fall. The moisture content of the wall, including the embedded timber, is expected to rise. Where there is rot, the same source says, the damaged timber has to be removed together with some sound timber as a safety zone. Where drawings are missing, RIBuild asks for an expert investigation of the beam ends. Ask for an opening-up survey of them. If they are damaged, put beam end repair into the project as the first step.

What internal insulation systems are there?

RIBuild groups systems by how they handle water vapour. A vapour-tight system keeps moist room air out of the insulation. A vapour-open system lets vapour in but carries moisture back towards the room.

GroupHow it worksExample materials per RIBuildWhat to watch
Vapour-tight insulation materialThe insulation itself stops vapourEPS, XPS, cellular glass, PURThe more vapour-tight the system, the more the joints and connections matter
Vapour-open insulation with a vapour barrierA foil on the warm side stops vapourMineral wool or cellulose with PE foilA broken or punctured foil greatly reduces the performance of the system
Capillary-active systemThe insulation carries moisture back to the room by capillary actionCalcium silicate, wood fibreboard, aerated concreteNeeds good contact with the wall, an air gap leads to condensation

Capillary-active insulation works differently from a foil. When the inner face of the wall gets wet, for example from condensation, the material carries the water through its capillaries towards the room, where it evaporates. RIBuild names the calcium silicate board as a material widely used in historic buildings. The system consists of the insulation, an adhesive mortar and a finishing plaster, and they are selected together. The adhesive mortar should have a higher vapour resistance and a lower liquid conductivity than the insulation. If an air gap remains between the masonry and the board, vapour condenses on the warm side of the wall. When choosing a specific mineral insulation board, ask for the technical data sheet of the whole system, not only of the board.

Mineral wool with a foil has an intermediate option. RIBuild writes that some countries, for example Switzerland, use mineral wool with a humidity-variable vapour retarder that changes its resistance with the humidity of the room air. RIBuild did not study this solution itself, so it has to be checked by calculation.

Insulating plaster is the thinnest solution. SIEA writes that, compared with insulation systems, insulating plasters do not substantially improve the thermal insulation of walls. It does not replace a system.

Why can the insulation thickness not simply be increased?

With internal insulation, moisture limits the thickness, because the thicker the insulation, the colder the masonry behind it. From case studies RIBuild concludes that the thinner the existing wall, the less insulation can be added without risk of damage. A thin wall increases both the condensation risk and the effect of driving rain.

The second limit is space. For old thick walls, SIEA warns that common materials would make the wall tens of centimetres thicker and worsen daylight. It recommends more expensive materials that work in a smaller thickness.

The third limit is the material. According to RIBuild, capillary-active insulation materials have a higher thermal conductivity than mineral wool.

When is internal insulation not recommended?

The table takes four rows from RIBuild Table 4-11, adapted from Steskens and co-authors (2013).

CriterionInternal insulation is applicableApplicability is unknownNot recommended
Solid masonry wall and rainAt least two bricks thick, or at most one and a half bricks with a small driving rain loadOne and a half bricks with a moderate or high rain loadAt most one brick thick with a moderate or high rain load
Floor constructionConcrete floor, or timber floor not connected to the facadeUndamaged timber floor connected to the facadeMoisture-damaged timber floor connected to the facade
InstallationsNo frost-sensitive pipes and no penetrations through the insulationNot stated in the tableWater pipes sensitive to frost or already frost-damaged
Indoor humidityClass 3 per EN ISO 13788Class 4, for example kitchens and canteensClass 5, for example laundries and swimming pools

According to RIBuild, the room air in winter should generally not exceed 50 % relative humidity. RIBuild also notes that a house becomes more airtight after internal insulation, at least in the window reveals, and the air change can fall below the required level. The options are described in the post Ventilation after new windows and insulation.

The condition of the facade matters too. The less driving rain reaches the wall, the more systems are possible. According to SIEA, wet masonry is usually caused by rainwater and ground moisture, so repair the roof and gutters first and lead rainwater away from the foundations.

How is internal insulation assessed by calculation?

Decree 364/2012 Z. z., Annex 1, includes in the thermal assessment the minimum internal surface temperature, the risk of mould growth, the dew point and the assessment of water vapour condensation in building constructions. The simplest tool is the Glaser method. RIBuild points out its limits. It assumes steady conditions and leaves out capillary suction, which takes place both in brick and in capillary-active insulation.

A hygrothermal simulation is more precise. It works with a changing climate and with material properties that change with moisture. RIBuild states that WUFI simulations can be done to EN 15026 as well. It also warns that a calculation for one square metre of wall leaves out thermal bridges, although they have a rather large effect with internal insulation. To check compliance with regulations, the thermal transmittance of the whole wall including thermal bridges has to be calculated.

Which details need attention?

The weakest points are thermal bridges. SIEA and RIBuild both name the junctions with partitions, floors and windows, where the insulation is interrupted and the risk of surface condensation rises. The CORNET IN2EuroBuild guide (TU Dresden, Fraunhofer IBP, Buildwise) gives a rough guide. Flank insulation at a partition is needed if the partition is thicker than half of the external wall. A third to half of the standard thickness is enough, usually over 30 to 40 cm. A calculation confirms it. More on details is in the post Thermal bridges in house renovation.

  • Window reveal. According to the CORNET IN2EuroBuild guide, about half of the standard thickness is often enough in the reveal. A typical weak point is the joint between the masonry and the window frame, where the insulation should continue without a break.
  • Sockets and switches. RIBuild recommends removing everything fixed to the wall before installation: sockets, switches, curtain rails and radiators. In a vapour-tight system every penetration through the foil is a weak point.
  • Furniture and shelves. With a vapour barrier, RIBuild asks that occupants do not puncture it later either. Fixing points for kitchen units or shelves should therefore be set in advance.
  • Substrate. According to RIBuild the wall must be clean and dry. Non-load-bearing plasters, paints, wallpaper and gypsum layers have to be removed so that they do not block moisture transport. A levelling plaster must dry before the boards are glued.

Does internal insulation count for a subsidy?

The Obnov dom mini+ call (26-MFOD-V01) gives low-income households a contribution of at most 11 000 € for a family house built before 2016. The first round closed on 31 August 2026. According to the call text, the call closes on 31 December 2026 or when the money runs out. The programme page announces a second round for January 2027. The eligible measures include insulation of the external envelope. Neither the measures page of the programme nor the call text says from which side the insulation has to be. The call leaves the detailed description of the measures to the Applicant Guide (chapter 2.6). Before applying, confirm in writing with the Slovak Environment Agency whether it accepts internal insulation. The full procedure is in the guide Obnov dom: the subsidy guide.

Frequently asked questions

Can I glue polystyrene to the inside of the wall?
RIBuild lists EPS and XPS among the vapour-tight insulation materials used for internal insulation. The wall behind them dries inwards less well, though, and RIBuild notes that the more vapour-tight the system, the more attention the joints and connections need. Whether polystyrene suits your wall should be assessed by the designer by calculation.
Will internal insulation stop mould in the corner of a room?
Not by itself. SIEA states that with internal insulation thermal bridges remain where floors and partitions meet the external walls. RIBuild links junctions with partitions and windows to a rising risk of surface condensation, so mould can appear where the insulated wall meets the ceiling or a partition. The risk is expressed by the internal surface temperature factor.
Does internal insulation need consent from the monuments office?
For a cultural monument, yes. Act 49/2002 Z. z. requires a decision on the renovation plan even for work that needs no notification or permit (§ 32(1) and (2)). For a house in a heritage protection zone the decision concerns the alteration of a building (§ 32(5)). Whether the office treats interior-only work as an alteration, confirm in writing with the regional monuments office.
Can only one room be insulated from the inside?
Yes, that is a common reason for internal insulation. Where the insulated wall meets a partition and the ceiling, however, a thermal bridge remains, which SIEA names explicitly for internal insulation. The designer should draw and assess these junctions.
How long must the wall dry before insulation?
The sources give no single period. RIBuild names underestimating drying times, for example after a levelling plaster, among the risks and requires a dry substrate. Masonry moisture can be measured, and RIBuild lists the calcium carbide method (CM) among the methods.
Is internal insulation cheaper than external insulation?
SIEA lists lower cost as an advantage. On top of the price, though, come moving installations, surveys of the beam ends, the calculation and the lost floor area. Only a quote for the specific house gives a comparable price.

Sources

  1. Zatepľovanie a výmena okien v rodinných domoch · Slovenská inovačná a energetická agentúra (SIEA) · p. 4 (moisture in masonry), p. 18 (insulation from the inside, insulating plasters), p. 19 (old thick walls, heat flow diagram)
  2. RIBuild D6.2: Written guidelines for decision making concerning the possible use of internal insulation in historic buildings · RIBuild consortium (EU Horizon 2020 project 637268) · Sections 3.6, 4.1 to 4.3 (Table 4-11), 5.1, 5.2
  3. Guideline for selecting an internal insulation system · RIBuild (Aalborg University) · Whole page
  4. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 2 písm. a, § 2 ods. 4
  5. Vyhláška č. 364/2012 Z. z., ktorou sa vykonáva zákon č. 555/2005 Z. z. · Ministerstvo dopravy SR, via Slov-Lex · Príloha č. 1, písm. e
  6. Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu · Národná rada Slovenskej republiky, via Slov-Lex · § 32 ods. 1, 2 and 5
  7. Zákon č. 182/1993 Z. z. o vlastníctve bytov a nebytových priestorov · Národná rada Slovenskej republiky, via Slov-Lex · § 2 ods. 1 písm. g, § 19 ods. 1
  8. Výzva Obnov dom mini+: Opatrenia · Slovenská agentúra životného prostredia (SAŽP) · Group A measures
  9. Výzva 26-MFOD-V01 Obnov dom mini+ · Slovenská agentúra životného prostredia (SAŽP) · Sections 1 and 4
  10. Zákon č. 246/2026 Z. z., ktorým sa mení a dopĺňa zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov v znení neskorších predpisov a ktorým sa menia a dopĺňajú niektoré zákony · Národná rada Slovenskej republiky, Slov-Lex · Čl. I body 10, 11 a 23
  11. Leitfaden Fassadensanierung und Innendämmung (CORNET / IN2EuroBuild) · TU Dresden, Institut für Bauklimatik / CORNET-IN2EuroBuild research project · 6.1
  12. Obnov dom: úvodná stránka programu · Slovenská agentúra životného prostredia (SAŽP) · Oznam

Topic

  • Renovation and subsidies