Mineral insulation board

A mineral insulation board is a rigid, steam-cured aerated panel that insulates the inside of an existing solid wall.

What is a mineral insulation board?

A mineral insulation board is a rigid, steam-cured aerated panel that insulates the inside of an existing wall. The European Technical Assessment ETA-05/0093 describes the Multipor board as made of quartz powder, calcium hydrate, cement and aggregates. Aluminium acts as the pore-forming agent, and high-pressure steam cures the board. Xella, the maker, calls the material a solid, mineral, monolithic insulation of calcium silicate hydrates with a porosity of about 95 percent by volume. Slovak trade literature calls the board minerálna izolačná doska. It calls the job vnútorné zateplenie, meaning internal insulation.

Internal insulation of walls is one of the uses in the assessment. You glue the board to the inside face of an existing wall with a light mortar, reinforce it with mesh and finish it with plaster, paint or wallpaper. This entry uses Multipor as the worked example because it is the product with a published assessment. Other mineral boards exist, so read each product's own documents. It is not the same product as a calcium silicate board. The calcium silicate boards compared below are denser and conduct heat about 1.6 to 1.7 times as much.

What does the European Technical Assessment declare?

A European Technical Assessment is a document that a technical assessment body issues for a construction product that has no harmonised standard. The German institute DIBt issued ETA-05/0093 for the Multipor boards on 30 October 2024. It names the grades M0, M2, M3, M4 and M4 light. The table gives the values for the four main grades. They are the manufacturer's declared values for that product, not values for mineral boards in general.

PropertyM0M2M3M4
Declared thermal conductivity at 23 degrees C and 50 percent humidity, W/(m K)0.0470.0450.0430.040
Density range, kg/m3110 to 125100 to 115100 to 11585 to 95
Water vapour resistance factor, mu5332
Compressive strength, mean value, kPaat least 350at least 350at least 300at least 200
Reaction to fireA1A1A1A1

Two limits of the assessment matter to a specifier. First, the performance applies only if you install the boards to the maker's instructions and protect them from precipitation, wetting and weathering. Second, the assessment does not cover the use of the boards in thermal insulation systems. The adhesives and fixings are not part of it. National provisions set the design value of thermal conductivity, so it is not the declared value in the table.

Does EN 14306 cover a mineral insulation board?

No. EN 14306 specifies factory-made calcium silicate products for the thermal insulation of building equipment and industrial installations. Its operating range is about -170 to +1 100 degrees C. The British Standards Institution catalogue page states that the standard does not cover products for insulating the building structure. Internal wall insulation is building-structure insulation. The assessment of the Multipor board refers instead to EAD 040012-00-1201, titled “Thermal insulation board made of mineral material”. The page for the 2015 edition shows that it supersedes the 2009+A1:2013 edition.

How does the board handle moisture?

The board is vapour-open. The assessment gives a water vapour resistance factor of 2 to 5, depending on the grade. The maker describes the board as open to diffusion. The assessment also limits short-term water absorption to 2 kg/m2 (EN 1609, method B). It limits long-term water absorption to 3 kg/m2 for M2, M3 and M4, and 4 kg/m2 for M0 (EN 12087, method 1B). The mass-related moisture content at 23 degrees C and 80 percent humidity is 0.032 kg/kg.

The Xella interior insulation brochure states that walls insulated on the inside with these boards need no vapour barrier. It bases this on simulations with a mid-German climate, driving rain on the outside and an interior of 20 degrees C and 50 percent humidity. That is a manufacturer statement for one set of conditions. For a wall in another climate or with another moisture load, calculate whether it can dry, as the entry on internal insulation explains. For the wider idea of moisture moving back to the room, see capillary-active insulation.

The board does not cure a wet wall. Water that rises from the ground reaches the wall by capillary rise, and the assessment makes its values conditional on protection from wetting. Fix the source of moisture first.

How is the board installed on an existing wall?

The Xella brochure describes a glued system without drilling or anchoring. The table lists the steps it gives.

StepWhat the Xella brochure states
SubstrateInspect it, fill damaged spots with repair mortar and level it with compensation plaster if it is uneven
AdhesiveLight mortar combed over the full surface with a toothed trowel (10 mm teeth up to 160 mm board thickness, 12 mm above), about 3 to 4 kg/m2
ToleranceA mortar bed of about 8 to 10 mm compensates unevenness of the wall up to 3 mm
ReinforcementA layer of light mortar with embedded mesh, about 3 kg/m2
FinishStructured plaster, paint or wallpaper
LoadsSingle loads up to 3 kg depending on the fixing, tiles up to 12 kg/m2 with 4 anchors per m2

The brochure lists boards of 600 by 390 mm in thicknesses from 50 to 160 mm. Its table gives a thermal resistance of 1.11 m2K/W for 50 mm and 2.22 m2K/W for 100 mm. That matches the thickness divided by a conductivity of 0.045 W/(m K).

How is it different from calcium silicate board?

Both products are mineral and non-combustible, but the numbers differ. The table sets the assessment of the Multipor board against the data sheets of two calcium silicate boards. The entry on calcium silicate board describes them. All values are manufacturer values for the named product.

PropertyMultipor M2 and M3 (ETA-05/0093)Remmers SLP CS 25Redstone Clima Redboard basic
Thermal conductivity, W/(m K)0.045 and 0.043 declaredapprox. 0.073 dry, nominal approx. 0.070.075 declared, 0.080 rated
Density, kg/m3100 to 115approx. 300235 to 253
Water vapour resistance factor, mu353
Board thickness listed50 to 160 mm (brochure)25, 30 and 50 mm25 and 40 mm

For the same thermal resistance, the mineral insulation board needs less thickness. A 25 mm calcium silicate board with a rated 0.080 W/(m K) gives about 0.31 m2K/W. The 50 mm Multipor board gives 1.11 m2K/W by the brochure. The makers of the calcium silicate boards stress capillary activity, and the maker of the Multipor board stresses vapour openness and low density. Which one suits a wall depends on the moisture calculation, not on the thermal value alone.

What should you ask a supplier before specifying one?

Ask for the following in writing before you agree the price, since a board without its adhesive and finish is hard to warrant as a system:

  • The grade and its current assessment or declaration of performance, with the declared thermal conductivity and the humidity it applies to.
  • The density range and the compressive strength of the grade you buy.
  • The vapour resistance factor and the water absorption figures for that grade.
  • The system components the maker names, such as the light mortar, mesh and plaster.
  • Written guidance on the substrate and on which finishes the maker allows.

These checks are design advice, not a legal requirement. The product documents remain the authority for every figure.

Frequently asked questions

What is a mineral insulation board used for?
It insulates the inside of an existing wall, among other uses listed in its European Technical Assessment. You glue it with a light mortar, reinforce it with mesh and plaster or paint it. The maker's system documents name the adhesive and the finish.
Is a mineral insulation board covered by EN 14306?
No. EN 14306 covers calcium silicate products for building equipment and industrial installations. It does not cover insulation of the building structure. The assessment of the Multipor board refers to EAD 040012-00-1201 instead, and the performance figures come from ETA-05/0093.
How is it different from calcium silicate board?
The Multipor board declares 0.043 to 0.047 W/(m K) and 100 to 125 kg/m3 for grades M0 to M3. The two calcium silicate boards compared here state about 0.07 to 0.08 W/(m K) and 235 to 300 kg/m3. Their data sheets stress capillary activity.
Does a mineral insulation board need a vapour barrier?
Xella states that its system needs none. The statement rests on simulations for one climate and one interior condition. For another wall you need a moisture calculation, so do not treat the statement as a general rule.
Is it combustible?
The assessment ETA-05/0093 gives reaction to fire class A1 under EN 13501-1, which means non-combustible. Read the declaration of performance of the exact product before you rely on it.
How thick is a mineral insulation board?
The Xella brochure lists boards of 600 by 390 mm in thicknesses from 50 to 160 mm, and the assessment allows nominal thicknesses from 20 to 300 mm. The thermal resistance of a 100 mm board is 2.22 m2K/W according to the brochure.

Sources

  1. European Technical Assessment ETA-05/0093 of 30 October 2024, Multipor insulation board M0, M2, M3, M4, M4 light · Deutsches Institut für Bautechnik (DIBt) · 1 Technical description, 2 Intended use, 3 Performance
  2. Technical data sheet, Multipor mineral insulation systems, Multipor insulation board (status 04/2022) · Xella Germany GmbH (copy hosted by Back to Earth Ltd) · Technical data
  3. Ytong Multipor Mineral Insulation Boards, Interior Insulation (brochure) · Xella (copy hosted by Back to Earth Ltd) · Technical data, processing, interior insulation without vapour barrier
  4. BS EN 14306:2015, Thermal insulation products for building equipment and industrial installations. Factory made calcium silicate (CS) products. Specification (catalogue page) · British Standards Institution · Scope and exclusions
  5. SLP CS 25, calcium silicate interior insulation board for thermal building renovations, Technical Data Sheet, product number 0273 (TM-7 07/26) · Remmers Gruppe AG · Characteristic data
  6. Clima Redboard basic, Mineral Heat Insulation Board Made of Calcium Silicate, Technical Data Sheet (status 12/12/2019) · redstone GmbH & Co. KG · Technical data