Calcium silicate board
A calcium silicate board is a mineral panel that insulates the inside of an old wall and takes up moisture from it.
What is a calcium silicate board?
A calcium silicate board is a factory-made mineral panel that you fix to the inside of an existing wall or ceiling as a thin insulation layer. The Redstone data sheet names the material as calcium silicate with cellulose fibres, so some products are fibre-reinforced. Slovak trade literature uses kalciumsilikátová doska, and builders often describe the same job as vnútorné zateplenie, meaning internal insulation. The two interior boards read for this entry are non-combustible (fire class A1). Their makers sell them for mould control and for raising the temperature of the inner wall surface.
The name covers more than one product family. The Promat PROMINA board is a dense, self-supporting multi-purpose panel whose application list starts with heavy industry, such as dryers and industrial furnaces. Interior insulation boards are a different product. They are lighter, porous and vapour-open. This entry covers the second group. Values differ by product and by thickness. Never carry a figure from one data sheet over to another product.
How does a capillary-active calcium silicate board handle moisture?
Capillary-active means the board can take liquid water into its pores and move it back toward the warmer room side, where it can evaporate. Fraunhofer IBP describes this reverse transport for calcium silicate in its Kapi-test. Both interior data sheets list capillary activity as a feature. Remmers calls SLP CS 25 capillary-active. Redstone calls Clima Redboard basic capillary-active and breathable. For the wider idea, see capillary-active insulation.
The data sheets express this behaviour as a water absorption coefficient. Redstone gives its board 51 kg per square metre per square root of hour. Remmers gives SLP CS 25 approximately 77.4 on the same basis. Both sheets also give a water vapour resistance factor, mu, which tells how easily water vapour passes through the board. Redstone gives mu = 3 and Remmers gives 5, so both products let vapour pass. Redstone allows only breathable final coatings, so that the board keeps these properties.
Moisture behaviour has a limit. The Redstone instructions require a clean, load-bearing and tension-free substrate, and state that construction defects and penetrating moisture must be properly remedied. A capillary-active board can buffer humidity, but it does not replace the repair of a leaking wall. For the physics behind surface condensation, see dew point.
What do the technical data sheets say about its values?
The table compares the three manufacturer data sheets read for this entry. Every figure is the manufacturer's own value for that product. The Remmers sheet calls its values typical data and not binding product specifications. Use the table as a starting point for a specification, not as a guarantee.
| Property | Remmers SLP CS 25, 25 mm | Redstone Clima Redboard basic, 25 mm | Promat PROMINA, multi-purpose board |
|---|---|---|---|
| Density | dry density approximately 300 kg/m3 | apparent density 235 to 253 kg/m3 | bulk density 870 kg/m3 |
| Thermal conductivity | approximately 0.073 W/(m K) for the dry material, nominal approximately 0.07 W/(m K) | declared 0.075 W/(m K) at 23 degrees C and 50 percent humidity, rated value 0.080 W/(m K) | 0.17 W/(m K) at 20 degrees C |
| Water vapour resistance factor, mu | 5 | 3 | 15 |
| Water absorption coefficient | approximately 77.4 kg/(m2 h^0.5) | 51 kg/(m2 h^0.5) | not stated |
| pH | 9.34 (declaration of conformity) | approximately 10 | approximately 11 |
| Fire class | A1, non-combustible | A1, non-combustible | A1, non-combustible |
The spread in thermal conductivity matters most for a thin interior layer. The PROMINA figure of 0.17 W/(m K) is more than twice the Remmers value. Its density is almost three times higher. It is a weak comparison for interior insulation. The Redstone sheet ties its declared and rated thermal conductivity to a European technical assessment, ETA-19/0559. Check that document before you write a value into a specification.
The thermal resistance of a thin board is small. Dividing the 25 mm thickness by the Redstone rated value of 0.080 W/(m K) gives about 0.31 m2K/W. The Remmers boards come in 25, 30 and 50 mm, in a format of 1000 by 500 mm. The Redstone boards come in 25 and 40 mm at 625 by 1000 mm. A small format of 500 by 333 mm comes in 25 mm.
Where is calcium silicate board used for interior insulation and mould remediation?
Remmers lists three ranges of use for SLP CS 25. They are mould control and prevention in existing buildings, the hygienic minimum level of heat insulation in existing buildings, and a better room climate through a warmer wall surface. The entry on internal insulation describes these settings. There you insulate an existing wall from the inside because you cannot change the outer face.
Redstone describes its board as a way to absorb excess interior humidity and to prevent condensation on walls and ceilings. Its instructions name mould growth among the contaminants to remove from the substrate. If the substrate needs disinfecting, the sheet names a separate Redstone product to use first. The table lists the steps from the Redstone sheet.
| Step | What the Redstone sheet requires |
|---|---|
| Substrate | Clean, load-bearing and tension-free, with uneven areas levelled with mineral patching plaster |
| Adhesive | System adhesive spread with a notched trowel of at least 10 mm over the whole surface |
| Fixing | Two plugs per m2 for rooms higher than 3.50 m, four per m2 on ceilings and sloped ceilings |
| Joints | Reinforced with mesh, joint width no more than 3 mm, no cross joints |
| Finish | Primer, then levelling compound or lime smooth finish, using breathable products only |
The Redstone sheet also says a gypsum substrate needs a special sulphate-resistant adhesive. The Remmers sheet gives a different sequence for its own system. You pre-wet the substrate, put the adhesive on the board and on the wall, and press the boards on from the bottom up with full-surface bonding. Follow the sheet of the board you buy.
How is calcium silicate board different from mineral insulation board?
Both products are mineral, non-combustible and sold for interior use, so they are often compared. The values differ a great deal. The European technical assessment ETA-05/0093 covers the Multipor mineral insulation board. It declares a thermal conductivity of 0.040 to 0.047 W/(m K) and a density of 85 to 125 kg/m3, depending on the grade. The calcium silicate boards above state 0.07 to 0.08 W/(m K) and 235 to 300 kg/m3. The mineral insulation board is therefore the lighter and better insulating material, while the calcium silicate boards are the ones their makers describe as capillary-active. The entry on mineral insulation board gives the full assessment values.
Which standard covers calcium silicate boards, and what should an architect check?
The Remmers sheet gives a declaration of conformity to EN 14306:2009+A1:2013 for its boards. The British Standards Institution catalogue page for EN 14306 gives its scope as factory-made calcium silicate products for the thermal insulation of building equipment and industrial installations. The same page states that the standard does not cover products for insulating the building structure. It also says the 2015 edition supersedes the 2009+A1:2013 edition. EN 14306 alone therefore cannot support the specification of an interior wall board. Read the manufacturer's documents for the building use.
A short check before specifying helps:
- the density and thermal conductivity of the exact thickness, because the data sheets give different values by product and condition,
- the moisture source, which you must fix before you install the board,
- the substrate, including whether gypsum needs a special adhesive,
- whether the finish is breathable, since the Redstone instructions allow only breathable coatings,
- the current data sheet and technical assessment of the product, to check the values and the fire class of the board you buy.
Frequently asked questions
- What is calcium silicate board used for?
- It forms a thin interior insulation layer on existing walls and ceilings. The Remmers sheet lists mould control, the hygienic minimum level of heat insulation and a higher wall surface temperature. The Redstone sheet adds absorbing excess interior humidity. It is chosen where the outside of the wall cannot be insulated.
- Is calcium silicate board capillary-active?
- The makers of the two interior boards read for this entry call them capillary-active. This means the board can take up liquid water from the wall and release it later. Products differ, so check the water absorption coefficient on the data sheet of the exact board.
- What is the thermal conductivity of calcium silicate board?
- It depends on the product and the density. The two interior boards compared here state between about 0.07 and 0.08 W/(m K), while the Promat PROMINA multi-purpose board states 0.17 W/(m K). Always use the value from the data sheet of the board you buy.
- Does calcium silicate board stop mould?
- The manufacturers describe their boards as mould inhibiting or mould-resistant and sell them for mould control. A board does not remove the cause of mould. Redstone states that construction defects and penetrating moisture must be repaired, and that a substrate with mould needs disinfecting before the board goes on.
- Can calcium silicate board be fixed to a gypsum wall?
- Redstone's instructions say a gypsum substrate needs a special sulphate-resistant adhesive. The substrate must also be clean, load-bearing and tension-free, and the sheet says thinly plastered areas are generally not a sufficiently stable base.
- Is EN 14306 enough to specify a calcium silicate board for a wall?
- No. EN 14306 covers calcium silicate products for building equipment and industrial installations and states that it does not cover insulation of the building structure. Ask the maker for the documents that cover the use on a wall.
Sources
- SLP CS 25, calcium silicate interior insulation board for thermal building renovations, Technical Data Sheet, product number 0273 (TM-7 07/26) · Remmers Gruppe AG · Range of use, characteristic data, directions, declaration of conformity
- Clima Redboard basic, Mineral Heat Insulation Board Made of Calcium Silicate, Technical Data Sheet (status 12/12/2019) · redstone GmbH & Co. KG · Technical data, instructions for use
- PROMINA, structural calcium silicates, Technical Data Sheet (2017-09) · Etex Industry (Promat) · Technical data, application areas
- BS EN 14306:2015, Thermal insulation products for building equipment and industrial installations. Factory made calcium silicate (CS) products. Specification (catalogue page) · British Standards Institution · Scope and exclusions
- Capillary reverse transport capabilities in capillary-active interior insulation systems · Fraunhofer Institute for Building Physics IBP (web article on the Kapi-test) · Kapi-test
- European Technical Assessment ETA-05/0093 of 30 October 2024, Multipor insulation board M0, M2, M3, M4, M4 light · Deutsches Institut für Bautechnik (DIBt) · 3.3 Energy economy and heat retention, density