Internal insulation
Internal insulation is an insulation layer fixed to the room side of an existing external wall, used where the facade cannot be insulated outside.
When is internal insulation chosen instead of external insulation?
Internal insulation (vnútorné zateplenie) is a layer fixed to the room side of an existing external wall to cut heat loss. A research guide from TU Dresden says that in some old buildings it is the only way to insulate the external walls. It names facades that shape the townscape or are worth keeping, exposed brickwork and buildings built up to the plot boundary. It also names buildings with mixed ownership and cases where outside insulation costs more.
In Slovakia a protected building adds a legal step. Under zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu, the owner of a cultural monument applies to the regional heritage office (krajský pamiatkový úrad). The application asks for a decision on the renovation intent and comes before work starts (§ 32 ods. 2). The act defines renovation to include adaptation and reconstruction (§ 32 ods. 1). The decision says whether the intent is acceptable and sets the conditions (§ 32 ods. 4). A property in a heritage protection zone that is not a monument needs a similar decision. It concerns the intent to alter the property (§ 32 ods. 5). See heritage authority consent. Such a scheme is a heritage question before it is a building-physics question.
Why does the moisture problem move inside the wall?
The guide says the existing wall becomes much colder in the heating period once it is insulated from the inside. Moisture questions then matter as much as energy questions. A Polish simulation study adds that the new layer raises the diffusion resistance between wall and room. The wall then dries inwards less well. That raises the chance of interstitial condensation, mould on the inner surface and damage to timber parts in the wall.
The guide also notes that the better (lower) the U-value of the existing wall, the lower the condensation risk behind the new layer. It does not give a reason, so this page does not either.
Moisture from outside is harder to handle. The guide points out that moisture entering through defects or driving rain hardly dries towards the room behind a vapour-tight system. It can collect behind the insulation. It states the design principle as as vapour-tight as necessary, as vapour-open as possible. For all systems it asks for airtight connections on the room side. In section 6.2 it asks for a continuous airtight layer in the thermal envelope to avoid convective vapour entry behind the insulation.
The guide also shows why a bare layer of vapour-open fibre insulation has limits. Condensation can form on its cold back in winter. On an absorbent substrate that is tolerable to a degree, but it adds moisture to the wall. The guide accepts such a build-up only up to a few centimetres. Thicker layers need an added vapour-retarding layer.
What system families exist?
The guide groups internal insulation by the sd value of the system, using the classes of the German standard DIN 4108-3. The sd value is the equivalent air-layer thickness of a layer. The table follows the guide.
| Family | sd value in the guide | Materials the guide names | How it handles moisture |
|---|---|---|---|
| Vapour-tight, vapour-blocking and vapour-inhibiting | 10 m or more | Foam glass, rigid foam, or a fibre layer with a vapour barrier | Keeps room moisture out of the wall. Used mostly in wet rooms such as swimming pools. Moisture that gets in hardly dries inwards. |
| Vapour-retarding | Above 0.5 m up to 10 m | Vapour-open fibre with a vapour retarder, or EPS and XPS. Some hybrid materials are capillary-active. | Little vapour enters. A low enough sd value leaves some drying towards the room. |
| Variable vapour-retarding | Above about 2 m in winter, below 0.5 m in summer | Mineral or natural fibre with a humidity-variable vapour retarder | Little vapour enters in winter and the wall can dry inwards in summer. |
| Vapour-open, capillary-active | 0.5 m or less | Calcium silicate, perlite and mineral foam boards, clay insulation, insulating plaster | Some vapour enters. A rise in moisture at the boundary is planned, and capillary action returns it. |
How do you choose a system?
The guide says the choice depends mainly on three things. They are the driving-rain load, the absorbency of the inner surface of the existing wall and the moisture load inside. Where the wall takes up no relevant rain water and the room moisture load is normal, it sees a fairly free choice among the systems. Where the room moisture load is high and the wall absorbs no rain, the guide calls systems of sd 10 m or more well suited.
Where moisture also comes from outside and cannot be removed, drying towards the room may be needed. That limits the materials and the allowed thickness. The guide adds that timber-frame walls are moisture-sensitive. For them it cites a WTA leaflet on internal insulation of timber frame. The leaflet limits the room-side diffusion resistance to an sd value of 2 m at most. The checker did not open that leaflet.
How is the moisture risk assessed?
The classical hand method is the Glaser calculation. The guide says it considers only water vapour transport. Liquid water from condensate or rain uptake and moisture storage are ignored. For that reason, the guide says, vapour-open capillary-active systems can no longer be shown to work with it.
The guide describes a simplified check in WTA leaflet 6-4-16 as an alternative to simulation. It may be used only when several conditions hold. They include sufficient driving-rain protection, a wall not in contact with the ground and an existing wall resistance R of at least 0.4 m²K/W. They also include a normal indoor moisture load and no room air flowing behind the insulation. The mean annual outdoor temperature must be at least 7 °C. The new layer may add only a limited amount to R. The guide says this check does not cover capillary-active systems. The conditions come from the guide's summary, not from the leaflet.
Hygrothermal simulation models heat and moisture transfer together, including liquid transport. The guide recommends it where the substrate is moisture-sensitive, for example with gypsum or timber parts. EN 15026:2023 specifies the model components of such a simulation and a method to validate the model. It does not set the pass criteria. The standard says applications of the results are not covered by it. The criteria table in the guide lists German limits, not Slovak ones. One example is a total water content that settles into a repeating cycle. Another is a relative humidity below 95 % at the boundary, for a material that is not frost-resistant.
Where do the details fail first?
Thermal bridges are the usual weak points, because floors and walls cross the insulation plane. The table follows the guide.
| Detail | What changes | What the guide recommends |
|---|---|---|
| Timber beam ends at floor supports | The beams cross the insulation plane and form a thermal bridge. The beam head becomes somewhat colder and damper. | Studies cited in the guide were mostly uncritical. Driving rain is the greatest danger, so rain protection comes first. Check beam heads at spot positions at risk, such as near water pipes, downpipes and the weather-side corner. Insulate through at the outer wall in the floor depth where possible. Add a moisture barrier under the beam head only where masonry moisture is a load. Use a two-dimensional hygrothermal simulation when in doubt. |
| Internal walls meeting the external wall | The wall corner stays colder than the rest. | Flanking insulation, often a third to a half of the standard thickness, mostly 30 to 40 cm long. It is needed mainly when the internal wall is thicker than half the external wall. |
| Solid intermediate floors | The floor slab bridges the insulation, especially at an outer corner. | Flanking insulation of the same kind, often a third to a half of the standard thickness and 30 to 40 cm long. |
New windows are fitted before the internal insulation. The reveal insulation of the chosen system then connects to the window airtight and with optimised thermal bridges. See airtightness.
How is internal insulation different from external insulation?
With external insulation the masonry stays on the warm side of the layer. With internal insulation the masonry is colder in winter, so moisture has to be managed inside the wall. In return the facade stays untouched, which is why it is the option when the appearance must be kept.
Frequently asked questions
- Is any condensation inside an internally insulated wall a defect?
- Not automatically. For vapour-open capillary-active systems the guide treats a rise of moisture at the boundary as planned, but it says condensation should still be limited. One criterion it lists for Germany is that the total water content of the wall settles into a repeating seasonal cycle.
- Does internal insulation on a protected building need a heritage decision?
- On a cultural monument the owner applies to the regional heritage office for a decision on the renovation intent. The application comes before work starts (act 49/2002 Z. z., § 32 ods. 2). A property in a heritage protection zone that is not a monument needs a decision on the intent to alter it (§ 32 ods. 5).
- Why can the Glaser method not prove a capillary-active system?
- The Glaser method considers only water vapour transport. Capillary-active systems rely on liquid water transport and moisture storage, which it ignores. The guide points to hygrothermal simulation for them.
- Which detail should be checked first?
- Timber beam ends where beams cross the insulation plane. The guide reports that studies were mostly uncritical, but driving rain is the greatest danger. It advises checking beam heads at spots at risk and a two-dimensional simulation when in doubt.
- What decides which internal insulation system fits a wall?
- The guide names three things: the driving-rain load, the absorbency of the inner surface of the existing wall and the moisture load inside the room. Its principle is as vapour-tight as necessary and as vapour-open as possible.
Sources
- Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu · Slov-Lex (Národná rada SR) · § 32 ods. 1, 2, 4 and 5
- Leitfaden Fassadensanierung und Innendämmung (CORNET / IN2EuroBuild) · TU Dresden, Institut für Bauklimatik / CORNET-IN2EuroBuild research project · Introduction. 3.1. 4.1 to 4.3. 5. 6.1 and 6.2
- STN EN 15026 (73 0708): Hygrothermal performance of building components and building elements. Assessment of moisture transfer by numerical simulation · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), preview of the standard · Foreword, Introduction, Clause 1 Scope
- Numerical Evaluation of the Hygrothermal Performance of a Capillary Active Internal Wall Insulation System under Different Internal Conditions · Kaczorek, D., Materials (Basel) 15(5), 1862, MDPI; DOI 10.3390/ma15051862 · 1. Introduction