Capillary-active insulation

Capillary-active insulation is vapour-open interior insulation that takes up condensed water and returns it toward the room to evaporate.

What is capillary-active insulation?

Capillary-active insulation (kapilárne aktívna izolácia) is an interior insulation system that lets water vapour pass and moves liquid water through its pores. It belongs to the family of internal insulation systems. The TU Dresden research guide describes these systems as vapour-open materials with enough capillary conductivity. It names calcium silicate, perlite and mineral foam boards, clay insulation and insulating plaster as common examples. See calcium silicate board and mineral insulation board.

The difference from a conventional system is the vapour retarder. Fraunhofer IBP notes that the standard way to stop condensation behind interior insulation is a vapour retarder on the room side. The institute adds that the insulation then cannot dry out well in dry weather. A capillary-active build-up accepts some vapour and manages the moisture instead. See vapour retarder.

How does capillary-active insulation work?

The guide describes the principle for vapour-open systems. A limited amount of vapour may flow into the existing wall. A rise of moisture at the boundary between old wall and insulation is planned, and it starts a capillary return flow. Condensation should still be limited, not least because the materials store a lot of moisture. The substrate behind the insulation must tolerate the planned rise in winter. The guide asks for boards to be bonded to the substrate over the full surface.

  • Some vapour from the room diffuses into the insulation.
  • Moisture rises at the boundary with the old wall. This is planned.
  • Capillary action in the pores returns liquid water towards the drier room side.
  • The material stores moisture and limits condensation.

Fraunhofer IBP measures the return flow with a laboratory method it calls the Kapi-test. A sample of calcium silicate has its sides and back sealed, and only the front faces the air of a climate chamber. A cooling element holds the rear face below the dew point of the room air. Diffusion from the room air raises the relative humidity towards the back, while capillary action moves moisture the other way. If capillary action is strong enough, movement in both directions settles into equilibrium.

In the reported test, moisture first built up on the cooled rear side and then spread over a larger part of the sample. Equilibrium came after about three to four weeks, at a total water content of about 49 kg/m3. The page describes one test on one material.

What do simulations show about the moisture balance?

Kaczorek (2022) simulated four vapour-open interior systems in WUFI Plus. The base wall was 25 cm solid brick with 11 cm of external EPS, so it was already insulated outside. The model covered one hypothetical room in Kraków over three years, with insulation thicknesses of 4 to 5, 8 and 12 cm. The table lists the systems and what the paper reports for each. It is a result for that setting, not a product certificate.

SystemVapour resistance factor μ in the modelWhat the paper reports
Perlite board7.0The abstract names it among the systems with the worst hygric properties. In the variable-occupancy runs it shows no hours of dampness at any thickness.
Microporous calcium silicate4.1Hours of dampness at 12 cm under variable occupancy: 835
Rigid wood fibreboard10.0Lowest relative humidity values in the study, linked by the authors to the highest diffusion resistance. Hours of dampness at 12 cm under variable occupancy: 112
Flexible wood fibreboard3.0Highest risk of mould and interstitial condensation. Hours of dampness at 12 cm under variable occupancy: 1905

The abstract says that the perlite board system and the wood fibreboard system showed the worst hygric properties, without saying which wood board. The tables and the conclusions single out the flexible wood fibreboard. Read the ranking with this inconsistency in mind.

When does the moisture balance matter most?

In the simulations the room mattered as much as the material. Dampness and mould indices were non-zero only in the variant with the lowest ventilation, 0.2 air changes per hour. With variable occupancy in that variant, relative humidity at the interior surface ranged from 37 to 38 % up to 73 to 74 %. In the variant with the most ventilation, including window airing, the range was 17 to 18 % to 50 to 52 %. Constant occupancy gave higher humidity than variable occupancy.

Thickness is the second factor. The paper reports that total moisture content rises with insulation thickness. A thicker layer also reduces the wall's ability to dry into the room. Under variable occupancy dampness appeared only at 12 cm. Under constant occupancy, all four systems showed dampness at 12 cm in the lowest-ventilation variant, and some did at thinner layers too.

How is it different from a vapour-tight system with a retarder?

The two approaches answer the same problem in opposite ways. The table compares them using the guide and Fraunhofer IBP.

PropertyCapillary-active, vapour-openVapour-tight or vapour-retarding
Vapour entering the wallAllowed in moderationLargely prevented
Moisture at the boundary with the old wallA planned rise, returned by capillary actionNone expected from the room side
Drying of the insulationPossible towards the roomLimited, according to Fraunhofer IBP
ConnectionsAirtight on the room sideAirtight and vapour-tight, because the guide sees little tolerance for faults

How do you check a design before using it?

The guide says capillary-active systems cannot be shown to work with the Glaser method, which considers only vapour transport. It also says the simplified check in WTA leaflet 6-4-16 does not cover them. It points to hygrothermal simulation, which includes liquid transport. See hygrothermal simulation. EN 15026:2023 sets the model components and a validation method for such tools. It does not set pass criteria.

The result depends on the input values. In the Fraunhofer work, values from the Kapi-test matched the measured moisture closely. Values from wind-and-weather tests gave much lower moisture and a faster equilibrium. A simulation is only as good as the transport data behind it. This page's own advice, not a rule from the sources, is to keep the product data sheet and its date in the design file. Then you can trace the values used.

What do the sources not tell you?

The Kaczorek study is a simulation with no field measurements. The Fraunhofer page reports one test on one material. Neither source tests a product as sold. The guide is a German research guide, and its limits apply to Germany.

What should a Slovak project check?

This page cites no Slovak standard for the system. Check the product data sheet for its values. A project on a cultural monument needs a decision from the regional heritage office on the renovation intent before work starts (act 49/2002 Z. z., § 32 ods. 2). A property in a heritage protection zone needs a decision on the intent to alter it (§ 32 ods. 5). See interstitial condensation for the moisture risk that the system is meant to manage.

Frequently asked questions

Is capillary-active insulation the same as a breathing wall?
No. The phrase breathing wall suggests air moving through the wall. The sources describe vapour diffusion and the capillary transport of liquid water through the pores of the material.
Does capillary-active insulation ventilate the room?
No. Moisture moving through the insulation does not replace the air exchange a room needs. In the Kaczorek simulations the lowest ventilation rate gave the highest humidity at the interior surface, so ventilation has to be handled separately.
Why not simply use a vapour retarder?
A retarder keeps moisture out of the insulation, and Fraunhofer IBP notes that the insulation then cannot dry out well. A capillary-active system accepts some vapour and manages it. Each choice needs a moisture check for the specific wall.
Which systems do the sources compare?
The Kaczorek simulations compare perlite board, microporous calcium silicate, rigid wood fibreboard and flexible wood fibreboard. Flexible wood fibreboard had the highest mould and condensation risk. The abstract also names perlite and wood fibreboard as worst, which the tables do not fully confirm.
Does it need a hygrothermal simulation before use?
The guide says the Glaser method and the simplified WTA 6-4-16 check do not cover capillary-active systems, and points to hygrothermal simulation. The Fraunhofer work shows that results depend on the transport values used. No Slovak rule is cited here.

Sources

  1. Numerical Evaluation of the Hygrothermal Performance of a Capillary Active Internal Wall Insulation System under Different Internal Conditions · Kaczorek, D., Materials (Basel) 15(5), 1862, MDPI; DOI 10.3390/ma15051862 · Results and conclusions
  2. Capillary reverse transport capabilities in capillary-active interior insulation systems · Fraunhofer Institute for Building Physics IBP (web article on the Kapi-test)
  3. Leitfaden Fassadensanierung und Innendämmung (CORNET / IN2EuroBuild) · TU Dresden, Institut für Bauklimatik / CORNET-IN2EuroBuild research project · 4.2 Diffusionsoffene Innendämmsysteme. 5.1
  4. STN EN 15026 (73 0708): Hygrothermal performance of building components and building elements. Assessment of moisture transfer by numerical simulation · Úrad pre normalizáciu, metrológiu a skúšobníctvo SR (ÚNMS), preview of the standard · Foreword, Introduction, Clause 1 Scope
  5. Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu · Slov-Lex (Národná rada SR) · § 32 ods. 2 and 5