Insulating plaster
An insulating plaster is a lightweight mortar that adds some thermal insulation to a wall in a thin render layer.
What is insulating plaster?
An insulating plaster is a lightweight mortar that adds some thermal insulation to a wall as a render coat. EN 998-1, the European specification for rendering and plastering mortar, calls it a thermal insulating mortar and gives it the type letter T. It defines the term as a designed mortar with specific insulating properties. In Slovak it is tepelnoizolačná omietka. The Baumit data sheet for ThermoPutz lists lime hydrate, cement, plastering sand, a lightweight filler and additives. The filler of that product is perlite.
The product is a plaster, so it goes on wet, by hand or by machine, and it is not a board. The Baumit data sheet describes ThermoPutz as a hand-applied core render for interior and exterior use on mineral substrates. The Baumit NHL Thermo page describes a cement-free render on a natural hydraulic lime base for machine application. It calls the product a base coat for all mineral wall materials.
How well does insulating plaster insulate?
EN 998-1 sorts thermal insulating mortars into two classes by thermal conductivity. The Mortar Products Association data sheet on the standard gives T1 as 0.1 W/(m K) or less and T2 as 0.2 W/(m K) or less. The class is an upper limit. The value of the product is on its own data sheet.
The Baumit ThermoPutz sheet shows what a T2 product looks like. It gives a thermal conductivity of 0.083 W/(m K) measured to EN 12667. It also gives a dry density of about 470 kg/m3, a water vapour resistance factor of about 8, fire class A1 and compressive strength class CS II. The minimum layer is 20 mm and the maximum is 30 mm in one coat. A 30 mm layer of that product has a thermal resistance of about 0.36 m2K/W (0.030 divided by 0.083).
That figure is small next to a board. The Xella brochure gives 2.22 m2K/W for a 100 mm mineral insulation board with a conductivity of 0.045 W/(m K). A 25 mm calcium silicate board with a rated 0.080 W/(m K) gives about 0.31 m2K/W, which is close to the plaster. The table compares the three. All values are manufacturer values for the named product.
| Product | Thermal conductivity, W/(m K) | Layer or thickness used | Thermal resistance, m2K/W |
|---|---|---|---|
| Baumit ThermoPutz, T2 insulating plaster | 0.083 | 30 mm, the maximum in one coat | about 0.36 |
| Redstone Clima Redboard basic, calcium silicate board | 0.080 rated | 25 mm | about 0.31 |
| Multipor mineral insulation board | 0.045 | 100 mm | 2.22 (Xella brochure) |
The plaster and board values come from different tests, so the comparison shows an order of magnitude, not a design value. Read the entries on calcium silicate board and mineral insulation board for the boards.
Where can insulating plaster be used and where not?
The Baumit ThermoPutz sheet allows interior and exterior use on mineral substrates. It excludes the plinth zone in exterior walls and areas with splashing water. It says the plaster is not suitable as a base for tiles. The Baumit NHL Thermo page excludes the plinth area and tiling too. The same page markets the product for historic buildings and listed buildings, which is a manufacturer statement. For a protected building, the permitted work is a heritage decision, as the entry on internal insulation explains.
The ThermoPutz sheet sets conditions for the substrate and the work:
- the substrate must be clean, dry, frost-free, free of dust and loose particles or efflorescence, and it must not repel water,
- the joints of the masonry must be filled,
- a layer up to 30 mm goes on in one pass, and thicker or varying layers go on in coats,
- before the next layer goes on, the plaster waits at least 5 days for each 10 mm of thickness,
- air, material and substrate stay above +5 degrees C during application and curing.
The sheet also warns that insulating plasters have a higher risk of cracks, mainly because of the usual thickness. Reinforcement does not always prevent them. It recommends an intermediate coat before the final finish, for example a Baumit skim coat, reinforced with glass-fibre mesh.
What finish goes on insulating plaster inside?
The ThermoPutz sheet lists the interior finishes it allows. They are a skim coat or a plaster from the Baumit range, or commonly available paints and thin-layer plasters, for example interior dispersion paints. The Baumit NHL Thermo page calls its plaster highly vapour-open. A finish that blocks vapour would cancel that property, so use the finish that the system documents of your product allow.
How is insulating plaster different from an insulation board?
An insulation board is a prefabricated panel that you glue or fix to the wall. An insulating plaster is a mortar that you apply wet in coats. The table sets out the differences the sheets support.
| Feature | Insulating plaster (Baumit ThermoPutz) | Mineral insulation board (Multipor) |
|---|---|---|
| Form | Dry mortar mixed with water, applied by hand or machine | Board of 600 by 390 mm, glued with light mortar |
| Thickness | 20 mm minimum, 30 mm per coat | 50 to 160 mm in the brochure |
| Thermal conductivity, W/(m K) | 0.083 | 0.045 (M2) |
| Waiting time | 5 days per 10 mm before the next layer | Glued and reinforced with mortar, then finished |
| Fire class | A1 | A1 |
The plaster insulates less per millimetre and goes on in thin layers. A plaster is therefore a supplement for a wall that can take only a thin layer. It does not replace a board where the aim is a low heat loss.
Which points should you check on the data sheet?
Ask the supplier for the data sheet and the declaration of performance, and check these points before you specify the product:
- the class under EN 998-1 (T1 or T2) and the declared thermal conductivity, with the test method behind it,
- the permitted layer thickness, the thickness per coat and the waiting time between coats,
- the application range, meaning interior or exterior, and the exclusions such as the plinth zone and tile bases,
- the finish system that the maker allows,
- the fire class and the water vapour resistance factor.
The Slovak adoption of the standard is STN EN 998-1, Špecifikácia mált na murivo, Časť 1: Malta na vnútorné a vonkajšie omietky. The catalogue entry covers industrially produced mortar for external and internal rendering. Read the title and the declared class on the product sheet, since the standard title alone gives no product value.
Frequently asked questions
- Can insulating plaster replace an insulation board?
- Rarely. A 30 mm layer of the Baumit ThermoPutz sheet gives about 0.36 m2K/W, while a 100 mm mineral insulation board gives 2.22 m2K/W by the Xella brochure. Use a plaster as a supplement and let the calculation for the building decide.
- What is the thermal conductivity of insulating plaster?
- It depends on the product. EN 998-1 puts T1 mortars at 0.1 W/(m K) or less and T2 mortars at 0.2 W/(m K) or less. The Baumit ThermoPutz sheet gives 0.083 W/(m K). Use the value on the data sheet of your product.
- Can insulating plaster be used outside?
- Some products can. The Baumit ThermoPutz sheet allows interior and exterior use, but it excludes the plinth zone, areas with splashing water and tile bases. The sheet adds that exterior plaster needs a further surface finish.
- How thick can insulating plaster be applied?
- For Baumit ThermoPutz the sheet gives a minimum of 20 mm and a maximum of 30 mm in one coat. Thicker layers go on in coats, with at least 5 days of waiting for each 10 mm of thickness.
- Does insulating plaster crack?
- The Baumit sheet warns that insulating plasters have a higher risk of cracks because of the usual thickness. Reinforcement does not always prevent them. The maker recommends an intermediate coat with glass-fibre mesh before the final finish.
- Is insulating plaster suitable for a historic building?
- The Baumit NHL Thermo page markets a cement-free lime-based plaster for historic and listed buildings. That is a manufacturer statement. The heritage authority decides what may change on a protected building, so check before you specify.
Sources
- Baumit ThermoPutz, Tepelněizolační omítka s perlitem, technický list (18-11-2026) · Baumit, spol. s r.o. · Technické údaje, Použití, Upozornění a všeobecné pokyny, Konečné úpravy v interiéru
- Baumit NHL Thermo ThermoPutz (product page, Austrian version) · Baumit GmbH (baumit.at) · Product description
- Data Sheet 19, A guide to BS EN 998-1 and BS EN 998-2 (Issue 5, October 2023) · Mortar Products Association (MPA Mortar) · Classification of rendering and plastering mortars, thermal conductivity classes
- SIST EN 998-1:2010, Specification for mortar for masonry, Part 1: Rendering and plastering mortar (publisher preview) · iTeh Standards (preview of the Slovenian adoption of EN 998-1:2010) · 3.5.6, 3.7
- STN EN 998-1, Špecifikácia mált na murivo, Časť 1: Malta na vnútorné a vonkajšie omietky (Specification for mortar for masonry, Part 1: Rendering and plastering mortar) · Slovak standards catalogue (normy.normoff.gov.sk, ÚNMS) · Scope
- Ytong Multipor Mineral Insulation Boards, Interior Insulation (brochure) · Xella (copy hosted by Back to Earth Ltd) · Technical data, building physics
- Clima Redboard basic, Mineral Heat Insulation Board Made of Calcium Silicate, Technical Data Sheet (status 12/12/2019) · redstone GmbH & Co. KG · Technical data