Thermal Bridges in a House Renovation: Where and Why

7 min read
The facade of an old brick family house during renovation with scaffolding in front, new white insulation boards being fixed to the wall, a concrete balcony slab projecting from the wall still uninsulated and insulation cut around a window reveal

Why does mould appear after insulation when it never did before?

The house is warmer, the bills are lower, and in the first winter a black patch appears in a window corner. Owners often read this as proof that the insulation does not breathe. The cause is different, and two steps explain it.

The first step is air humidity. An old house with leaky windows ventilated all the time. New windows stop that air exchange, and moisture from cooking, showering and breathing stays in the house. The second step is how temperatures are distributed. Insulation warms the wall area, not every detail. Places where the insulation is missing or interrupted stay colder, and humid air cools down next to them. Mould does not need visible condensation, a surface that stays damp for a long time is enough. So the thermal bridge did not get worse after the renovation. It is the place where the moisture settles. Act 555/2005 includes heat losses caused by the building construction in the energy performance calculation (§ 3 ods. 3 písm. a). Directive (EU) 2024/1275 names thermal bridges among the building characteristics that the calculation methodology covers (Annex I, point 4(a)).

Two conclusions follow. Solve the details together with the wall area, and plan ventilation in the same project. The order of measures is in the article Deep renovation of a house. This page covers the details.

What do ψ, χ and the fRsi factor mean?

The linear thermal transmittance ψ says how much extra heat escapes through one running metre of a junction. Examples are a window, the plinth or the roof edge. The point thermal transmittance χ says the same for one element that pierces the insulation, such as an anchor or a bracket. It enters the calculation by the number of pieces.

Mould risk is judged by the surface temperature at the worst point of a detail. The internal surface temperature factor fRsi is a dimensionless number. It says where the temperature of the coldest spot lies between the outdoor and the indoor temperature. A value close to one means a surface almost as warm as the room air. Annex 1 of decree 364/2012 covers new and renovated buildings. Its thermal assessment includes the minimum internal surface temperature, the risk of mould growth and the dew point. Details are assessed with the surface temperature field method. The numeric limits come from the standard STN 73 0540-2, to which the decree refers in Annex 3. The standard is paywalled, so this page gives no values from it.

For the owner this means one thing. A detail that passed in a dry, leaky house can fail in an airtight house with higher humidity, although nothing on it has changed. Critical details need a calculation during a renovation, not only a drawing.

Where do thermal bridges arise in an older house and how do you treat them?

The same set of places comes up again and again in older masonry houses. Continuous external insulation solves some of them on its own, and not others.

PlaceWhy it is coldTypical remedy
Window reveal and window positionThe window sits in the old masonry plane with thin insulation in the revealInsulation over the frame, window in the plane of the insulation
Cantilevered balcony slabConcrete passes through the wall like a finWrapping on all sides, or cutting off with a structural engineer
Plinth and ground-floor slabA cold strip along the floor around the whole perimeterPerimeter insulation below ground
Wall and roof junctionFacade and roof insulation do not meetConnecting the insulation across the wall crown
Ring beam and lintelsConcrete and steel conduct heat better than brickContinuous external insulation
ETICS anchorsPoint bridges through the insulationRecessed anchors with a cap, the number set by calculation

At the reveal: if the windows are replaced together with the facade, the window goes into the plane of the insulation. The insulation in the jamb then runs over the edge of the frame. It is harder with windows that were replaced a few years ago in the original position. A thinner, higher-performance insulation can help there, but check the idea with a calculation. Before you replace a window that is still new, measure the air humidity and sort out ventilation. Windows are covered in the article Replacing windows in a house renovation.

A cantilevered balcony slab continues the floor slab to the outside and draws heat away like the fin of a radiator. Wrapping it reduces the effect but does not remove it. The full answer is to cut the slab off. Replace it with a balcony on its own columns, or with brackets through a structural thermal break. Removing or adding a balcony changes the look and the size of the building, so ask the building office which procedure applies.

An older house often has an uninsulated ground floor. After insulation the wall is warm and the floor is not, and their junction forms a cold strip. Perimeter insulation taken below ground moves the strip lower and makes it smaller. If you replace the floor, combine insulation from above with perimeter insulation outside.

Which handles thermal bridges better: external or internal insulation?

External insulation. SIEA states that correct insulation on the outside raises the temperature of the inner wall surface. It includes the reveals, lintels and window sills. The required ventilation rate still applies. With insulation on the inside, thermal bridges remain where ceilings and partitions meet the external walls and at openings. SIEA adds that water vapour can condense in the structure and cause mould.

SIEA also writes that internal insulation is often the only way to insulate historic and listed buildings. For such a house, the designer should assess the thermal bridges where ceilings and partitions meet the walls.

Does new waterproofing on a flat roof remove thermal bridges?

No. According to SIEA, laying new waterproofing does not remove existing thermal bridges. They can even get worse, mainly where the roof meets an insulated envelope. For a flat roof renovation, SIEA therefore advises considering insulation of the roof structure as well. If the roof leaks, first have an expert analyse the cause.

How do you fit a window so that it makes no thermal bridge?

A window is a place where several layers meet. SIEA recommends insulating the reveals and lintel up to the window frame, and also the part of the sill below the outer sill board. The insulating foam must fill the whole gap between the window and the structure. Plaster must not go directly on the sealing foam, because the foam does not protect it from indoor moisture.

The layers in the gap must let water vapour out towards the exterior. Use a vapour-tight tape on the inside and a waterproof but vapour-open tape on the outside. Mechanical fixings must hold the window, because foam and adhesive are not enough. SIEA says the best time to replace windows is just before insulation, because replacing them afterwards can damage the insulation in the reveal and lintel.

What does mould on a wall mean and where do you look for the cause?

Where the mould appears often points to the cause. Before you reach for anti-mould paint, compare it with the table. These are likely causes, not a diagnosis.

What you seeLikely causeWhat to check
Mould in a window corner or on the revealUninsulated reveal, window outside the insulation plane, high humidityAir humidity, thermal imaging from inside
Mould in the upper corner along an external wallWall and roof junction, ring beamInsulation over the wall crown, seen from the attic
A dark strip along the floor of an external wallPlinth, uninsulated floorDepth of perimeter insulation, floor build-up
Damp ceiling or floor by the balcony doorCantilevered balcony slabWhether the slab is wrapped on all sides
Mould behind a wardrobe on an external wallCold surface with no air movementMove the furniture away from the wall, measure the surface
Condensation on the glass of every windowHigh air humidity, not a thermal bridgeVentilation, extraction in kitchen and bathroom

When and how should you order thermal imaging?

A thermal camera shows surface temperature, not heat flow. It makes sense only when the difference between outside and inside is large enough. Survey in the heating season, not in rain and not in direct sun. The view from inside is more useful for mould risk. It shows the coldest spots. Shiny surfaces such as glass and metal reflect their surroundings and mislead. Two surveys make sense. Do one before the renovation as input for the design. Do one in the first heating season after it, while defects can still be claimed.

What should you ask the designer for in a renovation?

A renovation project should start from a calculation of the heat loss of the house, based on the thermal properties of the envelope. SIEA says it helps set priorities and the scope of the work. SIEA also lists solving the construction details to minimise thermal bridges among the measures. So ask for a drawing of the reveal, balcony, plinth and wall and roof junction details, and for a calculation of the risky ones. For houses built to higher standards, SIEA also mentions a blower-door test of airtightness.

How do the energy assessment and Obnov Dom treat thermal bridges?

The energy performance calculation takes into account the heat loss caused by the building construction (Act 555/2005, § 3 ods. 3 písm. a). The report attached to the energy performance certificate has two rows for thermal bridges in its thermal protection table. They give the effect ΔU and the added heat loss ΔHTM (Decree 364/2012, Annex 4, Table 1, rows 48 and 49). Ask the designer how detailed the calculation of the junctions is. If you want certainty at the balcony, the reveal or the plinth, order a calculation of exactly those details. The Obnov Dom subsidy has conditions set by the current call, so this page does not give them. The subsidy guide describes the process.

Frequently asked questions

Is it enough to paint over mould in a corner with anti-mould paint after insulation?
Paint hides what you see, not the cause. If the corner is cold and the air is humid, the mould comes back. First find out whether it is a thermal bridge or only high humidity in the room. Then treat the detail or the ventilation. Paint makes sense only afterwards, as a surface clean-up.
Does thicker insulation on the facade help against thermal bridges?
Only a little. Thicker insulation improves the wall area, but a cold detail, such as an uninsulated reveal or a balcony slab, stays cold. It even stands out more, because the surrounding wall is warmer. On a limited budget it pays more to solve the details than to add centimetres to the wall area.
Can a phone thermal camera find thermal bridges?
For a rough search for cold spots from inside, yes, if you use it in the cold season in a heated house. Cheap cameras have low resolution and shiny surfaces easily fool them. They do not replace a professional survey with a report that you can use for a defect claim or as input for a design.
Will heat recovery ventilation solve mould in a window corner?
Controlled ventilation lowers air humidity in the whole house, and with it the risk of mould on cold spots. If a detail is very cold, for example an unwrapped balcony slab, ventilation alone does not solve it completely. The best result comes from a solved detail together with ventilation that keeps humidity within reasonable limits.
What should I do if mould appears in the first winter after renovation?
Document the mould with dated photographs, note the room humidity and write to both the contractor and the designer. The deadlines for a defect claim come from the contract and the law, see the article on taking over a building. Thermal imaging from inside on frosty days helps. Choose a remedy only when it is clear whether the fault is in the detail, the installation or the way you use the house.
Do I need to insulate a loggia that I plan to glaze?
Glazing does not turn a loggia into a heated space. It only protects it a little. The walls, ceiling and floor between the loggia and the flat remain the boundary of the envelope. Insulate them just as you would without glazing. Glazing also changes the look of the building, so ask the building office which procedure applies.
Does insulation on the inside help against thermal bridges?
Only in part. SIEA says that thermal bridges remain where ceilings and partitions meet the external walls and at openings. Water vapour can also condense in the structure. It is often the only way to insulate historic and listed buildings.
Does new waterproofing on a flat roof remove thermal bridges?
No. SIEA says new waterproofing does not remove existing thermal bridges, and they can get worse where the roof meets an insulated envelope. For a flat roof renovation, consider insulating the roof structure as well.

Sources

  1. Zákon č. 555/2005 Z. z. o energetickej hospodárnosti budov a o zmene a doplnení niektorých zákonov · Národná rada Slovenskej republiky, via Slov-Lex · § 3 ods. 3 písm. a
  2. Vyhláška č. 364/2012 Z. z., úplné znenie od 10. 3. 2020, prílohy č. 1 až 9 (PDF) · Slov-Lex, Ministerstvo spravodlivosti SR · Príloha č. 1 bod 1 písm. e, príloha č. 3 poznámka d) a pozn. pod čiarou 2, príloha č. 4 tabuľka 1 riadky 48 a 49
  3. Smernica Európskeho parlamentu a Rady (EÚ) 2024/1275 z 24. apríla 2024 o energetickej hospodárnosti budov (prepracované znenie) · Úradný vestník Európskej únie, via EUR-Lex · Príloha I bod 4 písm. a
  4. Zatepľovanie a výmena okien v rodinných domoch (brochure, May 2018) · Slovenská inovačná a energetická agentúra (SIEA) · Ako dosiahnuť najvyššie úspory tepla, Čo ukáže termokamera, Zásady správnej montáže okien, Zateplenie stien z vnútornej strany, Zatepliť alebo len položiť novú hydroizoláciu

Topic

  • Renovation and subsidies