Classical Orders: How to Read a Facade

8 min read
Illustration: on a timber pallet in a stone conservation workshop stand a short fluted column with a plain Doric-like capital, a Composite capital with Ionic volutes over acanthus leaves and a Corinthian capital with acanthus leaves

What are the classical orders, and how many are there?

A classical order is a set pattern of forms for a column and the beam that it carries. Looking at Buildings, a guide based on the Pevsner Architectural Guides, describes five main orders. These are the Doric with its close cousin the Tuscan, the Ionic, and the Corinthian with its near relation the Composite. Classical orders share codified forms. The shaft tapers upwards with set or limited proportions. The capital is distinctive, and usually the base is too.

In the fourth book of On Architecture, the Roman architect Vitruvius describes three sorts of columns: Doric, Ionic and Corinthian. He calls the Doric the oldest. He gives Tuscan temples a chapter of their own. You will not find the Composite order in his text: Looking at Buildings says the Romans developed it. When orders are stacked floor by floor, the usual sequence from the bottom up is Tuscan, Doric, Ionic, Corinthian and Composite.

How do you tell a Doric, Ionic and Corinthian column apart?

The capital is the fastest clue. You can recognise the Ionic order by its volutes, the spiral scrolls at the sides of the capital. The Corinthian order has a tall basket-shaped capital wrapped in acanthus leaves. Vitruvius adds the legend of Callimachus, whom the Athenians called Catatechnos. He saw a basket on a tomb overgrown with acanthus and made columns of this kind in the country around Corinth. The Composite capital combines both: acanthus leaves below, Ionic volutes above.

The Doric order has two forms. A Roman Doric column has a round capital with a narrow neck band and a plain or fluted shaft, and it stands on a base. A Greek Doric column has a thin, spreading convex capital (the echinus). Its shaft is almost always fluted, and it comes down to the ground with no separate base. The Tuscan order is simpler still and is sometimes hard to tell from Roman Doric. Its frieze is plain and its cornice projects more. It developed from the temples of the Etruscans in central Italy.

OrderCapitalShaft and baseEntablature and character
TuscanSimple, per Vitruvius: abacus, echinus and neckPer Vitruvius, a base with a circular plinth and a torusPlain frieze, strongly projecting cornice
DoricRoman: round with a narrow neck band. Greek: thin spreading convex echinusRoman: plain or fluted, on a base. Greek: fluted, no baseFrieze with triglyphs and metopes
IonicVolutes, sometimes angle volutes turned to the cornerPlain or fluted, Attic baseDentils under the cornice, frieze plain or ornamented
CorinthianTall basket with acanthus leavesPlain or fluted, more slender than IonicElaborate cornice, often a decorated frieze
CompositeAcanthus below, Ionic volutes aboveAs Corinthian, of which it is a richer variantEffect of richness and luxury

What proportions does Vitruvius give for columns?

Vitruvius derives the proportions from the human body. For the Doric column, he says, the first builders measured a man's foot, found it was a sixth of his height. They made the column, capital included, six times as tall as the thickness of the shaft at the base. For the Ionic column they took the female figure as the standard and chose a height of eight times the thickness. Later builders, he says, preferred more slender forms: they gave the Doric column seven diameters and the Ionic eight and a half.

According to Vitruvius the Corinthian column has the same proportions as the Ionic except for the capital. In Book IV the Ionic capital is one third of the shaft diameter in height. The Corinthian capital is a full diameter, so the Corinthian column looks taller and more slender. Book III (ch. 5) gives the Ionic capital with its volutes a height of half a diameter. The table uses the third from Book IV, because only that book compares the Ionic and Corinthian capitals. The Tuscan column is one seventh as thick as it is high. At the top it is one fourth thinner than at the bottom. Its base and capital are each half a diameter high.

OrderColumn height in lower diametersCapital and baseVitruvius
DoricFirst 6, later 7Derived from the male figureBook IV, ch. 1
IonicFirst 8, later 8.5Capital 1/3 of the diameter (Book IV), 1/2 with volutes (Book III)Book IV, ch. 1 and Book III, ch. 5
CorinthianAs Ionic, taller by the capitalCapital 1 diameterBook IV, ch. 1
Tuscan7, one fourth thinner at the topCapital and base 1/2 diameter eachBook IV, ch. 7
CompositeNot given by VitruviusNot given by VitruviusNot given

Vitruvius allows inner columns to have 28 or 32 flutes instead of 24 (Book IV, ch. 4), so that a thinner shaft looks equally thick. Looking at Buildings also mentions entasis, a slight swelling of the shaft that stops the column from appearing to bow inwards in the middle.

What is the entablature, and what are its parts?

The entablature is the horizontal beam that rests on the columns. Looking at Buildings divides it into three bands. The lowest is the architrave, usually left plain. In the middle is the frieze, which may be decorated or sculpted. The top band, which projects furthest, is the cornice, a term sometimes used loosely for the whole entablature. The word architrave is also used for the moulded frame of a door or window, which often borrows the profile of a classical architrave.

Each order has its own entablature. The Doric frieze alternates triglyphs, upright grooved panels, with metopes between them. One triglyph always sits above the axis of a column. The Ionic cornice usually has a row of little blocks, the dentils, under the main overhang, and the frieze can bulge outwards. For the Ionic order Vitruvius recommends a frieze one fourth lower than the architrave. If it carries reliefs, he makes it one fourth higher, so that the carving shows. The Pamiatkový úrad SR methodology on plasters shows that these elements are not only found on temples. In a facade picture it describes triglyphs with guttae and dentils above an entrance portal, formed in plaster on site.

What is the difference between a pediment and a tympanum?

A pediment, according to Looking at Buildings, is a formalised gable derived from that of a classical temple. The Romans also used it decoratively over doors, windows and niches. Besides the triangular form there is the curved, segmental pediment. A broken pediment omits the apex, an open pediment omits the centre of the lower part.

The tympanum is the field inside the pediment. For the Ionic temple Vitruvius sets its height at one ninth of the length of the cornice. The cornices above the tympanum are to equal the one below it. So the pediment is the whole including its cornices, and the tympanum is the field they frame. In medieval architecture the semicircular area above the lintel of a portal is also called a tympanum. Two Slovak examples have a coat of arms in the tympanum. The historical town hall in Košice has a triangular tympanum with the town arms. On Mirbach Palace in Bratislava the tympanum in the central upper part of the facade carries the arms of Count Koloman Nyáry.

What are a portico and a colonnade?

A portico, according to Looking at Buildings, is a porch with a roof, frequently with a pediment, carried by a row of columns. It is named by the number of columns: distyle has two, tetrastyle four, hexastyle six and octostyle eight. A portico often marks the main entrance. A colonnade is a range of columns that carries an entablature without arches. With arches it is an arcade.

The Pamiatkový úrad SR methodology on burgher architecture gives the column portico projecting into the street as an example of a motif of classicism. Classicism, it says, simplified the decoration of street facades but enriched them with motifs that quote antique forms. For the manor houses of the lesser nobility, the methodology says the main entrance is often emphasised by a portico.

How are the orders applied to a flat facade?

Many buildings are unsuited to free-standing columns. Looking at Buildings therefore describes columns set into the wall, half-columns and three-quarter columns. Still more often it describes pilasters, that is a column in shallow relief. The University of Pittsburgh glossary defines a true pilaster as a rectangular vertical element. It projects only slightly from the wall and has a capital and a base.

The Pamiatkový úrad SR methodology says that the Baroque enriched street facades with risalits, pilasters, half-columns or columns. It says the Baroque also enriched window axes with surrounds, aedicules and suprafenestrae (ornaments above the window). For manor houses it says stone was also used for decorative capitals and column bases. Until the 19th century, however, stone on manor facades was usually painted or plastered. On manor houses there can therefore be stone under the paint or plaster.

Where can you find the orders in Slovakia?

The pages that this post relies on name arcades, pilasters, a tympanum and a style for the Slovak buildings, not a specific order. So this post assigns no order to any building. Looking at Buildings says that the Renaissance revived the architecture of antiquity. The Slovak National Museum says that in 1615 the Levoča town hall was renovated and expanded in the Renaissance spirit. It gained arcades on the southern and western sides. An arcade carries arches, not an entablature, so by itself it is not a classical order. The historical town hall in Košice, from 1779–1780, which the city describes as a Baroque and Classic building designed by J. Langer, has a facade richly decorated with pilasters.

The Primate's Palace in Bratislava represents classicism. The Bratislava City Gallery counts it among the most beautiful classicist buildings of the city. Archbishop Cardinal Jozef Batthyány had it built in 1778 to a design by Melchior Hefele. In the 19th century historicism drew on many historical forms. The plaster methodology says that stucco workshops in Budapest, Vienna and Prague produced facade elements in series and offered them through catalogues. How the Secession broke away from this vocabulary is told in the post Secession in Slovakia.

What should you watch for when renovating a classical facade?

If the house is a cultural monument, Act No. 49/2002 Z. z., § 32(2), requires the owner to ask the regional heritage office for a decision on the restoration intent before restoration starts. Under § 32(1), restoration includes maintenance and repair of a part of the monument, even where no notification or permit is needed. If the house is not a monument but stands in a heritage territory, § 32(5) applies. It requires a decision on the intent to alter the property before the work.

The plaster methodology states that preserving the original is the priority. Additions are to respect the original technique, for example pulled profiles or set cast elements. Only qualified specialists may uncover stucco decoration, under the conditions of the regional heritage office, with no rough chiselling and no wire brushes. Removing or relocating elements is not admissible unless technical or historical-aesthetic reasons justify it. The methodology on burgher architecture warns that polystyrene or synthetic paint on a facade is not compatible with the original materials.

Insulation is another conflict. The energy-efficiency methodology says that external insulation is in most cases in conflict with the architectural values of a building. It allows contact insulation only in exceptional cases, on a decision of the regional heritage office. One example is an unarticulated side facade of a building that is not a national cultural monument. Any greater thickness of insulation, it says, shifts the architectural proportions and the depth at which windows sit. The plaster methodology also asks that measures be decided in advance and, where needed, judged on samples.

Frequently asked questions

How many classical orders are there?
There are five main orders: Tuscan, Doric, Ionic, Corinthian and Composite. Looking at Buildings says that the three main orders, Doric, Ionic and Corinthian, are Greek in origin. Tuscan is a simple variant of Roman Doric, and the Romans developed the Composite.
How can I quickly tell an Ionic column from a Corinthian one?
Look at the capital. The Ionic capital has spiral volutes at the sides. The Corinthian capital is tall, basket-shaped and wrapped in acanthus leaves. If you see acanthus below and volutes above, it is a Composite capital.
Does a Doric column have a base?
It depends on the variant. A Roman Doric column stands on a base, a Greek Doric column comes down to the ground with no separate base. Looking at Buildings says the Greek Doric was not properly described or understood in Western Europe until the 18th century.
Why is the Corinthian capital called a basket?
The capital widens upwards like a basket. Vitruvius tells the legend of Callimachus, who saw a basket covered with a tile on a tomb, with acanthus grown up around it. He then made columns after this motif in the country around Corinth. Looking at Buildings calls him a sculptor.
What is a blind portico?
It is the front of a portico, columns or pilasters with a pediment, applied to a wall with no porch behind it. Looking at Buildings says it is also called a temple front.
Do I need a decision to repair a capital or cornice on a monument?
Yes. Act No. 49/2002 Z. z. counts repair of a part of a monument as restoration. Under § 32(2) the owner must ask the regional heritage office for a decision on the restoration intent before work starts. If work starts without it, the office calls on the owner to stop. If the house is not a monument but stands in a heritage territory, § 32(5) requires a decision on the intent to alter the property.
Can I insulate a facade with pilasters from the outside?
On a monument, usually not. The Pamiatkový úrad SR methodology says external insulation is in most cases in conflict with architectural values. It allows contact insulation only in exceptional cases on a decision of the regional heritage office, for example on an unarticulated side facade.

Sources

  1. Vitruvius on Architecture, Book IV (English translation) · LacusCurtius, University of Chicago (Bill Thayer) · Introduction; Chapters 1, 4 and 7
  2. Vitruvius on Architecture, Book III (English translation) · LacusCurtius, University of Chicago (Bill Thayer) · Chapter 5, sections 5, 10 and 12
  3. The Orders · Looking at Buildings (Pevsner Architectural Guides, Buildings Books Trust) · Main text and glossary
  4. Doric and Tuscan · Looking at Buildings (Pevsner Architectural Guides, Buildings Books Trust) · Whole page
  5. Ionic · Looking at Buildings (Pevsner Architectural Guides, Buildings Books Trust) · Whole page and glossary
  6. Corinthian and Composite · Looking at Buildings (Pevsner Architectural Guides, Buildings Books Trust) · Whole page
  7. Conventional Classical Features · Looking at Buildings (Pevsner Architectural Guides, Buildings Books Trust) · Main text and glossary
  8. Glossary of Medieval Art and Architecture: tympanum, pilaster · University of Pittsburgh · Entries TYMPANUM.HTM and PILASTER.HTM
  9. Metodika princípov rozhodovania Pamiatkového úradu SR, časť 7: Meštianska architektúra · Pamiatkový úrad Slovenskej republiky · Fasády; materiály
  10. Metodika princípov rozhodovania Pamiatkového úradu SR, časť 7: Kaštiele a kúrie · Pamiatkový úrad Slovenskej republiky · Typológia; Kameň
  11. Metodika princípov rozhodovania Pamiatkového úradu SR, časť 8: Omietky a fasádne farby · Pamiatkový úrad Slovenskej republiky · Plošné a plastické členenie; 8.2 Plastické štukové členenie a výzdoba
  12. Metodika princípov rozhodovania Pamiatkového úradu SR, časť 11: Energetická efektivita historických stavieb · Pamiatkový úrad Slovenskej republiky · 5.2 Obvodové murivo, exteriér
  13. Zákon č. 49/2002 Z. z. o ochrane pamiatkového fondu (znenie účinné od 1. apríla 2025) · Slov-Lex · § 32 ods. 1, 2 a 5
  14. Anglické tapisérie (Primaciálny palác) · Galéria mesta Bratislavy · Úvod
  15. Mirbach Palace · Galéria mesta Bratislavy · Whole page
  16. The Historical Town Hall · Mesto Košice · Whole page
  17. About the museum (Spiš Museum, Levoča) · Slovenské národné múzeum · Town hall

Topic

  • Architecture and heritage