Pediment
A pediment is a low triangular or segmental gable that cornices frame above a portal, window or the columns of a temple front.
What is a pediment?
A pediment is a low triangular or segmental gable that cornices frame above a portal, window or colonnade. The flat field inside it is the tympanum. In Slovak the element is frontón. The Slovak university script on cornices (Makýš, Krušinský and Šťastný, 2023) defines it as a framed, gable-like superstructure. It usually sits above a window or portal. Its normal shape is a low isosceles triangle or a segment.
The same script says that the cornices form a shape called štít or frontón. The inner surface of the frontón is the štítové pole (gable field). It names the pediment above a window suprafenestra and the pediment above a door or gate supraporta. In classical architecture the pediment crowns the temple front. Vitruvius sets the face of the tympanum over the architrave and the column necks (Book III, chapter 5, section 12). So it stands above the entablature. For the beam above the columns, see architrave.
What are the parts of a pediment?
The script breaks the element into a frame and a field. The table lists the terms it uses.
| Term | What the Slovak script says |
|---|---|
| Frontón (pediment) | A framed, gable-like superstructure, usually above a window or portal |
| Tympanon (tympanum) | The filling of the pediment |
| Štítová rímsa (raking cornice) | Frames the sloping edges of the tympanum, usually with a triangular cross-section |
| Pätová štítová rímsa (base cornice) | Bounds the lower horizontal edge of the tympanum |
| Štítové pole (gable field) | The inner surface of the pediment |
The script notes that larger gable fields that project from the facade often carry inscriptions or allegorical reliefs. It also separates the pediment from a small roof-like cover. Sloping structures over doors and windows, often clad in sheet metal, are not called cornices but zastrešenia (roof covers).
How do Baroque pediments differ from classical ones?
The script states that alternating triangular and segmental pediments were very common in the Baroque, and that the frontón was frequent in classicism. Its drawings show both forms over a window: Fig. 151 A has an arched cornice and Fig. 151 B a triangular one. A segmental pediment replaces the two straight sloping sides with a curve. When you survey an older Slovak facade, check the outline first, because the triangle and the segment can both be original.
What does Vitruvius say about the pediment?
Vitruvius, in the translation on LacusCurtius, gives several rules that touch the pediment. They concern temple fronts, so they are a historical reference for a house.
| Element | Treatment given by Vitruvius | Place |
|---|---|---|
| Tympanum height, Ionic front | One ninth of the length of the corona, measured from one end of its cymatium to the other | Book III, 5.12 |
| Face of the tympanum | Stands perpendicularly over the architrave and the column necks | Book III, 5.12 |
| Cornices of the pediment | Coronae only, with no mutuli or dentils | Book IV, 2.5 |
| Corona over the triglyph capitals | Half a module high with its cymatia | Book IV, 3.6 and 3.8 |
| Tympanum and cornices of Doric buildings | Made like those of Ionic buildings | Book IV, 3.6 |
| Space under the pediment | Equal to three triglyphs and three metopes in one Doric layout | Book IV, 3.8 |
Vitruvius explains the corona rule from timber building. Dentils copy the common rafters and mutuli copy the principal rafters, and neither kind of rafter projects on the front of a pediment. So the ancients used coronae only in the pediment cornices (Book IV, chapter 2, section 5). He adds that all members over the column capitals, among them architraves, friezes and tympana, should lean forward by one twelfth of their height. Then they look vertical from below (Book III, chapter 5, section 13).
How high is a pediment?
The two sources give two different figures, because they describe different elements. In the Slovak script's illustrated examples of small pediments over windows and doors, the height is one sixth of the width. Vitruvius sets a flatter temple pediment, one ninth of the length of the corona. The script states no binding rule. It says only that a flatter roof cover over a pediment looks better than a high, steep one.
The script also warns against one detail. The base of a small pediment over an opening should not have the full profile of a crown cornice that juts out. The script says to leave out the projecting garniža of the base cornice, as in its Fig. 151 B.
What are the common misconceptions about pediments?
- Calling the whole element a tympanum. The tympanum is only the filling. The script says that tympanon is sometimes wrongly used for a pediment above a projecting bay or a facade.
- Assuming every pediment is triangular. Segmental pediments were common in the Baroque, so check the outline before you describe a facade.
- Putting dentils in the pediment cornice. Vitruvius says that neither mutuli nor dentils belong in the cornices of a pediment, only coronae.
- Mixing up the two meanings of štít. The script uses štít for the shape that the cornices form. The same word also names a roof gable, so the context decides. For the roof element see gable wall.
Does a modern house need a pediment?
No source used here requires one. The pediment is a historical facade form that a designer can choose. If you specify one, list the raking cornice, the base cornice and the gable field as separate items, the way the Slovak script itself does. Link the finish of the cornice profile to the cornice details, and see the Doric order for the classical layout under a temple pediment.
Frequently asked questions
- What is the difference between a pediment and a tympanum?
- The pediment is the whole framed gable, including its cornices. The tympanum is only the field inside it. The Slovak university script on cornices says that tympanon is the filling of the pediment. Using it for a pediment above a projecting bay or a facade is incorrect.
- What is frontón in Slovak?
- Frontón is the Slovak word for the pediment. The script defines it as a framed, gable-like superstructure. It usually sits above a window or portal. Its normal shape is a low isosceles triangle or a segment. The same script also says that the cornices form a shape called štít or frontón.
- Were all Baroque pediments triangular?
- No. The script says that triangular and segmental pediments alternated and that this was very common in the Baroque. It adds that the frontón was also frequent in classicism. A segmental pediment has a curved top instead of two straight sloping sides.
- How high is a pediment?
- The sources set no binding rule for a house. In the script's drawings for small pediments over windows and doors, the height is one sixth of the width. For a temple front, Vitruvius sets the tympanum height at one ninth of the length of the corona (Book III, chapter 5, section 12).
- Does a modern house need a pediment?
- No source used here requires one. The Slovak script treats the pediment as a decorative facade form. It asks only that the roof cover over a window pediment be flatter rather than steep.
Sources
- Realizácia ríms v 16. až 19. storočí (Realisation of cornices in the 16th to 19th centuries), Edícia skrípt Historické stavebné technológie a materiály · Slovenská technická univerzita v Bratislave, Stavebná fakulta (Oto Makýš, Peter Krušinský, Patrik Šťastný), 2023 · Section 3.1.1 (contents p. 21, text p. 24). footnote 27 on frontón (p. 50). pediment, štít and gable field text with Fig. 151 A to C (p. 55)
- Vitruvius, The Ten Books on Architecture, Book IV (English translation) · Bill Thayer, LacusCurtius (University of Chicago Penelope site) · Book IV, chapter 2, section 5. chapter 3, sections 6 and 8
- Vitruvius, The Ten Books on Architecture, Book III (chapter 5, Ionic order) · Bill Thayer, LacusCurtius (University of Chicago Penelope site) · Book III, chapter 5, sections 12 and 13