Architrave

An architrave is the lowest band of a classical entablature, which rests on the column capitals and carries the frieze.

An architrave is the lowest band of a classical entablature, the horizontal member that rests on the column capitals. The Slovak term is architráv. The word also names the band that runs around a door or window opening, so this article covers both meanings.

What is an architrave in a classical building?

The architrave is the lowest of the three main parts of a classical entablature, the horizontal assembly that the columns carry. The Getty Art and Architecture Thesaurus describes it as a horizontal beam that spans columns or piers like a lintel. It rests on the abacus of a column. The other two parts are the frieze and the cornice.

The English translation of Vitruvius that this article uses glosses the Latin epistylia as architraves. This happens where the text turns to their proportions (Book III, chapter 5, section 8). For the Doric order, Vitruvius says the width of the underside of the architrave should match the thickness of the column at the necking. He places the triglyphs and metopes above it (Book IV, chapter 3, section 4). For the Ionic order, the underside is as wide as the upper diameter of the column. The upper edge is as wide as the lower diameter (Book III, chapter 5, section 9). For the wider system of parts, see entablature. Each order has its own column rules, as the Ionic order page shows.

How does the architrave fit into the entablature?

In Vitruvius's Ionic rules, a frieze, a dentil band and a cornice follow the architrave upward. The height of the architrave is not one fixed figure. It depends on the height of the column, so the same band is deeper on a tall column than on a short one. The table sets out the passages this article relies on.

Source passageOrderRule as written
Book III, chapter 5, section 8IonicLowest class of columns: architrave half the diameter of the column
Book III, chapter 5, section 8IonicMiddle class: column height divided into 13 parts, architrave takes one
Book III, chapter 5, section 8IonicTallest class given: column height divided into 12 and a half parts, architrave takes one
Book III, chapter 5, section 10IonicAfter the cymatium, the rest divided into 12 parts: 3 to the lower fascia, 4 to the middle, 5 to the upper
Book IV, chapter 3, section 4DoricArchitrave with taenia and guttae equals one module. The taenia is one seventh of a module

Vitruvius gives these as rules for temple columns, so for a house they are a historical reference and not a measured standard.

Why does the Ionic architrave have three bands?

Vitruvius divides the Ionic architrave into twelve parts after he takes out the cymatium. The lower fascia takes three, the middle one takes four, and the upper one takes five. The cymatium itself is one seventh of the whole height (Book III, chapter 5, section 10). The dentil band above the frieze has the height of the middle fascia (section 11). The Doric architrave is different. It has a taenia with guttae beneath it and no set of fasciae (Book IV, chapter 3, section 4). The Encyclopaedia Romana entry on the Ionic order also describes the Ionic architrave as divided into three bands, each projecting beyond the other.

How does the Doric architrave differ from the Ionic one?

The two orders start from different units. Vitruvius divides the front of a Doric temple into 27 parts if it is tetrastyle, or 42 if it is hexastyle. One part is the module (Book IV, chapter 3, section 3). The Ionic architrave is set against the column height instead. The table compares the two orders on the passages above.

FeatureDoricIonic
Unit used for setting outModule: one of 27 parts (tetrastyle) or 42 parts (hexastyle) of the frontThe column height, divided into parts
Architrave heightOne module, including taenia and guttaeHalf the column diameter, or one part in 13, or one part in 12 and a half of the column height
Division of the bandTaenia one seventh of a module. Guttae one sixth of a module longThree fasciae in the proportion 3, 4 and 5 of twelve parts
Element aboveTriglyphs and metopesFrieze, then dentil band

The module is a relative unit. The Doric figures give no length in metres until a module size is chosen.

What is an architrave around a door or window?

The word also names the band around a door or window opening. The Getty thesaurus does not apply the classical entry to this meaning. For the architrave-like moulded frame around a door or window, it sends users to the separate term architrave trim. The classical member is a horizontal beam that columns carry. The door band is a surround fixed to the wall at an opening.

The Slovak university script on cornices quotes a Renaissance text on this. It says that the ornaments around windows and doors divide into architraves, friezes and cornices. The architraves run around the door and are as thick as the jambs. They should be no smaller than one sixth and no larger than one fifth of the clear width of the opening. The sizes of the frieze and cornice follow from them. This is one historical rule and not a requirement today. The script gives no modern rule for door trim.

How do I tell which meaning a drawing intends?

Check what the drawing shows. A column with a capital and a beam above it is the classical meaning. A band that runs around the edge of a wall opening is the door and window meaning. Ask which element is meant before you order material, because the Getty entries treat them as two separate terms.

Frequently asked questions

What is the difference between an architrave and a lintel?
A lintel is the horizontal member that spans a wall opening. The Pitt medieval art glossary defines the architrave as a lintel or flat horizontal member that spans the space between columns. It adds that in classical architecture it is the lowest member of an entablature.
What is the Slovak term for architrave?
The Slovak term is architráv. The Slovak university script on cornices uses the same word for the beam over a row of columns. In a quoted Renaissance text it also uses the word for the band that runs around a door. The context tells the reader which meaning applies.
How tall is an architrave on a classical column?
Vitruvius gives ratios, not one fixed height. In the Ionic order the architrave is half the column diameter for the lowest columns. For the next class of columns it is one thirteenth of the column height. These are rules for temple columns, not measured standards.
Does a door architrave have to follow classical proportions?
No source used here requires it. The Slovak script quotes a Renaissance rule. A door architrave should be as thick as the jambs, and between one sixth and one fifth of the clear width of the opening.
Which order places triglyphs above the architrave?
The Doric order. Vitruvius places the triglyphs and metopes above the Doric architrave. The Ionic architrave carries a frieze and then a dentil band.

Sources

  1. Vitruvius, The Ten Books on Architecture, Book III (chapter 5, Ionic order) · Bill Thayer, LacusCurtius (University of Chicago Penelope site) · Book III, chapter 5, sections 8 to 11
  2. Vitruvius, The Ten Books on Architecture, Book IV (English translation) · Bill Thayer, LacusCurtius (University of Chicago Penelope site) · Book IV, chapter 3, sections 3 and 4
  3. Ionic order (Encyclopaedia Romana) · University of Chicago, Penelope project
  4. Art and Architecture Thesaurus: architraves (entablature) · Getty Research Institute, Getty Vocabularies
  5. Glossary of terms for Medieval Art and Architecture · University of Pittsburgh, Department of History of Art
  6. Realizácia ríms v 16. až 19. storočí (Realisation of cornices in the 16th to 19th centuries), Edícia skrípt Historické stavebné technológie a materiály · Slovenská technická univerzita v Bratislave, Stavebná fakulta (Oto Makýš, Peter Krušinský, Patrik Šťastný), 2023 · Chapter 8, quoted passage on ornaments around doors and windows (p. 46 to 47, Fig. 8.1)