Tuscan Order
The Tuscan order is a plain classical column order with a base and an unfluted shaft, which Vitruvius describes for temples.
The Tuscan order is a plain classical column order with a base, an unfluted shaft and a simple capital. Vitruvius describes it in Book IV, chapter 7 of De Architectura, as part of the Tuscan temple. His text gives the column and its capital in detail but leaves the entablature open, so later writers filled the gap in different ways. This page labels each figure with its source. A reference such as IV.7.3 means Book IV, chapter 7, section 3 in the LacusCurtius edition, which is Joseph Gwilt's 1826 translation.
What is the Tuscan order?
At the end of his chapters on Doric, Ionic and Corinthian temples, Vitruvius announces that he will "treat of the arrangement of Tuscan temples" (IV.6.6). The Encyclopaedia Romana describes the Tuscan order as derived from the Doric, with an unfluted column that rests on a circular base, a torus, and not directly on the stylobate. Smith's Dictionary of Greek and Roman Antiquities (1875) goes further. It calls the order a modification of the Roman Doric, stripped of its ornaments. Our Doric order entry covers the Doric rules.
Where did the Tuscan order come from?
The Metropolitan Museum's Heilbrunn Timeline links the order to the Etruscans. It dates the Etruscan Portonaccio Temple at Veii (present-day Veio) to about 500 BC. It describes a rectangular building with a single inner room, or cella, and a deep porch supported by columns in the "Tuscan" order.
The sources do not fully agree. Smith's dictionary says the Tuscan order is known to us only from Vitruvius's description, because no ancient example of it has been preserved. The Met applies the name "Tuscan", in quotation marks, to the porch columns of an Etruscan temple. Vitruvius does not mention Veii. Of the sources used here, only the Met ties the order to a dated Etruscan building.
What proportions did Vitruvius set for the Tuscan column?
Vitruvius works from the lower diameter of the column. The table lists what he gives in IV.7.2 to IV.7.4.
| Element | Rule in Vitruvius | Where |
|---|---|---|
| Lower thickness | One seventh of the height, so seven diameters high | IV.7.2 |
| Height against the temple | One third of the width of the temple | IV.7.2 |
| Thickness at the top | One fourth less than at the bottom | IV.7.2 |
| Base | Half a diameter high, with a circular plinth half as high as the base | IV.7.3 |
| Capital | Half a diameter high, in three parts: abacus, echinus, neck | IV.7.3 |
| Abacus | As wide as the lower diameter of the column | IV.7.3 |
| Mutules | Project one fourth of the column height above the beams and walls | IV.7.4 |
The text does not say whether the seven diameters include the base and the capital. The rules form a chain. The lower diameter sets the base, the capital and the abacus, and the column height sets the overhang of the mutules.
What does Vitruvius leave out?
He gives no heights for an architrave, a frieze or a cornice. In his Tuscan temple the beams over the columns are laid in coupled pairs, joined with dovetailed dowels, with a gap of two inches between them. The mutules project above them, and the pediment is of masonry or timber (IV.7.4). He mentions no triglyphs. This is why a drawing of a full stone Tuscan order needs a second source.
How did Serlio and Vignola set out the Tuscan order?
Two sixteenth-century treatises codified the orders for builders. Serlio's Regole generali (Venice, 1551) says the Tuscan column is made seven parts high, with base and capital, each part equal to the lower thickness. He cites Vitruvius's seventh chapter for it. In the same text the base is half the column's thickness high, and the capital is the same height as the base. The shaft diminishes by a quarter. The 1552 Spanish edition of Serlio's fourth book then sets the architrave, the frieze and the cornice each as tall as the capital.
Vignola's Regola delli cinque ordini, in the 1889 Juglaris and Locke translation, also gives the Tuscan column seven diameters including base and capital. It sets the capital at one modulus, which is half the lower diameter, and the entablature at three and a half moduli, one quarter of the base, column and capital together. The architrave is one modulus high.
| Source | Column height | Capital | Entablature |
|---|---|---|---|
| Vitruvius, IV.7 | Seven diameters, base and capital not stated | Half a diameter | Wooden beams, no heights |
| Serlio, 1551 and 1552 editions | Seven diameters with base and capital | As tall as the base, which is half the thickness | Architrave, frieze and cornice each as tall as the capital |
| Vignola, 1889 translation | Seven diameters with base and capital | One modulus, half a diameter | Three and a half moduli, a quarter of the column with base and capital |
The three sources agree on the column. They differ on the entablature, which is the part Vitruvius left open. Serlio gives a lower entablature than Vignola: about one and a half diameters against one and three quarters.
How is the Tuscan order different from the Doric order?
Vitruvius treats the Tuscan in its own chapter with its own ratios, so keep the two sets of numbers apart. His Tuscan column has a base, and the Encyclopaedia Romana says the Doric column has none. His Tuscan top is wooden beams and mutules with no triglyphs, and the Doric frieze alternates triglyphs and metopes (IV.3.4). The Tuscan column is seven diameters high and so is the later Doric, so the shaft ratio alone does not tell them apart. Look at the base and the frieze.
Can a house use the Vitruvian Tuscan rules?
Vitruvius wrote the rules for a temple, which is why the column height is tied to the width of the temple. A house, a porch or a gate has a different width, so the rule of one third of the width does not carry over. The ratios that depend only on the diameter, such as the base and capital at half a diameter each, can serve as a reference. The column and entablature entries explain the parts these measurements refer to. For the richer orders, see the Ionic order and the Corinthian order.
Frequently asked questions
- What proportions did Vitruvius set for the Tuscan column?
- The column is seven diameters high, because its lower thickness is one seventh of its height (IV.7.2). The base and the capital are each half a diameter high and the abacus is as wide as the lower diameter (IV.7.3).
- How is the Tuscan order different from the Doric order?
- The Tuscan column has a base and, in Vitruvius, a wooden top with mutules and no triglyphs (IV.7.3 and IV.7.4). The Encyclopaedia Romana says the Doric column has no base, and the Doric frieze has triglyphs and metopes.
- Where does the Tuscan order come from?
- The Met's timeline links it to the Etruscans. It describes the Etruscan Portonaccio Temple at Veii, about 500 BC, as having porch columns in the "Tuscan" order. Vitruvius gives the rules in Book IV, chapter 7.
- Is there an ancient building in the Tuscan order?
- The sources differ. Smith's 1875 dictionary says no ancient example survives, and the order is known from Vitruvius. The Met describes the Portonaccio porch columns as "Tuscan", but Vitruvius does not mention that temple.
- Do Serlio and Vignola agree with Vitruvius on the Tuscan column?
- On the column, yes. Serlio and Vignola both give seven diameters including base and capital. They differ on the entablature, which Vitruvius leaves open: Serlio sets each member as tall as the capital, and Vignola sets the whole at three and a half moduli.
- Can I use Vitruvius's Tuscan proportions on a house?
- Use the diameter-based ratios as a reference. Vitruvius wrote the rules for temples and ties the column height to the temple width (IV.7.2), which does not carry over to a house.
Sources
- Vitruvius, De Architectura (On Architecture), Book IV, Joseph Gwilt translation (1826), LacusCurtius edition by Bill Thayer · LacusCurtius, University of Chicago (Penelope) · Book IV, chapter 3 section 4; chapter 6 section 6; chapter 7 sections 1 to 4
- Roman Architecture (Encyclopaedia Romana, temple architecture) · University of Chicago, Penelope, Encyclopaedia Romana
- Ionic Order (Encyclopaedia Romana) · University of Chicago, Penelope
- The Column in Greek and Roman Architecture (Smith's Dictionary of Greek and Roman Antiquities, 1875) · LacusCurtius, University of Chicago (Penelope)
- Italian Peninsula, 1000 B.C.-1 A.D. · The Metropolitan Museum of Art, Heilbrunn Timeline of Art History
- Regole generali di architettura sopra le cinque maniere de gliedifici (Sebastiano Serlio, Venice, 1551), Libro quarto, chapter V · Internet Archive (digitised copy) · Libro quarto, chapter V, Of the Tuscan work and its ornaments
- Tercero y cuarto libros de arquitectura (Sebastiano Serlio, Spanish translation, 1552) · Internet Archive (digitised copy) · Libro quarto, chapter VI, Of the Tuscan order and its ornament
- The Five Orders of Architecture by Giacomo Barozzi of Vignola (translated by Tommaso Juglaris and Warren Locke, Boston, 1889) · Internet Archive (digitised copy) · Plates III and IV, the Tuscan capital and entablature