Entablature

The entablature is the horizontal band above a classical order's columns, made of an architrave, a frieze and a cornice from bottom to top.

What is an entablature?

An entablature is the horizontal band that sits on the columns of a classical order and carries the roof or the upper storey. It has three parts, stacked from bottom to top: the architrave, the frieze and the cornice. An open textbook from the University of Illinois says: "The entablature also has three parts: the architrave, the frieze, and the cornice." The same textbook says an order has two principal parts, the column and the entablature. The Slovak word is kladie, and this article uses the English term.

Where does the entablature sit in a classical order?

The Illinois textbook splits an order into the column, with its base, shaft and capital, and the entablature above it. The entablature is the horizontal spanning member, and the column is the vertical supporting member. Vitruvius wrote On Architecture, the oldest surviving ancient account of the orders. He sets out the Ionic rules in Book III and the Doric and Corinthian rules in Book IV.

Where does the entablature come from?

Vitruvius links the Doric entablature to timber building. In Book IV, chapter 2, he says builders imitated in stone and marble the arrangement of timbers in earlier wooden temples. Beams ran over the wall and their ends stuck out. Builders cut the ends off flush and fixed grooved tablets over them. He says these tablets gave rise to the triglyph, and the gaps between the beam ends gave the metope. The projecting rafter feet gave the mutules under the corona. In the Ionic order he says the dentils imitate the projecting common rafters.

This is Vitruvius's own account. This page treats it as his explanation and not as a dated record.

What are the proportions of a Doric entablature?

Vitruvius gives Doric proportions in modules. A module is a unit taken from the building itself. In Book IV, chapter 3, he divides the front of a temple into 27 or 42 parts, by column count. He calls one part a module. The column is two modules thick and fourteen modules high, capital included. The table lists the heights the passage gives for the entablature. The last column is arithmetic for this page, not a quotation.

Part (Doric, Vitruvius IV.3.4 to IV.3.6)Height in modules
Column, capital included14
Architrave with its tænia and guttae1
Metopes in the frieze1.5
Capitals of the triglyphs1/6
Corona with its two cymatia1/2
Sum of the entablature parts given (calculated)3 1/6

The sum is 1 + 1.5 + 1/6 + 1/2 = 3 1/6 modules. Dividing the column height by that sum gives 14 ÷ 3 1/6, about 4.4 to 1. This is a low estimate of the entablature height. Vitruvius gives no height for the simae and leaves them to the Ionic rules. The real ratio is therefore a little smaller than 4.4 to 1.

The Illinois textbook shows the orders as Vignola drew them. In that drawing "the relationship between the height of the column and its entablature is four to one". That is one drawing by one author. The text says the proportions of the orders vary from structure to structure and from age to age.

How do the Doric, Ionic and Corinthian entablatures differ?

The Encyclopaedia Romana, a University of Chicago reference, says the Greeks gave each order its own entablature. It describes "the Doric with its frieze of alternating triglyphs and metopes". It describes the Ionic and Corinthian as a frieze crowned by small blocks, called dentils, over a stepped architrave. It says the Romans were less conventional and often combined elements from different orders.

Vitruvius agrees on the main points. The Doric architrave carries a fillet, the tænia, and a row of pegs, the guttae. For the Ionic order he names a sculptured frieze, dentils and a cornice. For the Corinthian he says there are no settled rules of its own. He takes the cornice and other members from the Doric or Ionic by analogy.

OrderArchitraveFriezeCornice
DoricFillet and guttae (IV.3.4)Triglyphs alternating with metopesCorona with cymatia, guttae in the soffit (IV.3.6)
IonicStepped, per Encyclopaedia RomanaSculptured, with dentils (IV.1.2)Cornice above the dentils (IV.1.2)
CorinthianBorrowed from the Doric or IonicBorrowedBorrowed, by analogy (IV.1.2)

Book IV gives no heights for the Ionic entablature. For the taper of the Ionic column, Vitruvius sends the reader back to the third book.

How is the entablature different from the cornice and the pediment?

The cornice is the top band of the entablature. The entablature is the whole three-part band. The pediment is a different element, the triangular gable that sits above the entablature on a temple front. To read a classical facade, find the three bands first, then look for a gable above them.

The Doric architrave in Vitruvius is a plain band with a fillet and pegs. It is not sculpted. Carved decoration is therefore not the test of an entablature. The test is whether the three bands sit in the right order above the column and capital.

Frequently asked questions

What are the three parts of an entablature?
From bottom to top, the architrave, the frieze and the cornice. The architrave sits directly on the column capitals, the frieze is the middle band, and the cornice is the projecting top band.
What are the Doric entablature heights in Vitruvius?
The architrave is one module. The metopes of the frieze are one and a half modules. The corona with its cymatia is half a module. The column is fourteen modules high (Book IV, chapter 3).
How tall is the entablature compared with the column?
The Vitruvian Doric parts add up to 3 1/6 modules against a 14-module column, about 4.4 to 1. The simae would make it taller. The Illinois textbook shows Vignola at four to one.
Is an entablature the same as a cornice?
No. The cornice is the top part of the entablature. The entablature is the whole three-part band above the columns.
What is a module in Vitruvius?
A unit of measure taken from the building. In the Doric rules the column is two modules thick, so one module is half the column thickness.
Why does the Doric frieze have triglyphs?
Vitruvius says the triglyphs imitate the grooved tablets that early builders fixed over the cut ends of timber beams. The gaps between the beam ends gave the metopes.

Sources

  1. Vitruvius, On Architecture, Book IV (English translation) · LacusCurtius, University of Chicago (Thayer) · Book IV, chapter 1 section 2, chapter 2 sections 1 to 5, chapter 3 sections 3 to 6
  2. The Orders (open textbook chapter, Design and the Built Environment) · University of Illinois Urbana-Champaign, Illinois Open Publishing Network · The Orders, introduction and figure 5.1.3
  3. Entablature (Encyclopaedia Romana entry) · University of Chicago (Penelope, Encyclopaedia Romana)