Doric Order

The Doric order is the plainest Greek column order, with a fluted shaft, a simple capital and a frieze of triglyphs and metopes.

The Doric order is the plainest of the three Greek column orders, with a fluted shaft, a simple capital and a triglyph frieze. Vitruvius, the Roman author of De Architectura, says it took its name from the cities of Doria, where Ionian colonists first saw this kind of temple. This page follows his Book IV, names the section for each figure, and says where his own text disagrees with itself. A reference such as IV.3.4 means Book IV, chapter 3, section 4 in the LacusCurtius edition, which is Joseph Gwilt's 1826 translation.

What is the Doric order and where did it come from?

Vitruvius calls the Doric the oldest of the three orders. He says Dorus, son of Hellen, built a temple of this type at Argos, and that similar temples followed in Achaia before anyone had fixed their proportions (IV.1.3). Later, he says, the Ionian colonists in Asia Minor built a temple to Apollo Panionios that copied the Achaian type. They named it Doric because they had first seen it in the cities of Doria (IV.1.4 to 5).

The Bryn Mawr Classical Review, in a review of Barletta's study of the orders, gives a different kind of evidence. It reports the author's view that the Doric order does not appear before about 580 to 570 BC. Vitruvius tells a founding story, and the review reports a dating from surviving buildings.

How are Doric proportions set out in Vitruvius?

Vitruvius gives the early proportions as a story. The first Doric temple used a column six times as high as the thickness of its shaft, a ratio he links to the length of a man's foot, which is a sixth of a man's height (IV.1.6). The temple of Diana used eight diameters, a ratio he links to a woman's figure (IV.1.7). Later builders preferred a more slender shape and gave the Doric column seven diameters and the Ionic eight and a half (IV.1.8).

His detailed rules for a Doric temple then work in modules. The front of the temple is divided into 27 parts for four columns or 42 parts for six, and one part is the module (IV.3.3). The column is two modules thick and fourteen modules high, which is the same seven-diameter ratio. The figures below are his prescriptions, which he says he took from his masters (IV.3.3). They are not measurements of surviving buildings.

ElementVitruvius's figureWhere
Column of the first Doric templesix lower thicknesses high, including the capitalIV.1.6
Later Doric columnseven lower thicknesses highIV.1.8
Column in the module systemtwo modules thick, fourteen modules highIV.3.4
Capitalone module high, one and one sixth modules wideIV.3.4
Architraveone module highIV.3.4
Shaftworked in twenty faces, then flutedIV.3.9
Metopeone module wide and one and a half modules highIV.3.4
Metope, as set out elsewhereas long as it is high (square)IV.3.2 and IV.3.5

The last two rows cannot both hold. One metope cannot be one module wide and one and a half modules high and also be square. The square metope is the shape he states twice, in IV.3.2 and IV.3.5. In this edition the rule in IV.3.4 is the odd one out, so check the figure against a second edition before you draw from it.

These are Vitruvius's ratios and not "the" Doric rule. Vignola, in the 1889 Juglaris and Locke translation of his treatise, gives the Doric column a base one modulus high, a shaft of fourteen moduli and a capital of one modulus. That is sixteen moduli, or eight diameters with base and capital, taking his modulus as half the lower diameter. His Doric column also has a base, which the Encyclopaedia Romana says the Greek Doric column lacked. Always state which author a Doric ratio follows.

What do triglyphs and metopes do in the Doric frieze?

The triglyph is a block of flat faces separated by two full vertical channels, with a half channel at each edge (IV.3.5). The metope is the space between two triglyphs. The Encyclopaedia Romana adds that triglyphs were painted blue and metopes red.

Vitruvius explains the pattern as a memory of timber building. Carpenters cut off the projecting ends of the roof beams and hid them with indented tablets painted with blue wax, and these gave rise to the triglyph and the metope (IV.2.2). The projecting rafters gave rise to the mutules under the cornice (IV.2.3). He rejects a rival theory that triglyphs began as windows (IV.2.4). The Cambridge University Press volume The Making of the Doric Temple notes that this wooden-origin explanation of the Doric order has long been questioned. Treat the timber story as his interpretation.

What is the Doric corner problem?

Triglyphs must stand centrally over the columns. At the corner of the building the last triglyph sits at the end of the frieze and not over the centre of the corner column. The metope next to it is then wider than the others by half a triglyph's width. A builder who wants equal metopes can instead shorten the corner intercolumniation by half a triglyph (IV.3.2). Vitruvius calls both fixes a false method. He says this is why the ancient architects appear to have avoided the Doric order in sacred buildings, and he names Tarchesius, Pitheus and Hermogenes as holding that view (IV.3.1 to 2).

He then gives his own layout, with half-metopes half a module wide at the extreme angles, and says it remedies the defects of the metopes and intercolumniations (IV.3.5). The Encyclopaedia Romana also describes this problem as the Doric angle contraction.

How does the Doric order differ from the Ionic and Corinthian orders?

The Doric is the sturdiest of the three. It has the shortest column and, in the Encyclopaedia Romana's account, no base. Its cornice has mutules, the sloping blocks that imitate the feet of rafters. In the Ionic order the same place carries dentils, which Vitruvius says imitate the projection of the common rafters (IV.2.5). He adds that the Greeks never put dentils below mutules. The Corinthian column has the Ionic proportion with a taller capital, and its cornice is borrowed from the Doric or the Ionic (IV.1.1 to 2).

FeatureDoricIonicCorinthian
Column height in lower diameters7 (IV.1.8)8.5 (IV.1.8)Same as the Ionic (IV.1.1)
Capital heightOne module, half a diameter (IV.3.4)One third of a diameter (IV.1.1)One full diameter (IV.1.1)
Cornice detailMutules (IV.2.3)Dentils (IV.2.5)Borrowed from Doric or Ionic (IV.1.2)
ShaftTwenty faces (IV.3.9)Twenty-four flutes (III.5.14)Not compared here

How does the Doric order look on a built Greek temple?

The Parthenon on the Athenian Acropolis is a Doric temple. The Perseus Digital Library record at Tufts University dates it to about 447 to 432 BC and lists its architects as Iktinos, Kallikrates and Pheidias. A Fairfield University course page names Ictinus and Callicrates and gives the same years. The Perseus record classes it as a Doric peripteral temple with eight columns across the front and seventeen along the flanks. It gives the exterior columns a lower diameter of 1.91 m, or 1.95 m at the corners, and a height of 10.43 m, with an entablature 3.30 m high.

Dividing the column height by the diameter gives about 5.5, well below Vitruvius's seven. The record does not say whether the height includes the capital, so treat the comparison as indicative. On these figures the Parthenon is sturdier than the later, more slender proportion that Vitruvius calls the standard.

Feature of the ParthenonValue
Dateabout 447 to 432 BC
PlanDoric peripteral temple, 8 by 17 columns
Lower diameter of exterior columns1.91 m (1.95 m at the corners)
Height of exterior columns10.43 m
Height of entablature3.30 m

How did the Doric order continue in Roman architecture?

The Encyclopaedia Romana says the Corinthian order predominated in Roman architecture, while the Doric was used for colonnaded porticoes. Its example is the Basilica Aemilia in Rome, where the short ends were Doric, with triglyphs separating metopes decorated with alternating ox skulls and libation bowls. Vitruvius treats the Tuscan order in its own chapter, IV.7. For its rules, see the Tuscan order.

For the other two Greek orders, see the Ionic order and the Corinthian order. The entablature entry explains the architrave, frieze and cornice that sit on a Doric column.

Frequently asked questions

What is the difference between the Doric and the Tuscan order?
In Vitruvius the Tuscan column has a base half a diameter high (IV.7.3), and his chapter on Tuscan temples describes wooden beams and mutules and no triglyphs (IV.7.4). The Doric frieze has triglyphs and metopes, and the Encyclopaedia Romana says the Doric column has no base.
How many diameters high is a Doric column?
Vitruvius gives seven lower diameters for the later Doric column (IV.1.8). In his module rules it is fourteen modules high and two thick (IV.3.4). His story of the first temples gives six diameters, and the temple of Diana eight.
What are triglyphs and metopes?
The triglyph is a block with channels, and the metope is the space between two triglyphs. Vitruvius says both come from the ends of wooden roof beams (IV.2.2). Cambridge University Press notes that this explanation has long been questioned.
Is the Parthenon a Doric temple?
Yes. The Perseus record at Tufts University calls it a Doric peripteral temple with eight columns on the front and seventeen on the flanks, dated about 447 to 432 BC.
Why are the corner metopes wider than the others?
The corner triglyph stands at the end of the frieze, not over the centre of the corner column. The metope beside it is wider by half a triglyph's width unless the builder shortens the corner intercolumniation (IV.3.2).
Did Vitruvius recommend the Doric order for temples?
Not without reservation. He says the ancient architects appeared to avoid it in sacred buildings because of the corner problem, and he then gives a layout that he says removes the defects (IV.3.1 to 5).

Sources

  1. Vitruvius, De Architectura (On Architecture), Book IV, Joseph Gwilt translation (1826), LacusCurtius edition by Bill Thayer · LacusCurtius, University of Chicago (Penelope) · Book IV, chapter 1 sections 1 to 8, chapter 2 sections 2 to 5, chapter 3 sections 1 to 9, chapter 7 sections 3 and 4
  2. Vitruvius, De Architectura (On Architecture), Book III, Joseph Gwilt translation (1826), LacusCurtius edition by Bill Thayer · LacusCurtius, University of Chicago (Penelope) · Book III, chapter 5 section 14
  3. Doric (Encyclopaedia Romana entry on the Doric order) · University of Chicago, Penelope, Encyclopaedia Romana
  4. Ionic Order (Encyclopaedia Romana) · University of Chicago, Penelope
  5. Review of Barletta, The Origins of the Greek Architectural Orders (2001) · Bryn Mawr Classical Review (Bryn Mawr College)
  6. The Five Orders of Architecture by Giacomo Barozzi of Vignola (translated by Tommaso Juglaris and Warren Locke, Boston, 1889) · Internet Archive (digitised copy) · Simple Doric intercolumniation plate
  7. Athens, Parthenon (Building), Perseus Catalog record · Tufts University, Perseus Digital Library
  8. The Parthenon (student web page, Classical Studies course CL 115) · Fairfield University, Department of Classical Studies
  9. The Making of the Doric Temple, Introduction · Cambridge University Press (Cambridge Core)