Ionic Order

The Ionic order is a Greek column style with a scrolled capital, a base and a slimmer shaft than the Doric, named after Ionia.

The Ionic order is a Greek column style known for the pair of scrolls, called volutes, on its capital and for a slimmer shaft than the Doric. It sits between the plainer Doric order and the more ornate Corinthian order. This page uses Vitruvius, the Encyclopaedia Romana and a Bryn Mawr Classical Review article. A reference such as IV.1.8 means Book IV, chapter 1, section 8 in the LacusCurtius edition, which is Joseph Gwilt's 1826 translation.

Where did the Ionic order come from?

The order takes its name from Ionia, the Greek-settled Aegean coast of Asia Minor, now in Turkey. The Encyclopaedia Romana says it was developed there in the mid-sixth century BC. It adds that the order appeared in Greece itself in the fifth century, where the best example is the Erechtheum on the Athenian Acropolis. Vitruvius gives the Ionians the credit: "That species, of which the Ionians were the inventors, has received the appellation of Ionic" (IV.1.8).

The Bryn Mawr Classical Review article reviews Barletta's study of the early orders. It reports the author's view that the Doric order does not appear before about 580 to 570 BC and the Ionic shortly after. It also reports that most Ionic features were set by the second quarter of the sixth century BC.

DateMilestoneSource
About 580 to 570 BCDoric order appears, Ionic shortly afterBryn Mawr Classical Review
Second quarter of the sixth century BCMost Ionic features establishedBryn Mawr Classical Review
Mid-sixth century BCIonic order developed in IoniaEncyclopaedia Romana
About 540 BCTemple of Apollo at Didyma begun, with the first three-band architrave in the review's accountBryn Mawr Classical Review
Fifth century BCOrder appears in Greece, with the Erechtheum as best exampleEncyclopaedia Romana

How is the Ionic capital built?

The volutes are the feature people notice first. Vitruvius says the builders of the temple of Diana added them to the capital "like graceful curling hair hanging on each side" (IV.1.7). The Encyclopaedia Romana calls the spiral scrolls the distinctive feature of the order.

Vitruvius gives two heights for the capital. Book IV says the Ionic capital is "but one third of the diameter of the shaft in height" (IV.1.1). Book III says the whole capital, including the volutes, is half a diameter high, and that the abacus is the lower diameter plus one eighteenth (III.5.5). He does not reconcile the two, so a designer who reads one chapter alone gets one number. The Ionic column also has a base. In Book III the base, with its plinth, is half a diameter high and a diameter and three eighths wide (III.5.1 and III.5.3). In Book IV he says the base was placed under the column "after the manner of a shoe to the foot" (IV.1.7).

How slender is an Ionic column compared with a Doric one?

Vitruvius records a change of taste. The first Doric column was six diameters high and the first Ionic eight, and later builders, "preferring a more slender proportion", gave the Doric seven diameters and the Ionic eight and a half (IV.1.6 to 8). Book III uses the same figure. In the eustyle temple, which he prefers, the columns are eight and a half diameters high (III.3.6 and III.3.7). The Ionic shaft has twenty-four flutes (III.5.14), a count the Encyclopaedia Romana repeats.

These figures are Vitruvius's prescriptions. They are not measurements of Greek buildings. The table sets the three orders side by side, using only figures he gives.

FeatureDoricIonicCorinthian
Column height in lower diameters7 (IV.1.8)8.5 (IV.1.8)Same as the Ionic (IV.1.1)
Capital heightOne module, half a diameter (IV.3.4)One third of a diameter (IV.1.1) or half (III.5.5)One full diameter (IV.1.1)
Capital formAbacus, echinus and neck (IV.3.4)Volutes (IV.1.7)Acanthus leaves (IV.1.9)
BaseNone, in the Encyclopaedia RomanaYes (III.5.3)Not compared here
ShaftTwenty faces (IV.3.9)Twenty-four flutes (III.5.14)Not compared here
Cornice detailMutules (IV.2.3)Dentils (IV.2.5)Borrowed from Doric or Ionic (IV.1.2)

What are dentils, and why do they matter on an Ionic building?

Dentils are small tooth-like blocks under the cornice. Vitruvius explains them by the roof structure: "in the Ionic order, the dentils imitate the projection of the common rafters" (IV.2.5). The Doric order uses mutules instead, which he likens to the projecting feet of the principal rafters. He adds that the Greeks never placed dentils below mutules, because the feet of common rafters cannot lie below those of principal rafters (IV.2.5). The dentil band is therefore the cornice detail that marks an Ionic design in his system.

How does the Ionic order differ from the Corinthian order?

Vitruvius says the Corinthian column is "of the same proportion as the Ionic" except in the capital (IV.1.1). The Corinthian capital is as tall as the shaft is thick, and the Ionic capital is a third of that thickness. The Corinthian capital comes from the acanthus story he tells in IV.1.9. Its cornice and other members are borrowed from the Doric or Ionic, or set out "according to the laws of the Ionic, with a sculptured frieze, dentils and a cornice" (IV.1.2). The Corinthian order entry covers it in full.

Were the first Ionic temples uniform?

No. The Bryn Mawr Classical Review article reports that the capital and the base kept changing well into the sixth century BC. It reports that neither the Temple of Artemis at Ephesos (about 560 to 550 BC) nor its "Ephesian" type can be treated as canonical. It also reports that the three-band architrave first appears at the Temple of Apollo at Didyma, begun around 540 BC. These are the reviewed author's claims. The practical point is that a sixth-century Ionic temple is not one fixed model. A dated example tells you more than a general label.

Does the Ionic column have one fixed set of proportions?

Not in Vitruvius. His capital height differs between Book III and Book IV, and his column height depends on the story told. The story gives eight diameters for the first Ionic column and eight and a half for the later one. The eustyle rule in Book III also gives eight and a half. Use his figures as a record of one Roman author's canon. A survey of a real building will show what its builders chose. For the parts above the column, see the entablature entry. For the support itself, see the column entry.

Frequently asked questions

What makes an Ionic capital recognisable?
It carries a pair of scroll-shaped volutes, which Vitruvius compares to curling hair (IV.1.7). The Encyclopaedia Romana calls them the distinctive feature of the order.
How tall is an Ionic column compared with a Doric one?
Vitruvius gives seven diameters for the later Doric column and eight and a half for the Ionic (IV.1.8). These are his canon, not measurements of surviving temples.
Where was the Ionic order invented?
The Encyclopaedia Romana places its development in Ionia, on the Aegean coast of Asia Minor, in the mid-sixth century BC. It reached Greece itself in the fifth century, with the Erechtheum as the best example.
Are dentils part of the Ionic order?
Yes. Vitruvius says Ionic works introduced dentils, which imitate the projection of the common rafters, while Doric works use mutules (IV.2.5).
How many flutes does an Ionic column have, and does it have a base?
Vitruvius gives twenty-four flutes (III.5.14) and a base half a diameter high, with its plinth (III.5.1 and III.5.3). The Encyclopaedia Romana also lists twenty-four flutes and a base.
Does Vitruvius give one height for the Ionic capital?
No. Book IV gives one third of the shaft diameter (IV.1.1), and Book III gives half a diameter including the volutes (III.5.5).

Sources

  1. Vitruvius, De Architectura (On Architecture), Book IV, Joseph Gwilt translation (1826), LacusCurtius edition by Bill Thayer · LacusCurtius, University of Chicago (Penelope) · Book IV, chapter 1 sections 1, 2, 6 to 9; chapter 2 sections 3 and 5; chapter 3 sections 4 and 9
  2. Vitruvius, De Architectura (On Architecture), Book III, Joseph Gwilt translation (1826), LacusCurtius edition by Bill Thayer · LacusCurtius, University of Chicago (Penelope) · Book III, chapter 3 sections 6 and 7; chapter 5 sections 1, 3, 5 and 14
  3. Ionic Order (Encyclopaedia Romana) · University of Chicago, Penelope
  4. Review of Barletta, The Origins of the Greek Architectural Orders (2001) · Bryn Mawr Classical Review (Bryn Mawr College)