Frieze
A frieze is the middle band of a classical entablature, between the architrave and cornice, often carved with triglyphs and metopes or a relief.
What is a frieze in classical architecture?
A frieze is the middle band of the entablature, the horizontal structure that sits on the columns. Classical entablatures have three layers. The architrave is at the bottom, the frieze is in the middle, and the cornice is at the top. The Encyclopaedia Romana entry on the Ionic order says the entablature is usually one quarter of the column height. The same entry says the frieze sometimes carried decoration, which is why the word came to mean a carved or painted band. In Slovak the term is vlys.
Vitruvius places the frieze (zophorus) directly over the architrave. The dentil band and the corona come above it (Book III, chapter 5, sections 10 and 11).
How does the Doric frieze work?
The Doric frieze alternates two kinds of element. Triglyphs are blocks with three vertical grooves. Metopes are the panels between them. The Encyclopaedia Romana entry on the Doric order says the triglyphs should be centred above the columns and the metopes should be square. It says artists painted the triglyphs blue and the metopes red.
Vitruvius explains the origin of the pattern in Book IV. Early builders laid beams that ran over the wall and cut off the projecting ends. They covered each cut end with a grooved tablet painted with blue wax. These tablets gave rise to the triglyph and the metope in the Doric order (Book IV, chapter 2, section 2). So the stone frieze repeats the ends of a wooden roof structure.
Vitruvius also gives layout rules. The triglyphs stand centrally over the columns, and the metopes should be as broad as they are high (Book IV, chapter 3, section 2). At the corners of the building the triglyph sits at the end of the frieze and not over the column centre. Then the metope next to it is wider than the others by half a triglyph, and he warns against stretching the metopes to hide this. His module scheme gives a different figure. There the metopes are one and a half modules high and one module wide (Book IV, chapter 3, section 4). The two passages do not agree, so treat the rules as the classical scheme and not as one fixed standard.
The metopes were the panels for figure sculpture. The Encyclopaedia Romana page refers to the carved marble metopes of the Parthenon.
How does the Ionic frieze differ from the Doric one?
The Ionic entablature has no triglyphs in either source. The Ionic entry lists an architrave in three bands, a frieze that sometimes carried decoration, and a cornice with dentils. The University of Texas page on the Parthenon says the building is basically a Doric temple. It also says the building has a continuous sculpted frieze that the architects took from the Ionic order. The table compares the two friezes on the points the sources support.
| Feature | Doric frieze | Ionic frieze |
|---|---|---|
| Division | Triglyphs alternate with metopes | No triglyphs. The Parthenon example is one continuous sculpted band |
| Vertical marks | Triglyphs have three vertical grooves | None described in the sources |
| Panels for sculpture | Metopes, square according to the Doric entry | The band itself, as in the Parthenon frieze |
| Decoration | Metopes carved in marble (Parthenon example) | Sometimes carries decoration, per the Ionic entry |
The Parthenon shows the mix. The Texas page says the sculpted frieze runs around the upper edge of the temple wall. It gives the height in feet and inches, which converts to about 104 cm. The page adds that the frieze is small and sits inside the line of the triglyphs and metopes. This made it hard to see from the ground. The building therefore has a Doric entablature with triglyphs and metopes outside, and a continuous frieze taken from the Ionic order inside.
How high is a frieze compared with the architrave?
For the Ionic order, Vitruvius gives a rule that links the frieze to the architrave. The frieze is one fourth lower than the architrave. If it carries sculpture, it is one fourth higher, so that the effect of the carving is not harmed (Book III, chapter 5, section 10). The frieze has its own cymatium, one seventh of its height. The next band, the dentil band, equals the middle fascia of the architrave in height (section 11).
For the Doric order, Book IV does not give a separate height for the triglyphs. It gives the architrave as one module, the metopes as one and a half modules, and the corona as half a module with its cymatia.
How is a frieze different from the architrave and the cornice?
The frieze is one of three bands. The architrave is the lowest. In the Ionic order it has three bands, each projecting beyond the one below. The cornice is the top band. In the Ionic entry it has block-like dentils, which the source says imitate the supporting beams of a wooden building. The Doric entry says the mutules under the geison imitate the projecting rafters of the roof. It says the peg-like guttae represent wooden dowels. Both orders therefore read the upper band as a translation of timber structure. The frieze sits between these two. The table sets the three bands side by side.
| Band | Position in the entablature | Feature named in the Ionic entry |
|---|---|---|
| Architrave | Lowest band | Divided into three bands that project beyond each other |
| Frieze | Middle band | Sometimes carries decoration |
| Cornice | Top band | Block-like dentils |
For the pediment that crowns the entablature on a temple front, see pediment. For the orders that carry the entablature, see the Doric order and the Ionic order.
Frequently asked questions
- What is a frieze?
- A frieze is the middle band of a classical entablature, between the architrave below and the cornice above. The entablature sits on the columns. The frieze is the layer that the Encyclopaedia Romana entry on the Ionic order says sometimes carried decoration.
- What is the difference between a Doric and an Ionic frieze?
- The Doric frieze alternates triglyphs, which are blocks with three vertical grooves, with metopes, which are the panels between them. The Ionic entablature has no triglyphs. The Parthenon is a Doric temple, and the University of Texas page says its continuous sculpted frieze comes from the Ionic order.
- Why does the Doric frieze have triglyphs?
- Vitruvius says that the triglyph and metope arose from the ends of the roof beams. Builders covered the cut beam ends with grooved tablets painted blue. The stone frieze then copied that timber detail.
- How high was the Parthenon frieze?
- The University of Texas page gives the height in feet and inches. The conversion is about 104 cm. The frieze runs around the upper edge of the temple wall, inside the line of the triglyphs and metopes.
- How high should a frieze be?
- For the Ionic order, Vitruvius sets the frieze one fourth lower than the architrave. If the frieze carries sculpture, he sets it one fourth higher, so that the carving is not lost (Book III, chapter 5, section 10). These are rules for temples, not a standard for houses.
Sources
- Vitruvius, The Ten Books on Architecture, Book IV (English translation) · Bill Thayer, LacusCurtius (University of Chicago Penelope site) · Book IV, chapter 2, section 2. chapter 3, sections 2, 4 and 5
- Vitruvius, The Ten Books on Architecture, Book III (chapter 5, Ionic order) · Bill Thayer, LacusCurtius (University of Chicago Penelope site) · Book III, chapter 5, sections 10 and 11
- Doric order (Encyclopaedia Romana) · University of Chicago, Penelope project
- Ionic order (Encyclopaedia Romana) · University of Chicago, Penelope project
- Parthenon (classical architecture course page) · University of Texas at Austin, art history course materials