Colonnade
A colonnade is a regularly spaced row of columns that carries a horizontal beam, forming a covered walkway, screen or building edge.
A colonnade is a row of columns that supports a horizontal beam instead of arches. It can form a covered walkway, a screen in front of a facade or the edge of an open court. The Slovak word is kolonáda. This page explains the term, how it differs from an arcade, and what the Roman writer Vitruvius said about the spacing of columns.
What is a colonnade in architecture?
A colonnade is a row of columns that carries horizontal members, called an architrave, rather than arches (University of Pittsburgh glossary). Historic England's teaching site uses the same word for columns used together in this way. The horizontal part that spans between the columns is the entablature. The beam over the columns is the simplest test: horizontal beams mean a colonnade, arches mean an arcade.
The columns themselves can follow one of the classical orders, but the definition does not require it. It names only a row of columns and a horizontal member above them. See the entry on the column for the column itself.
What does a colonnade carry on top?
Classical colonnades carry an entablature. It has three horizontal bands (Historic England, Looking at Buildings). The lowest band, usually left plain, is the architrave. The middle band is the frieze, which may be decorated or sculpted. The top band projects furthest and is the cornice. Each classical order goes with its own treatment of the entablature. In the Ionic order the architrave has three bands, each projecting beyond the one below. The cornice has block-like dentils that imitate the ends of the beams in a wooden building (Encyclopaedia Romana).
How is a colonnade different from an arcade?
The two words describe two ways of carrying load over a row of supports. A colonnade has a horizontal member above the columns. An arcade is a series of arches supported by columns or piers (University of Pittsburgh glossary). The table sets out the difference.
| Feature | Colonnade | Arcade |
|---|---|---|
| Supports | Columns | Columns or piers |
| What they carry | A horizontal member, such as an architrave | A series of arches |
| How to tell them apart on an elevation | A straight line above the capitals | Curved arches between the supports |
The portico has its own entry. A portico is a related term, but this page does not define it.
Where does the colonnade come from?
The form belongs to the classical architecture of Greece and Rome. The treatise De Architectura by the Roman architect Vitruvius is the clearest surviving account of how temple colonnades were proportioned. Book III deals with temples. Chapter 2 lists the temple types by how their columns are placed. In the type called peripteros, the columns stand all round the inner room. Their distance from its wall equals the space between two columns, which leaves a walk round the room. The type called prostylos has columns in front of the cell where the antae or pilasters of a simpler temple would stand.
Vitruvius says the rules for the best spacing came from the architect Hermogenes. The Encyclopaedia Romana says Hermogenes used the diameter of the column as the unit of measure for the temple colonnade. Changing one element then meant adjusting the others. Vitruvius adds that the wings of a temple gave people caught by rain room to walk under shelter (chapter 3, section 9).
How did Vitruvius set the spacing of columns?
Vitruvius names five species of temple by intercolumniation. This is the clear space between two columns, measured in column diameters. The table gives the figures as he states them. They are rules from a text, not a building-code requirement.
| Type (Vitruvius) | Spacing between columns, in column diameters | Where in Book III |
|---|---|---|
| Pycnostyle, columns set close together | 1.5 diameters | chapter 3, section 2 |
| Systyle | 2 diameters | chapter 3, section 2 |
| Eustyle, the best proportion | 2.25 diameters, and 3 at the centre of the front and the rear | chapter 3, sections 6 and 7 |
| Diastyle, columns set wide apart | 3 diameters | chapter 3, section 4 |
| Araeostyle, the widest type | No multiple given. The columns are placed further apart than they ought to be | chapter 3, section 1 |
Vitruvius gives a reason for each choice. He calls systyle and pycnostyle spacing faulty. Women going up the steps to pray cannot pass between the columns arm in arm, the doors are hidden, and the statues stand in shadow. In the diastyle type, he says, the architraves over the columns often fail because their bearings are too long. In the araeostyle type the architraves are of wood and not of stone or marble, and the temples are low, wide and heavy-roofed. He calls eustyle preferable for convenience, beauty and strength (chapter 3, sections 3 to 6).
How thick should the columns be for each spacing?
Vitruvius ties the thickness of the column to the spacing. He gives the diameter as a part of the column height, written here as diameter : height (chapter 3, sections 10 and 11).
| Type | Diameter : column height |
|---|---|
| Araeostyle | 1 : 8 |
| Diastyle and eustyle | 1 : 8.5 (the height divided into eight and a half parts) |
| Systyle | 1 : 9.5 |
| Pycnostyle | 1 : 10 |
His reasoning is that as the distances between the columns grow, the shafts must grow thicker. Widely spaced columns that are too slender look too delicate, because the air between them seems to reduce their thickness. Closely spaced columns that are too thick look heavy. He also says that corner columns have air playing freely round them. They should be one fiftieth of a diameter thicker than the rest. These are rules of appearance for temples, and they do not replace a structural calculation for a modern building.
How does Vitruvius divide the front of a eustyle temple?
For the eustyle he gives a method (chapter 3, section 7). Do not count the projections of base and plinth at each end. Divide the width of the front into 11.5 parts for four columns, 18 parts for six columns and 24.5 parts for eight columns. One part equals the diameter of one column. Each intercolumniation except the middle one, front and rear, equals two parts and a quarter. The middle one equals three parts. The columns are eight and a half parts high. The Encyclopaedia Romana gives the column height as nine and a half diameters. That differs from the 8.5 in Vitruvius, so this page uses the figure from Vitruvius.
What are the common misconceptions about colonnades?
- Any row of columns is a colonnade. The definition adds a horizontal member above the columns. A row of columns that carries arches is an arcade.
- Vitruvius sets a rule for every building. His figures describe temples in his text. They are a historical reference, and a modern building is designed to its own loads and use.
- A colonnade must use a classical order. The orders share codified forms for the column and its capital (Historic England). The definition of a colonnade names only the columns and the beam.
- All the columns in a row have the same thickness. Vitruvius makes the corner columns one fiftieth of a diameter thicker.
How can a reader check a colonnade on a drawing?
Look at the elevation above the capitals. A straight horizontal line shows a colonnade. In the classical case it is made of architrave, frieze and cornice. Curved arches show an arcade. For a classical colonnade, check the spacing against the column diameter, because Vitruvius and Hermogenes used that diameter as the unit.
Frequently asked questions
- What is the difference between a colonnade and an arcade?
- A colonnade is a row of columns that supports a horizontal member such as an architrave. An arcade is a series of arches supported by columns or piers. The top element, straight beam or curved arch, is the quickest way to tell them apart.
- What does intercolumniation mean?
- Intercolumniation is the clear space between two neighbouring columns. Vitruvius measured it in column diameters and named five types, from pycnostyle at one and a half diameters to diastyle at three. He gave araeostyle no fixed multiple.
- What is the best spacing of columns according to Vitruvius?
- Vitruvius calls the eustyle the best proportion. Its spaces are two and a quarter column diameters, with three at the centre of the front and the rear. He says it is preferable for convenience, beauty and strength.
- What does a colonnade carry above the columns?
- A classical colonnade carries an entablature. It is generally divided into three bands: the architrave at the bottom, the frieze in the middle and the cornice on top. Each classical order has its own treatment of it.
- Do colonnades have to use the classical orders?
- No. The definition of a colonnade names only a row of columns that supports a horizontal member. The classical orders are one way to shape the columns and the entablature, not a condition of the term.
Sources
- Vitruvius, De Architectura, Book III (Ten Books on Architecture), LacusCurtius edition · LacusCurtius (Bill Thayer), University of Chicago Penelope · Book III, chapter 2 sections 1 to 5; chapter 3 sections 1 to 11
- Ionic Order (Encyclopaedia Romana) · University of Chicago, Penelope
- Glossary of Medieval Art and Architecture: colonnade · University of Pittsburgh (Jane Vadnal, Glossary of Medieval Art and Architecture)
- Glossary of Medieval Art and Architecture: arcade · University of Pittsburgh (Jane Vadnal, Glossary of Medieval Art and Architecture)
- The orders · Looking at Buildings (Historic England education resource)