Portico
A portico is a roofed, porch-like space at the entrance of a building, supported by columns and often topped by a pediment.
What is a portico?
A portico is a roofed, porch-like space at the entrance of a building. A university architecture guide describes porticos as roofed, porch-like spaces, open along at least one side and usually associated with an entrance. They are supported by columns and often topped by a pediment. The same guide says a portico may project from the main building or sit recessed in it.
A nineteenth-century dictionary gives a similar meaning. Noah Webster's 1848 dictionary defines a portico as a covered space, enclosed by columns, at the entrance of a building. The National Gallery of Art quotes this entry. The definition names the two things that matter: a roof and columns, placed where people enter.
How has the meaning of portico changed?
The same 1848 entry says a portico was originally a colonnade or covered ambulatory, and only later a covered space at an entrance. An earlier Webster entry from 1828 calls it a kind of gallery on the ground. It also calls it a piazza encompassed with arches supported by columns, or a covered walk. It adds that the roof is sometimes flat and sometimes vaulted. So older English texts use the word for a covered walk, and recent guides use it for an entrance porch.
Vitruvius, the Roman writer on architecture, uses the word in the older sense. In Book III, chapter 2, section 5, he gives the portico of the theatre of Metellus as an example of a walk of columns round a building. In section 8 he compares the inner columns of a temple type called hypaethros to the peristyles of porticos.
How do the Vitruvian temple types arrange their columns?
Vitruvius lists temple types by how their columns are placed (Book III, chapter 2, sections 1 to 8). He does not call every front a portico, but modern writers use these names when they describe a columned front. The table sets out the types that he describes.
| Vitruvius term | Column arrangement as Vitruvius describes it |
|---|---|
| In antis | Two columns between the antae, which are pilasters in front of the cell walls, crowned with a pediment |
| Prostyle | Columns in front in place of the antae, opposite the antae at the angles of the cell, with an entablature that returns on each side |
| Amphiprostyle | A prostyle front, with the columns and pediment repeated at the rear |
| Peripteros | Six columns in front and rear, eleven on the flanks, counting the angle columns |
| Pseudodipteros | Eight columns in front and rear, fifteen on the sides, counting the angle columns |
The in antis, prostyle and amphiprostyle types have columns at the front, or at the front and rear. The peripteros has a walk all round the cell. Vitruvius was describing temples, not house entrances.
How is a portico different from a colonnade?
A portico and a colonnade are related but not the same. The Notre Dame guide defines a colonnade as rows of columns supporting an entablature and often one side of a roof. It also counts the spaces behind such a feature when they are long and used for circulation. A medieval-art glossary adds that a colonnade carries a horizontal architrave rather than arches. Webster's 1848 entry shows how close the two words are, since it says a portico was originally a colonnade.
| Feature | Portico | Colonnade |
|---|---|---|
| Core meaning | Roofed, porch-like space, usually at an entrance | Row of columns supporting an entablature |
| Roof | A roofed space in its own right | Often carries one side of a roof |
| Pediment | Often surmounted by a pediment | Not part of the definition |
| Position | May project from the building or be recessed into it | Can include long spaces used for circulation |
In 1769 a Georgia newspaper described a planned meetinghouse. It had "a Portico or Colonade" joined to the front and projecting eight feet. The writer used the two words for the same part of the building (National Gallery of Art).
Does a portico always have a pediment?
No. The university source says a portico is often topped by a pediment, not that it always is. The National Gallery of Art notes that early American porticos generally had a classical style. Columns carried a low-pitched roof, and the front had an entablature and pediment. It also names two well-known exceptions. One is the octagonal porch at Gunston Hall (1755 to 1758), which had ogee arches. The other is Latrobe's Gothic design for Sedgeley near Philadelphia (1799), which had tall slender posts under the roof.
Which column orders are used for porticos?
The order is a separate choice from the portico form. The National Gallery of Art names Doric, Tuscan and Corinthian porticos as examples. These are a Doric portico at Centre Square in Philadelphia and a Tuscan portico at The Woodlands near Philadelphia. A third is a portico of fluted Corinthian columns in William Ranlett's 1851 design for a villa at Oswego. They are examples from one region and period, not a rule for all porticos.
How do porticos and porches differ in everyday use?
The National Gallery of Art says portico is one of several words for covered walks or spaces. The others are piazza, porch and veranda. Columns or piers support them, and they attach to a building. The writers it quotes did not always keep the words apart. Andrew Jackson Downing, for example, used the word porch for the central area of a veranda leading to the entrance. Ranlett used piazza for a walk over which a roof might be added, and veranda for a structure that included a roof.
What role did the portico play in a garden?
In eighteenth and nineteenth century America the portico was also a viewing point and a focus in the landscape. Lewis Miller wrote in 1849 that the lofty portico at Mount Vernon had a pleasing effect when seen from the water. The National Gallery of Art adds that a portico often differed from the building in its material. That created a distant focus when seen from the garden.
Frequently asked questions
- Can a portico project from the building or be recessed into it?
- Yes. The University of Notre Dame architecture guide says a portico may project from the main building mass or be recessed in it.
- What did Vitruvius call a front with two columns between antae?
- He called the temple in antis. Antae are pilasters in front of the cell walls, and the two columns stand between them, crowned with a pediment.
- How did a nineteenth-century dictionary define a portico?
- Noah Webster's 1848 dictionary defined it as a covered space enclosed by columns at the entrance of a building. It adds that the word originally meant a colonnade or covered ambulatory.
- Is a portico the same as a colonnade?
- No. A colonnade is a row of columns supporting an entablature, while a portico is a roofed space at an entrance. Older texts use the two words for the same thing, so the line is not sharp.
- Does a portico always have a pediment?
- No. The Notre Dame guide says a portico is often topped by a pediment. The National Gallery of Art names the porch at Gunston Hall, with ogee arches, as a well-known exception to the classical front.
Sources
- The Ten Books on Architecture, Book III (Latin text with notes) · Bill Thayer, LacusCurtius (University of Chicago, Penelope) · Book III, chapter 2, sections 1 to 8
- Architecture Terms (Architecture Overview library guide) · University of Notre Dame, Hesburgh Libraries · Architecture Terms, entries Porticos, Colonnades, Pediments
- Glossary of Medieval Art and Architecture: colonnade · University of Pittsburgh (Jane Vadnal) · Entry: colonnade
- Portico (History of Early American Landscape Design) · National Gallery of Art, Center for Advanced Study in the Visual Arts · History and Usage sections